GitHub Dependabot configuration changed

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Goal

Detect when a GitHub Dependabot setting has been disabled.

Strategy

This rule monitors GitHub audit logs for when a Dependabot setting has been disabled. Dependabot will alert developers when a repository is using a software dependency with a known vulnerability. Disabling these settings could lead to a degradation in the organization’s security posture.

Triage and response

  1. Determine if the change taken by {{@github.actor}} is authorized.
  2. If the change was not authorized or was unexpected, begin your organization’s incident response process and investigate.
  • 3 January 2025 - update detection rule severity from High to Medium and Medium to Low on several cases.
  • 3 January 2025 - update naming of rule.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers