Server parameter 'connection_throttling' should be enabled for PostgreSQL Database Server

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Enabling connection_throttling helps the PostgreSQL Database to set the verbosity of logged messages. This in turn generates query and error logs with respect to concurrent connections that could lead to a successful Denial of Service (DoS) attack by exhausting connection resources. A system can also fail or be degraded by an overload of legitimate users. Query and error logs can be used to identify, troubleshoot, and repair configuration errors and sub-optimal performance.

Remediation

From the console

  1. Log in to Azure Portal.
  2. Go to Azure Database for PostgreSQL server.
  3. For each database, click Server parameters.
  4. Search for connection_throttling.
  5. Click ON and save.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers