The scheduler API service should not be bound to non-loopback insecure addresses

Set up the kubernetes integration.

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The scheduler service should not be bound to non-loopback addresses. The Scheduler API service which runs on port 10251/TCP by default is used for health and metrics information and is available without authentication or encryption. As such, it should only be bound to a localhost interface to minimize the cluster’s attack surface.

Remediation

Edit the Scheduler pod specification file /etc/kubernetes/manifests/kube-scheduler.yaml on the master node and ensure the correct value for the --bind-address parameter. For example, --bind-address=127.0.0.1.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers