Site-to-Site VPN connection tunnels should be online

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

A VPN tunnel is an encrypted pathway that allows data to move securely between the customer network and AWS within an AWS Site-to-Site VPN connection. Each VPN connection includes two tunnels, which can operate simultaneously to ensure high availability. Keeping both VPN tunnels active is essential for maintaining a secure and resilient connection between an AWS VPC and your remote network.

Remediation

For instructions on configuring VPN tunnel options, refer to the Modifying Site-to-Site VPN tunnel options section in the AWS Site-to-Site VPN User Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers