AWS WAF traffic blocked by specific rule on multiple IPs

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detect when a specific AWS Web Application Firewall (WAF) rule blocks traffic from multiple IPs.

Strategy

The rule monitors AWS WAF logs and detects when the @system.action has a value of BLOCK.

Triage and response

  1. Inspect the @http.request_id: {{@http.request_id}} to confirm if this request should have been blocked or not.
  2. If the request should have been blocked, then navigate to the IP Investigation dashboard. Inspect other requests from the IP address:{{@network.client.ip}} to find any other potentially malicious behaviors from the IP.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers