Add nodev Option to Removable Media Partitions

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The nodev mount option prevents files from being interpreted as character or block devices. Legitimate character and block devices should exist only in the /dev directory on the root partition or within chroot jails built for system services. Add the nodev option to the fourth column of /etc/fstab for the line which controls mounting of

any removable media partitions.

Rationale

The only legitimate location for device files is the /dev directory located on the root partition. An exception to this is chroot jails, and it is not advised to set nodev on partitions which contain their root filesystems.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if [ ! -f /.dockerenv ] && [ ! -f /run/.containerenv ]; then

var_removable_partition='<xccdf-1.2:sub idref="xccdf_org.ssgproject.content_value_var_removable_partition" use="legacy"/>'


device_regex="^\s*$var_removable_partition\s\+"
mount_option="nodev"

if grep -q $device_regex /etc/fstab ; then
    previous_opts=$(grep $device_regex /etc/fstab | awk '{print $4}')
    sed -i "s|\($device_regex.*$previous_opts\)|\1,$mount_option|" /etc/fstab
else
    echo "Not remediating, because there is no record of $var_removable_partition in /etc/fstab" >&2
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: XCCDF Value var_removable_partition # promote to variable
  set_fact:
    var_removable_partition: !!str <xccdf-1.2:sub idref="xccdf_org.ssgproject.content_value_var_removable_partition" use="legacy"/>
  tags:
    - always

- name: Ensure permission nodev are set on var_removable_partition
  lineinfile:
    path: /etc/fstab
    regexp: ^\s*({{ var_removable_partition }})\s+([^\s]*)\s+([^\s]*)\s+([^\s]*)(.*)$
    backrefs: true
    line: \1 \2 \3 \4,nodev \5
  when: ansible_virtualization_type not in ["docker", "lxc", "openvz", "podman", "container"]
  tags:
  - CCE-80146-4
  - NIST-800-53-AC-6
  - NIST-800-53-AC-6(1)
  - NIST-800-53-CM-6(a)
  - NIST-800-53-CM-7(a)
  - NIST-800-53-CM-7(b)
  - NIST-800-53-MP-7
  - configure_strategy
  - high_disruption
  - low_complexity
  - medium_severity
  - mount_option_nodev_removable_partitions
  - no_reboot_needed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers