Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

nftables provides a new in-kernel packet classification framework that is based on a network-specific Virtual Machine (VM) and a new nft userspace command line tool. nftables reuses the existing Netfilter subsystems such as the existing hook infrastructure, the connection tracking system, NAT, userspace queuing and logging subsystem. The nftables package can be installed with the following command:


$ apt-get install nftables

Rationale

nftables is a subsystem of the Linux kernel that can protect against threats originating from within a corporate network to include malicious mobile code and poorly configured software on a host.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if ( dpkg-query --show --showformat='${db:Status-Status}
' 'kernel' 2>/dev/null | grep -q installed ); then

DEBIAN_FRONTEND=noninteractive apt-get install -y "nftables"

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - PCI-DSSv4-1.2
  - PCI-DSSv4-1.2.1
  - enable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_nftables_installed

- name: Ensure nftables is installed
  package:
    name: nftables
    state: present
  when: ( "kernel" in ansible_facts.packages )
  tags:
  - PCI-DSSv4-1.2
  - PCI-DSSv4-1.2.1
  - enable_strategy
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - package_nftables_installed
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers