Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The libselinux package can be installed with the following command:


$ sudo yum install libselinux

Rationale

Security-enhanced Linux is a feature of the Linux kernel and a number of utilities with enhanced security functionality designed to add mandatory access controls to Linux. The libselinux package contains the core library of the Security-enhanced Linux system.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if [ ! -f /.dockerenv ] && [ ! -f /run/.containerenv ]; then

if ! rpm -q --quiet "libselinux" ; then
    yum install -y "libselinux"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Ensure libselinux is installed
  package:
    name: libselinux
    state: present
  when: ansible_virtualization_type not in ["docker", "lxc", "openvz", "podman", "container"]
  tags:
  - CCE-82876-4
  - PCI-DSSv4-1.2.6
  - enable_strategy
  - high_severity
  - low_complexity
  - low_disruption
  - no_reboot_needed
  - package_libselinux_installed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers