SQL Server instances should have the 'user connections' database flag set to a non-limiting value

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

It is recommended to check the user connections option for a GCP SQL Server instance to ensure that it is not artificially limiting connections.

Rationale

The user connections option specifies the maximum number of simultaneous user connections that are allowed on an instance of SQL Server. The actual number of user connections allowed also depends on the version of SQL Server that you are using, and also the limits of your application(s) and hardware. SQL Server allows a maximum of 32,767 user connections. Because user connections is by default a self-configuring value, SQL Server adjusts the maximum number of user connections automatically as needed, up to the maximum value allowed. For example, if only 10 users are logged in, then 10 user connection objects are allocated. In most cases, you do not have to change the value for this option. The default is 0, which means that the maximum (32,767) user connections are allowed. However, if there is a number defined here that limits connections, SQL Server will not allow any connections above this limit. If the connections are at the limit, any new requests will be dropped, potentially causing lost data or outages for those using the database.

Impact

Setting custom flags using the command line on certain instances will cause all omitted flags to be reset to defaults. This may cause you to lose custom flags and could result in unforeseen complications or instance restarts. Because of this, it is recommended you apply these flag changes during a period of low usage.

Remediation

Using the console

  1. Go to the Cloud SQL Instances page in the Google Cloud Console.
  2. Select the SQL Server instance for which you want to enable to database flag.
  3. Click Edit.
  4. Scroll down to the Flags section.
  5. Click Add item to set a flag that has not been set on the instance before. Choose the flag user connections from the drop-down menu, and set its value to your organization’s recommended value.
  6. Click Save to save your changes.
  7. Confirm your changes under the Flags section on the Overview page.

Using the command line

  1. Configure the user connections database flag for every GCP SQL Server database instance using the below command.
    gcloud sql instances patch <INSTANCE_NAME> --database-flags "userconnections=[0-32,767]"
    

Note: This command will overwrite all database flags previously set. To keep the flags previously set and add new ones, include the values for all flags you want set on the instance; any flag not specifically included is set to its default value. For flags that do not take a value, specify the flag name followed by an equals sign (=).

Default value

By default user connections is set to ‘0’, which does not limit the number of connections and allows the server to facilitate a maximum of 32,767 connections.

References

  1. https://cloud.google.com/sql/docs/sqlserver/flags
  2. https://docs.microsoft.com/en-us/sql/database-engine/configure-windows/configure-the-user-connections-server-configuration-option?view=sql-server-ver15
  3. https://www.stigviewer.com/stig/ms_sql_server_2016_instance/2018-03-09/finding/V-79119

Additional Information

WARNING: This patch modifies database flag values, which may require your instance to be restarted. Check the list of supported flags to see if your instance will be restarted when this patch is submitted.

Note: Some database flag settings can affect instance availability or stability, and remove the instance from the Cloud SQL SLA. For information about these flags, see Operational Guidelines.

Note: Configuring the above flag does not restart the GCP SQL instance.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers