Outbound access on all ports should be restricted

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Reduce the probability of a breach by checking EC2 security groups for outbound rules that allow unfettered access to any TCP/UDP ports and restrict access to IP addresses that require this port.

Rationale

Malicious activity, such as denial-of-service (DoS) and distributed denial-of-service (DDoS) attacks, can occur when permitting unfettered outbound access.

Remediation

From the console

Follow the Security group rules docs to learn how to add a security group rule that will restrict access to IP addresses that require a specific port.

From the command line

  1. Run revoke-security-group-egress to remove IP permissions for the selected EC2 security group.

    revoke-security-group-egress.sh

        aws ec2 revoke-security-group-egress
            --group-id your-group-id
            --ip-permissions '[{"IpProtocol": "tcp", "FromPort": 22, "ToPort": 22, "IpRanges": [{"CidrIp": "0.0.0.0/0"}]}]'
        
  2. Run authorize-security-group-egress with new parameters to restrict outbound access to specific destinations.

    authorize-security-group-egress.sh

        aws ec2 authorize-security-group-egress
            --group-id your-group-id
            --ip-permissions '[{"IpProtocol": "tcp", "FromPort": 22, "ToPort": 22, "IpRanges": [{"CidrIp": "0.0.0.0/0"}]}]'
        
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers