Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Metadata

ID: python-best-practices/function-variable-argument-name

Language: Python

Severity: Warning

Category: Best Practices

Description

A function parameter should only be read and not be modified. If your intent is to modify the value of the parameter, return the value in the function and handle the new value in the caller of the function.

Non-Compliant Code Examples

def func(arg1, arg2):
    arg1 = foo  # assign to a variable that is an argument
def func(arg1, arg2):
    (arg1, arg3, arg2) = foo  # assign to a variable that is an argument

Compliant Code Examples

def func(arg1, arg2):
    arg3 = foo
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers