Ensure the Default Umask is Set Correctly For Interactive Users

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Remove the UMASK environment variable from all interactive users initialization files.

Rationale

The umask controls the default access mode assigned to newly created files. A umask of 077 limits new files to mode 700 or less permissive. Although umask can be represented as a four-digit number, the first digit representing special access modes is typically ignored or required to be 0. This requirement applies to the globally configured system defaults and the local interactive user defaults for each account on the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers