The Controller Manager API service should be bound to localhost

Set up the kubernetes integration.

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The Controller Manager service should not be bound to a non-loopback address. The Controller Manager API service which runs on port 10252/TCP by default is used for health and metrics information and is available without authentication or encryption.

Remediation

Edit the Controller Manager pod specification file /etc/kubernetes/manifests/kube-controller-manager.yaml on the master node and ensure the correct value for the --bind-address parameter. For example, --bind-address=127.0.0.1.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers