Require Authentication for Single User Mode

Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

Single-user mode is intended as a system recovery method, providing a single user root access to the system by providing a boot option at startup.

By default, single-user mode is protected by requiring a password and is set in /usr/lib/systemd/system/rescue.service.

Rationale

This prevents attackers with physical access from trivially bypassing security on the machine and gaining root access. Such accesses are further prevented by configuring the bootloader password.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if [ ! -f /.dockerenv ] && [ ! -f /run/.containerenv ]; then

service_file="/usr/lib/systemd/system/rescue.service"

sulogin='/bin/sh -c "/usr/sbin/sulogin; /usr/bin/systemctl --fail --no-block default"'

if grep "^ExecStart=.*" "$service_file" ; then
    sed -i "s%^ExecStart=.*%ExecStart=-$sulogin%" "$service_file"
else
    echo "ExecStart=-$sulogin" >> "$service_file"
fi

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Require single user mode password
  lineinfile:
    create: true
    dest: /usr/lib/systemd/system/rescue.service
    regexp: ^#?ExecStart=
    line: ExecStart=-/bin/sh -c "/usr/sbin/sulogin; /usr/bin/systemctl --fail --no-block
      default"
  when: ansible_virtualization_type not in ["docker", "lxc", "openvz", "podman", "container"]
  tags:
  - CCE-27287-2
  - DISA-STIG-RHEL-07-010481
  - NIST-800-171-3.1.1
  - NIST-800-171-3.4.5
  - NIST-800-53-AC-3
  - NIST-800-53-CM-6(a)
  - NIST-800-53-IA-2
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - require_singleuser_auth
  - restrict_strategy
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers