Cette page n'est pas encore disponible en français, sa traduction est en cours.
Si vous avez des questions ou des retours sur notre projet de traduction actuel, n'hésitez pas à nous contacter.

Description

The MaxStartups parameter specifies the maximum number of concurrent unauthenticated connections to the SSH daemon. Additional connections will be dropped until authentication succeeds or the LoginGraceTime expires for a connection. To configure MaxStartups, you should add or edit the following line in the /etc/ssh/sshd_config file:

MaxStartups 10:30:60
        

Rationale

To protect a system from denial of service due to a large number of pending authentication connection attempts, use the rate limiting function of MaxStartups to protect availability of sshd logins and prevent overwhelming the daemon.

Remediation

Shell script

The following script can be run on the host to remediate the issue.

#!/bin/bash

# Remediation is applicable only in certain platforms
if dpkg-query --show --showformat='${db:Status-Status}
' 'kernel' 2>/dev/null | grep -q installed; then

var_sshd_set_maxstartups='10:30:60'


mkdir -p /etc/ssh/sshd_config.d
touch /etc/ssh/sshd_config.d/00-complianceascode-hardening.conf

LC_ALL=C sed -i "/^\s*MaxStartups\s\+/Id" "/etc/ssh/sshd_config"
LC_ALL=C sed -i "/^\s*MaxStartups\s\+/Id" "/etc/ssh/sshd_config.d"/*.conf
if [ -e "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf" ] ; then
    
    LC_ALL=C sed -i "/^\s*MaxStartups\s\+/Id" "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf"
else
    touch "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf"
fi
# make sure file has newline at the end
sed -i -e '$a\' "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf"

cp "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf" "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf.bak"
# Insert at the beginning of the file
printf '%s\n' "MaxStartups $var_sshd_set_maxstartups" > "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf"
cat "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf.bak" >> "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf"
# Clean up after ourselves.
rm "/etc/ssh/sshd_config.d/00-complianceascode-hardening.conf.bak"

else
    >&2 echo 'Remediation is not applicable, nothing was done'
fi

Ansible playbook

The following playbook can be run with Ansible to remediate the issue.

- name: Gather the package facts
  package_facts:
    manager: auto
  tags:
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sshd_set_maxstartups
- name: XCCDF Value var_sshd_set_maxstartups # promote to variable
  set_fact:
    var_sshd_set_maxstartups: !!str 10:30:60
  tags:
    - always

- name: Ensure SSH MaxStartups is configured
  block:

  - name: Deduplicate values from /etc/ssh/sshd_config
    lineinfile:
      path: /etc/ssh/sshd_config
      create: false
      regexp: (?i)(?i)^\s*{{ "MaxStartups"| regex_escape }}\s+
      state: absent

  - name: Check if /etc/ssh/sshd_config.d exists
    stat:
      path: /etc/ssh/sshd_config.d
    register: _etc_ssh_sshd_config_d_exists

  - name: Check if the parameter MaxStartups is present in /etc/ssh/sshd_config.d
    find:
      paths: /etc/ssh/sshd_config.d
      recurse: 'yes'
      follow: 'no'
      contains: (?i)^\s*{{ "MaxStartups"| regex_escape }}\s+
    register: _etc_ssh_sshd_config_d_has_parameter
    when: _etc_ssh_sshd_config_d_exists.stat.isdir is defined and _etc_ssh_sshd_config_d_exists.stat.isdir

  - name: Remove parameter from files in /etc/ssh/sshd_config.d
    lineinfile:
      path: '{{ item.path }}'
      create: false
      regexp: (?i)(?i)^\s*{{ "MaxStartups"| regex_escape }}\s+
      state: absent
    with_items: '{{ _etc_ssh_sshd_config_d_has_parameter.files }}'
    when: _etc_ssh_sshd_config_d_has_parameter.matched

  - name: Insert correct line to /etc/ssh/sshd_config.d/00-complianceascode-hardening.conf
    lineinfile:
      path: /etc/ssh/sshd_config.d/00-complianceascode-hardening.conf
      create: true
      regexp: (?i)(?i)^\s*{{ "MaxStartups"| regex_escape }}\s+
      line: MaxStartups {{ var_sshd_set_maxstartups }}
      state: present
      insertbefore: BOF
      validate: /usr/sbin/sshd -t -f %s
  when: '"kernel" in ansible_facts.packages'
  tags:
  - PCI-DSSv4-2.2
  - PCI-DSSv4-2.2.6
  - low_complexity
  - low_disruption
  - medium_severity
  - no_reboot_needed
  - restrict_strategy
  - sshd_set_maxstartups
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers