AWS Kinesis Firehose stream destination modified

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detects when an AWS Kinesis Firehose Destination is modified.

Strategy

The rule monitors AWS Kinesis Firehose logs @eventSource:firehose.amazonaws.com and detects when the @evt.name is UpdateDestination.

Triage and response

  1. Determine if {{@userIdentity.arn}} is expected to perform the {{@evt.name}} API call on the account: {{@userIdentity.accountId}}.
  2. If the API call was not made by the user, rotate the user credentials and investigate what other APIs were successfully accessed.
    • Rotate the credentials.
    • Investigate if the same credentials made other unauthorized API calls.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers