Aerospike

Supported OS Linux

Integration version4.1.0

Overview

Get metrics from Aerospike Database in real time to:

  • Visualize and monitor Aerospike states.
  • Be notified about Aerospike failovers and events.

Setup

NOTE: The current aerospike integration is only compatible with Aerospike server v4.9 or above, see Aerospike’s Python Client Library Release Notes for more info. If you use an older Aerospike server version, it is still possible to monitor it with version 7.29.0 or lower of the Datadog Agent.

Installation

The Aerospike check is included in the Datadog Agent package. No additional installation is needed on your server.

Configuration

Host

Metric collection

To configure this check for an Agent running on a host:

  1. Install and configure the Aerospike Prometheus Exporter- refer to Aerospike’s documentation for more details.

  2. Edit the aerospike.d/conf.yaml file, in the conf.d/ folder at the root of your Agent’s configuration directory to start collecting your Aerospike performance data. See the sample aerospike.d/conf.yaml for all available configuration options.

  3. Restart the Agent.

Note: Version 1.16.0+ of this check uses OpenMetrics for metric collection, which requires Python 3. For hosts that are unable to use Python 3, or if you would like to use a legacy version of this check, refer to the example config.

Log collection
  1. Collecting logs is disabled by default in the Datadog Agent, you need to enable it in datadog.yaml:

    logs_enabled: true
    
  2. Add this configuration block to your aerospike.d/conf.yaml file to start collecting your Aerospike Logs:

    logs:
      - type: file
        path: /var/log/aerospike/aerospike.log
        source: aerospike
    

    Change the path parameter value and configure them for your environment. See the sample aerospike.d/conf.yaml for all available configuration options.

  3. Restart the Agent.

Containerized

For containerized environments, see Configure integrations with Autodiscovery on Kubernetes or Configure integrations with Autodiscovery on Docker for guidance on applying the parameters below. See the sample aerospike.d/conf.yaml for all available configuration options.

Metric collection
ParameterValue
<INTEGRATION_NAME>aerospike
<INIT_CONFIG>blank or {}
<INSTANCES_CONFIG>{"openmetrics_endpoint": "http://%%host%%:9145/metrics"}

Example

Apply the following annotation to your pod, where <CONTAINER_NAME> is the Aerospike container name or a custom identifier:

ad.datadoghq.com/<CONTAINER_NAME>.checks: |
  {
    "aerospike": {
      "init_config": {},
      "instances": [{"openmetrics_endpoint": "http://%%host%%:9145/metrics"}]
    }
  } 
Log collection

Available for Agent versions >6.0

Collecting logs is disabled by default in the Datadog Agent. To enable it, see Kubernetes Log Collection.

ParameterValue
<LOG_CONFIG>{"source": "aerospike", "service": "<SERVICE_NAME>"}

Example

Apply the following annotation to your pod, where <CONTAINER_NAME> is the Aerospike container name or a custom identifier:

ad.datadoghq.com/<CONTAINER_NAME>.logs: |
  [
    {
      "type": "file",
      "path": "/var/log/aerospike/aerospike.log",
      "source": "aerospike"
    } 
  ]

Validation

Run the Agent’s status subcommand and look for aerospike under the Checks section.

Data Collected

Metrics

aerospike.aggr_scans_failed
(gauge)
[Legacy] The number of scans aborted. Deprecated since 3.9
aerospike.aggr_scans_succeeded
(gauge)
[Legacy] The number of aggregation scans that completed successfully. Deprecated since 3.9
aerospike.basic_scans_failed
(gauge)
[Legacy] The number of basic scans that failed. Deprecated since 3.9
aerospike.basic_scans_succeeded
(gauge)
[Legacy] The number of basic scans that completed successfully. Deprecates since 3.9
aerospike.batch_error
(gauge)
[Legacy] The number of batch direct requests that were rejected because of errors.
aerospike.batch_errors
(gauge)
[Legacy] The number of batch direct requests that were rejected because of errors. Deprecated since 3.9
aerospike.batch_index_complete
(gauge)
[Legacy] The number of batch index requests completed.
aerospike.batch_index_created_buffers
(gauge)
[Legacy] The number of 128KB response buffers created.
aerospike.batch_index_delay
(gauge)
[Legacy] The number of times a batch index response buffer has been delayed (WOULDBLOCK on the send).
aerospike.batch_index_destroyed_buffers
(gauge)
[Legacy] The number of 128KB response buffers destroyed.
aerospike.batch_index_error
(gauge)
[Legacy] The number of batch index requests that were rejected because of errors.
aerospike.batch_index_errors
(gauge)
[Legacy] The number of batch index requests that were rejected because of errors. Deprecated since 3.9
aerospike.batch_index_huge_buffers
(gauge)
[Legacy] The number temporary response buffers created that exceeded 128KB.
aerospike.batch_index_initiate
(gauge)
[Legacy] The number of batch index requests received.
aerospike.batch_index_proto_compression_ratio
(gauge)
[Legacy] This measures the average compressed size to uncompressed size ratio for protocol message data in batch index responses.
aerospike.batch_index_proto_uncompressed_pct
(gauge)
[Legacy] This measures the percentage of batch index responses with uncompressed protocol message data.
Shown as percent
aerospike.batch_index_timeout
(gauge)
[Legacy] The number of batch index requests that timed-out on the server before being processed.
aerospike.batch_index_unused_buffers
(gauge)
[Legacy] The number of available 128 KB response buffers currently in buffer pool.
aerospike.batch_initiate
(gauge)
[Legacy] The number of batch direct requests received.
aerospike.batch_queue
(gauge)
[Legacy] The number of batch direct requests remaining on the queue awaiting processing.
aerospike.batch_timeout
(gauge)
[Legacy] The number of batch direct requests that timed-out on the server before being processed.
aerospike.batch_tree_count
(gauge)
[Legacy] The number of tree lookups for all batch direct requests. Deprecated since 3.9
aerospike.client_connections
(gauge)
[Legacy] The number of active client connections to this node
aerospike.cluster_clock_skew_ms
(gauge)
[Legacy] The current maximum clock skew in milliseconds between nodes cluster.
Shown as millisecond
aerospike.cluster_clock_skew_stop_writes_sec
(gauge)
[Legacy] The threshold at which any namespace that is set to strong-consistency will stop accepting writes due to clock skew (clusterclockskew_ms).
Shown as second
aerospike.cluster_generation
(gauge)
[Legacy] A 64 bit unsigned integer incremented on a node for every successful cluster partition re-balance or transition to orphan state.
aerospike.cluster_integrity
(gauge)
[Legacy] Indicates whether the cluster is in a whole and complete state (as far as the nodes that it sees and is able to connect to are all concerned.)
aerospike.cluster_is_member
(gauge)
[Legacy]
aerospike.cluster_key
(gauge)
[Legacy] A randomly generated 64 bit hexadecimal string used to name the last Paxos cluster state agreement.
aerospike.cluster_max_compatibility_id
(gauge)
[Legacy] The cluster's maximum software version.
aerospike.cluster_min_compatibility_id
(gauge)
[Legacy] The cluster's minimum software version.
aerospike.cluster_principal
(gauge)
[Legacy] This specifies the Node ID of the current cluster principal. Will be '0' on an orphan node.
aerospike.cluster_size
(gauge)
[Legacy] The size of the cluster
aerospike.data_used_bytes_memory
(gauge)
[Legacy] The amount of memory occupied by data. Deprecated since 3.9.
Shown as byte
aerospike.datacenter.dc_as_open_conn
(gauge)
[Legacy] The number of open connection to the Aerospike DC. [Removed in 5.0.0]
Shown as connection
aerospike.datacenter.dc_as_size
(gauge)
[Legacy] The cluster size of the destination Aerospike DC. [Removed in 5.0.0]
aerospike.datacenter.dc_deletes_shipped
(gauge)
[Legacy] The number of delete transactions that have been successfully shipped. [Removed in 5.0.0]
Shown as transaction
aerospike.datacenter.dc_err_ship_client
(gauge)
[Legacy] The number of client layer errors while shipping records for this DC. Errors include timeout [Removed in 5.0.0], bad network fd, etc.
Shown as error
aerospike.datacenter.dc_err_ship_server
(gauge)
[Legacy] The number of errors from the remote cluster(s) while shipping records for this DC. Errors include out-of-space, key-busy, etc. [Removed in 5.0.0]
Shown as error
aerospike.datacenter.dc_esmt_bytes_shipped
(gauge)
[Legacy] The number of bytes shipped for this DC. [Removed in 5.0.0]
Shown as byte
aerospike.datacenter.dc_http_good_locations
(gauge)
[Legacy] The number of URLs that are considered healthy and being used by the change notification system. [Removed in 5.0.0]
aerospike.datacenter.dc_http_locations
(gauge)
[Legacy] The number of URLs configured for the HTTP destination. [Removed in 5.0.0]
aerospike.datacenter.dc_latency_avg_ship
(gauge)
[Legacy] The moving average of shipping latency for the specific DC. [Removed in 5.0.0]
aerospike.datacenter.dc_open_conn
(gauge)
[Legacy] The number of open connection to the DC. If the DC accepts pipeline writes, there will be 64 connections per destination node. [Removed in 5.0.0]
Shown as connection
aerospike.datacenter.dc_recs_inflight
(gauge)
[Legacy] The number of records that are inflight (which have been shipped but for which a response from the remote DC has not yet been received). [Removed in 5.0.0]
Shown as record
aerospike.datacenter.dc_recs_shipped
(gauge)
[Legacy] The number of records that have been attempted to be shipped, but could have resulted in either success or error. [Removed in 5.0.0]
Shown as record
aerospike.datacenter.dc_recs_shipped_ok
(gauge)
[Legacy] The number of records that have been successfully shipped. [Removed in 5.0.0]
Shown as record
aerospike.datacenter.dc_remote_ship_avg_sleep
(gauge)
[Legacy] The average number of ms of sleep for each record being shipped. [Removed in 5.0.0]
Shown as millisecond
aerospike.datacenter.dc_ship_attempts
(gauge)
[Legacy] The number of records that have been attempted to be shipped, but could have resulted in either success or error. [Removed in 5.0.0]
Shown as record
aerospike.datacenter.dc_ship_bytes
(gauge)
[Legacy] The number of bytes shipped for this DC. [Removed in 5.0.0]
Shown as byte
aerospike.datacenter.dc_ship_delete_success
(gauge)
[Legacy] The number of delete transactions that have been successfully shipped. [Removed in 5.0.0]
Shown as transaction
aerospike.datacenter.dc_ship_destination_error
(gauge)
[Legacy] The number of errors from the remote cluster(s) while shipping records for this DC. [Removed in 5.0.0]
Shown as error
aerospike.datacenter.dc_ship_idle_avg
(gauge)
[Legacy] The average number of ms of sleep for each record being shipped. [Removed in 5.0.0]
Shown as millisecond
aerospike.datacenter.dc_ship_idle_avg_pct
(gauge)
[Legacy] The representation in percent of total time spent for dcshipidle_avg. [Removed in 5.0.0]
Shown as percent
aerospike.datacenter.dc_ship_inflight_objects
(gauge)
[Legacy] The number of records that are inflight (which have been shipped but for which a response from the remote DC has not yet been received). [Removed in 5.0.0]
Shown as record
aerospike.datacenter.dc_ship_latency_avg
(gauge)
[Legacy] The moving average of shipping latency for the specific DC. [Removed in 5.0.0]
aerospike.datacenter.dc_ship_source_error
(gauge)
[Legacy] The number of client layer errors while shipping records for this DC. [Removed in 5.0.0]
Shown as error
aerospike.datacenter.dc_ship_success
(gauge)
[Legacy] The number of records that have been successfully shipped. [Removed in 5.0.0]
Shown as record
aerospike.datacenter.dc_size
(gauge)
[Legacy] The cluster size of the destination DC. [Removed in 5.0.0]
aerospike.datacenter.dc_state
(gauge)
[Legacy] The state of the DC. [Removed in 5.0.0]
aerospike.datacenter.dc_timelag
(gauge)
[Legacy] The time lag for this specific DC. [Removed in 5.0.0]
aerospike.delete_queue
(gauge)
[Legacy]
aerospike.demarshal_error
(gauge)
[Legacy] The number of errors during the demarshal step.
aerospike.dlog_free_pct
(gauge)
[Legacy] The percentage of the digest log free and available for use.
Shown as percent
aerospike.dlog_logged
(gauge)
[Legacy] The number of records logged into digest log.
Shown as record
aerospike.dlog_overwritten_error
(gauge)
[Legacy] The number of digest log entries that got overwritten.
Shown as record
aerospike.dlog_processed_link_down
(gauge)
[Legacy] The number of linkdown that were processed.
aerospike.dlog_processed_main
(gauge)
[Legacy] The number of records processed on the local Aerospike server.
aerospike.dlog_processed_replica
(gauge)
[Legacy] The number of records processed for a node in the cluster that is not the local node.
aerospike.dlog_relogged
(gauge)
[Legacy] The number of records relogged by this node into the digest log due to temporary issues when attempting to ship.
Shown as record
aerospike.dlog_used_objects
(gauge)
[Legacy] The total number of records slots used in the digest log
Shown as record
aerospike.early_tsvc_batch_sub_error
(gauge)
[Legacy] The number of errors early in the transaction for batch sub transactions.
aerospike.early_tsvc_client_error
(gauge)
[Legacy] The number of errors early in the transaction for direct client requests.
aerospike.early_tsvc_from_proxy_batch_sub_error
(gauge)
[Legacy] The number of errors early in the transaction for batch sub transactions proxied from another node.
Shown as error
aerospike.early_tsvc_from_proxy_error
(gauge)
[Legacy] The number of errors early in the transaction for transactions (other than batch sub transactions) proxied from another node.
Shown as error
aerospike.early_tsvc_ops_sub_error
(gauge)
[Legacy] The number of errors early in an internal ops sub transaction (ops scan/query).
Shown as error
aerospike.early_tsvc_udf_sub_error
(gauge)
[Legacy] The number of errors early in the transaction for udf sub transactions.
aerospike.err_duplicate_proxy_request
(gauge)
[Legacy] The number of duplicate proxy errors. Deprecated since 3.9
aerospike.err_out_of_space
(gauge)
[Legacy] The number of writes resulting in disk out of space errors. Deprecated since 3.9
aerospike.err_recs_dropped
(gauge)
[Legacy]
aerospike.err_replica_non_null_node
(gauge)
[Legacy] The number of errors during cluster state exchange because of unexpected replica node information. Deprecated since 3.9
aerospike.err_replica_null_node
(gauge)
[Legacy] The number of errors during cluster state exchange because of missing replica node information. Deprecated since 3.9
aerospike.err_rw_cant_put_unique
(gauge)
[Legacy] The number of write transactions aborted because write required unique and record existed already. Deprecated since 3.9
aerospike.err_rw_pending_limit
(gauge)
[Legacy] The number of read/write transactions failed on 'hot keys'. Deprecated since 3.9
aerospike.err_rw_request_not_found
(gauge)
[Legacy] The number of read/write transactions started but could not find record in rw hash after the replica side of the transaction is processed (due to timeout that would remove the record from rw hash). Deprecated in 3.9
aerospike.err_storage_queue_full
(gauge)
[Legacy] The number of non-read requests failed due to disk being too backed up. Will return 'DEVICEOVERLOAD' failure to client. See also storagemaxwritecache. Deprecated since 3.9
aerospike.err_sync_copy_null_master
(gauge)
[Legacy] The number of errors during cluster state exchange because of missing master node information. Deprecated since 3.9
aerospike.err_sync_copy_null_node
(gauge)
[Legacy] The number of errors during cluster state exchange because of missing general node information. Deprecated since 3.9
aerospike.err_tsvc_requests
(gauge)
[Legacy] The number of failures where the execution is not even attempted. Deprecated since 3.9
aerospike.err_tsvc_requests_timeout
(gauge)
[Legacy] The number of failures where the execution times out while in the transaction queue. Deprecated since 3.9
aerospike.err_write_fail_bin_exists
(gauge)
[Legacy] The number of write requests resulting in error 'bin exists'. Deprecated since 3.9
aerospike.err_write_fail_bin_name
(gauge)
[Legacy] The number of write requests resulting in error 'bin name'. Deprecated since 3.9
aerospike.err_write_fail_bin_not_found
(gauge)
[Legacy] The number of write requests resulting in error 'bin not found'. Deprecated since 3.9
aerospike.err_write_fail_forbidden
(gauge)
[Legacy] The number of write requests failed because a write transaction is being attempted on a set still being deleted. Deprecated since 3.9
aerospike.err_write_fail_generation
(gauge)
[Legacy] The number of write requests failed because of generation mismatch. Deprecated since 3.9
aerospike.err_write_fail_generation_xdr
(gauge)
[Legacy] The number of write requests from XDR that failed because of generation mismatch. Deprecated since 3.8.1
aerospike.err_write_fail_incompatible_type
(gauge)
[Legacy] The number of write requests which are not integer. Deprecated since 3.9
aerospike.err_write_fail_key_exists
(gauge)
[Legacy] The number of write transactions that failed because the key already exists. Deprecated since 3.9
aerospike.err_write_fail_key_mismatch
(gauge)
[Legacy] The number of failed requests due to key mismatch occurs when key is stored in Aerospike and key check is requested on the transaction. Deprecated since 3.9
aerospike.err_write_fail_not_found
(gauge)
[Legacy] The number of write transactions that failed due to the key not found. Deprecated since 3.9
aerospike.err_write_fail_noxdr
(gauge)
[Legacy] The number of writes rejected because XDR was not running. Deprecated since 3.8.1
aerospike.err_write_fail_parameter
(gauge)
[Legacy] The number of write transactions that failed because of a bad parameter from application code. Deprecated since 3.9
aerospike.err_write_fail_prole_delete
(gauge)
[Legacy] The number of replica delete failures because the replica record is not found. Deprecated since 3.9
aerospike.err_write_fail_prole_generation
(gauge)
[Legacy] The number of prole write failures because of generation mismatch. Deprecated since 3.9
aerospike.err_write_fail_prole_unknown
(gauge)
[Legacy] The number of prole write failures with unknown errors. Deprecated since 3.9
aerospike.err_write_fail_record_too_big
(gauge)
[Legacy] The number of write failures due to record being too big (bigger than write-block-size). Deprecated since 3.9
aerospike.err_write_fail_unknown
(gauge)
[Legacy] The number of write failures with unknown errors. Deprecated since 3.9
aerospike.fabric_bulk_recv_rate
(gauge)
[Legacy] The number of bytes received by the fabric bulk channel
Shown as byte
aerospike.fabric_bulk_send_rate
(gauge)
[Legacy] The number of bytes sent by the fabric bulk channel
Shown as byte
aerospike.fabric_connections
(gauge)
[Legacy] The number of active fabric connections to this node
aerospike.fabric_ctrl_recv_rate
(gauge)
[Legacy] The number of bytes received by the fabric control channel
Shown as byte
aerospike.fabric_ctrl_send_rate
(gauge)
[Legacy] The number of bytes sent by the fabric control channel
Shown as byte
aerospike.fabric_meta_recv_rate
(gauge)
[Legacy] The number of bytes received by the fabric meta channel
Shown as byte
aerospike.fabric_meta_send_rate
(gauge)
[Legacy] The number of bytes sent by the fabric meta channel
Shown as byte
aerospike.fabric_msgs_rcvd
(gauge)
[Legacy] The number of messages received via the fabric layer from other nodes. Deprecated since 3.11.1.1
aerospike.fabric_msgs_sent
(gauge)
[Legacy] The number of messages sent via the fabric layer to other nodes. Deprecated since 3.11.1.1
aerospike.fabric_rw_recv_rate
(gauge)
[Legacy] The number of bytes received by the fabric rw channel
Shown as byte
aerospike.fabric_rw_send_rate
(gauge)
[Legacy] The number of bytes sent by the fabric rw channel
Shown as byte
aerospike.failed_node_sessions_pending
(gauge)
[Legacy]
aerospike.free_dlog_pct
(gauge)
[Legacy] The percentage of the digest log free and available for use. Deprecated since 3.9
Shown as percent
aerospike.free_pct_disk
(gauge)
[Legacy] The percentage of disk capacity free for this namespace. Deprecated since 3.9.
Shown as percent
aerospike.free_pct_memory
(gauge)
[Legacy] The percentage of memory capacity free for this namespace. Deprecated since 3.9.
Shown as percent
aerospike.heap_active_kbytes
(gauge)
[Legacy] The amount of memory in in-use pages. An in-use page is a page that has some allocated memory (either partial or full).
Shown as kibibyte
aerospike.heap_allocated_kbytes
(gauge)
[Legacy] The amount of memory allocated by the asd daemon
Shown as kibibyte
aerospike.heap_efficiency_pct
(gauge)
[Legacy] The heapallocatedkbytes / heapmappedkbytes ratio. A lower number indicates a higher fragmentation rate.
Shown as percent
aerospike.heap_mapped_kbytes
(gauge)
[Legacy] The amount of memory in mapped pages (i.e. the amount of memory that JEM received from the Linux kernel). It should be a multiple of 4 as that would be the typical page size (4096 bytes).
Shown as kibibyte
aerospike.heap_site_count
(gauge)
[Legacy]
aerospike.heartbeat_connections
(gauge)
[Legacy] The number of active heartbeat connections to this node
aerospike.heartbeat_received_foreign
(gauge)
[Legacy] The total number of heartbeats received from remote nodes.
aerospike.heartbeat_received_self
(gauge)
[Legacy] The total number of multicast heartbeats from this node received by this node. Will be 0 for mesh.
aerospike.hotkeys_fetched
(gauge)
[Legacy] The number of record's digest that are actually shipped because their hotkey cache entries expired and were dirty. Should be interpreted in conjunction with noshiprecshotkey
aerospike.index_used_bytes_memory
(gauge)
[Legacy] The amount of memory occupied by the index. Deprecated since 3.9
Shown as byte
aerospike.info_complete
(gauge)
[Legacy] The number of info requests completed.
aerospike.info_queue
(gauge)
[Legacy] The number of info requests pending in info queue
aerospike.latency_avg_dlogread
(gauge)
[Legacy] The moving average latency to read from the digest log. Deprecated since 3.9
Shown as millisecond
aerospike.latency_avg_dlogwrite
(gauge)
[Legacy] The moving average latency to write to the digest log. Deprecated since 3.9
Shown as millisecond
aerospike.latency_avg_ship
(gauge)
[Legacy] The moving average latency to ship a record to remote Aerospike clusters. Deprecated since 3.9
Shown as millisecond
aerospike.linkdown_sessions_pending
(gauge)
[Legacy]
aerospike.local_recs_error
(gauge)
[Legacy] The number of failed records fetched from local Aerospike server. Deprecated since 3.9
aerospike.local_recs_fetch_avg_latency
(gauge)
[Legacy] The moving average latency to read a record/batch of records from local Aerospike server. Deprecated since 3.9
Shown as millisecond
aerospike.local_recs_fetched
(gauge)
[Legacy] The number of records fetched from local Aerospike server. Deprecated since 3.9
aerospike.local_recs_notfound
(gauge)
[Legacy] The number of record fetch attempts to the local Aerospike server that resulted in 'Not Found' response code. Deprecated since 3.9
aerospike.migrate_allowed
(gauge)
[Legacy]
aerospike.migrate_msgs_recv
(gauge)
[Legacy] The number of migrate messages received. Deprecated since 3.8.3
aerospike.migrate_msgs_sent
(gauge)
[Legacy] The number of migrate messages sent. Deprecated since 3.8.3
aerospike.migrate_num_incoming_accepted
(gauge)
[Legacy] The number of migrate requests accepted from other nodes Deprecated since 3.8.3.
aerospike.migrate_num_incoming_refused
(gauge)
[Legacy] The number of migrate requests refused from other nodes due to reaching 'migrate-max-num-incoming' limit. Deprecated since 3.8.3
aerospike.migrate_partitions_remaining
(gauge)
[Legacy] The number of partitions remaining to migrate in either direction.
aerospike.migrate_progress_recv
(gauge)
[Legacy] The number of partitions currently being received on this node. Deprecated since 3.9
aerospike.migrate_progress_send
(gauge)
[Legacy] The number of partitions currently being sent out from this node. Deprecated since 3.9
aerospike.migrate_rx_objs
(gauge)
[Legacy] The number of partitions currently migrating to this node. Deprecated since 3.9
aerospike.migrate_tx_objs
(gauge)
[Legacy] The number of partitions currently migrating from this node. Deprecated since 3.9
aerospike.namespace.allow_nonxdr_writes
(gauge)
[Legacy] A parameter to control the writes done by a non-XDR client.
aerospike.namespace.allow_xdr_writes
(gauge)
[Legacy] A parameter to control whether to accept write transactions originating from an XDR client.
aerospike.namespace.appeals_records_exonerated
(gauge)
[Legacy] The number of records that were marked replicated as result of an appeal. Partition appeals will happen for namespaces operating under the strong-consistency mode when a node needs to validate the records it has when joining the cluster.
Shown as record
aerospike.namespace.appeals_rx_active
(gauge)
[Legacy] The number of partition appeals currently being received. Partition appeals will happen for namespaces operating under the strong-consistency mode when a node needs to validate the records it has when joining the cluster.
aerospike.namespace.appeals_tx_active
(gauge)
[Legacy] The number of partition appeals not yet sent. Partition appeals will happen for namespaces operating under the strong-consistency mode when a node needs to validate the records it has when joining the cluster.
aerospike.namespace.appeals_tx_remaining
(gauge)
[Legacy] The number of partition appeals currently being sent.
aerospike.namespace.available_bin_names
(gauge)
[Legacy] The remaining number of unique bins that the user can create for this namespace.
aerospike.namespace.available_pct
(gauge)
[Legacy] The minimum contiguous disk space for all disks in a namespace. Deprecated since 3.9
Shown as percent
aerospike.namespace.background_scan_max_rps
(gauge)
[Legacy] The maximum records per second (rps) allowed for a background scan (i.e. UDF or ops scan).
aerospike.namespace.batch_sub_proxy_complete
(gauge)
[Legacy] The number of proxied batch-index sub transactions that completed.
aerospike.namespace.batch_sub_proxy_error
(gauge)
[Legacy] The number of proxied batch-index sub transactions that failed with an error.
aerospike.namespace.batch_sub_proxy_timeout
(gauge)
[Legacy] The number of proxied batch-index sub transactions that timed out.
aerospike.namespace.batch_sub_read_error
(gauge)
[Legacy] The number of batch-index read sub transaction that failed with an error.
aerospike.namespace.batch_sub_read_filtered_out
(gauge)
[Legacy] The number of batch-index read sub transactions that did not happen because the record was filtered out via a predicate expression
Shown as transaction
aerospike.namespace.batch_sub_read_not_found
(gauge)
[Legacy] The number of batch-index read sub transaction that resulted in not found.
aerospike.namespace.batch_sub_read_success
(gauge)
[Legacy] The number of successful batch-index read sub transactions.
aerospike.namespace.batch_sub_read_timeout
(gauge)
[Legacy] The number of batch-index read sub transactions that timed out.
aerospike.namespace.batch_sub_tsvc_error
(gauge)
[Legacy] The number of batch-index read sub transactions that failed with an error in the transaction service before attempting to handle the transaction.
aerospike.namespace.batch_sub_tsvc_timeout
(gauge)
[Legacy] The number of batch-index read sub transactions that timed out in the transaction service before attempting to handle the transaction.
aerospike.namespace.cache_read_pct
(gauge)
[Legacy] The percentage of read transactions that are hitting the post write queue and will save an io to the underlying storage device. Deprecated since 3.9
Shown as percent
aerospike.namespace.client_delete_error
(gauge)
[Legacy] The number of client delete transactions that failed with an error.
aerospike.namespace.client_delete_error.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client delete transactions that failed with an error.
aerospike.namespace.client_delete_filtered_out
(gauge)
[Legacy] The number of client delete transactions that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.client_delete_not_found
(gauge)
[Legacy] The number of client delete transactions that resulted in a not found.
aerospike.namespace.client_delete_success
(gauge)
[Legacy] The number of successful client delete transactions.
aerospike.namespace.client_delete_timeout
(gauge)
[Legacy] The number of client delete transactions that timed out.
aerospike.namespace.client_lang_delete_success
(gauge)
[Legacy] The number of client initiated udf transactions that successfully deleted a record.
aerospike.namespace.client_lang_error
(gauge)
[Legacy] The number of client initiated udf transactions that failed with an error.
aerospike.namespace.client_lang_read_success
(gauge)
[Legacy] The number of successful client initiated udf read transactions.
aerospike.namespace.client_lang_write_success
(gauge)
[Legacy] The number of successful client initiated udf write transactions.
aerospike.namespace.client_proxy_complete
(gauge)
[Legacy] The number of completed proxy transactions initiated by a client request.
aerospike.namespace.client_proxy_error
(gauge)
[Legacy] The number of proxy transactions initiated by a client request that failed with an error.
aerospike.namespace.client_proxy_timeout
(gauge)
[Legacy] The number of proxy transactions initiated by a client request that timed out.
aerospike.namespace.client_read_error
(gauge)
[Legacy] The number of client read transaction errors.
aerospike.namespace.client_read_error.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client read transaction errors.
aerospike.namespace.client_read_filtered_out
(gauge)
[Legacy] The number of client read transactions that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.client_read_filtered_out.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client read transaction filtered out.
aerospike.namespace.client_read_not_found
(gauge)
[Legacy] The number of client read transaction that resulted in not found.
aerospike.namespace.client_read_not_found.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client read transaction not found.
aerospike.namespace.client_read_success
(gauge)
[Legacy] The number of successful client read transactions.
aerospike.namespace.client_read_success.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client read transaction success.
aerospike.namespace.client_read_timeout
(gauge)
[Legacy] The number of client read transaction that timed out.
aerospike.namespace.client_read_timeout.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client read transaction timeout.
aerospike.namespace.client_tsvc_error
(gauge)
[Legacy] The number of client transactions that failed in the transaction service before attempting to handle the transaction.
aerospike.namespace.client_tsvc_timeout
(gauge)
[Legacy] The number of client transactions that timed out while in the transaction service before attempting to handle the transaction.
aerospike.namespace.client_udf_complete
(gauge)
[Legacy] The number of completed udf transactions initiated by the client.
aerospike.namespace.client_udf_error
(gauge)
[Legacy] The number of failed udf transactions initiated by the client.
aerospike.namespace.client_udf_error.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of failed udf transactions initiated by the client.
aerospike.namespace.client_udf_filtered_out
(gauge)
[Legacy] The number of client udf transactions that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.client_udf_timeout
(gauge)
[Legacy] The number of udf transactions initiated by the client that timed out.
aerospike.namespace.client_write_error
(gauge)
[Legacy] The number of client write transactions that failed with an error.
aerospike.namespace.client_write_error.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client write transactions that failed with an error.
aerospike.namespace.client_write_filtered_out
(gauge)
[Legacy] The number of client write transactions that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.client_write_filtered_out.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client write transactions that were filtered out.
aerospike.namespace.client_write_success
(gauge)
[Legacy] The number of successful client write transactions.
aerospike.namespace.client_write_success.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client write transactions that succeeded.
aerospike.namespace.client_write_timeout
(gauge)
[Legacy] The number of client write transactions that timed out.
aerospike.namespace.client_write_timeout.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of client write transactions that timed out.
aerospike.namespace.clock_skew_stop_writes
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v4.0+] This will be true if clock skew is outside of tolerance for strong-consistency.
aerospike.namespace.current_time
(gauge)
[Legacy] The current time represented as Aerospike epoch time.
aerospike.namespace.data_in_index
(gauge)
[Legacy] The optimization in single bin case, will only allow integer or float stored in index space.
aerospike.namespace.data_used_bytes_memory
(gauge)
[Legacy] The amount of memory occupied by data. Deprecated since 3.9
Shown as byte
aerospike.namespace.dead_partitions
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v4.0+] The number of dead partitions for this namespace (when using strong-consistency). This is the number of partitions that are unavailable when all roster nodes are present.
aerospike.namespace.default_ttl
(gauge)
[Legacy] Default time-to-live (in seconds) for a record from the time of creation or last update.
aerospike.namespace.deleted_last_bin
(gauge)
[Legacy] The number of objects deleted because their last bin was deleted.
Shown as object
aerospike.namespace.device_available_pct
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v3.9+] The minimum contiguous disk space for all disks in a namespace.
aerospike.namespace.device_compression_ratio
(gauge)
[Legacy] The average compressed size to uncompressed size ratio.
aerospike.namespace.device_free_pct
(gauge)
[Legacy] The percentage of disk capacity free for this namespace. This is the amount of free storage across all devices in the namespace.
Shown as percent
aerospike.namespace.device_total_bytes
(gauge)
[Legacy] The total bytes of disk space allocated to this namespace on this node.
Shown as byte
aerospike.namespace.device_used_bytes
(gauge)
[Legacy] The total bytes of disk space used by this namespace on this node.
Shown as byte
aerospike.namespace.disable_cold_start_eviction
(gauge)
[Legacy] If true, disables eviction that may occur at cold start for this namespace only.
aerospike.namespace.disable_write_dup_res
(gauge)
[Legacy] This disables write duplicate resolution for the namespace.
aerospike.namespace.disallow_null_setname
(gauge)
[Legacy] Enabling this configuration will error out a record write attempt if done without a set name.
aerospike.namespace.effective_is_quiesced
(gauge)
[Legacy] This reports true when the namespace has rebalanced after previously receiving a quiesce info request.
aerospike.namespace.effective_prefer_uniform_balance
(gauge)
[Legacy] If Aerospike applied the uniform balance algorithm for the current cluster state, the value returned will be true.
aerospike.namespace.effective_replication_factor
(gauge)
[Legacy] The effective replication factor for the namespace.
aerospike.namespace.enable_benchmarks_batch_sub
(gauge)
[Legacy] This enables histograms for batch sub transactions.
aerospike.namespace.enable_benchmarks_ops_sub
(gauge)
[Legacy] This enables histograms for ops sub transactions.
aerospike.namespace.enable_benchmarks_read
(gauge)
[Legacy] This enables histograms for read transactions.
aerospike.namespace.enable_benchmarks_storage
(gauge)
[Legacy] This enables histograms for storage access.
aerospike.namespace.enable_benchmarks_udf
(gauge)
[Legacy] This enables histograms for udf transactions.
aerospike.namespace.enable_benchmarks_udf_sub
(gauge)
[Legacy] This enables histograms for udf sub transactions.
aerospike.namespace.enable_benchmarks_write
(gauge)
[Legacy] This enables histograms for write transactions.
aerospike.namespace.enable_hist_proxy
(gauge)
[Legacy] This enables histograms for proxy transactions.
aerospike.namespace.enable_xdr
(gauge)
[Legacy] This controls, at the namespace level, whether digest log entries are being written to the digest log.
aerospike.namespace.evict_hist_buckets
(gauge)
[Legacy] The number of histogram buckets used for evictions.
aerospike.namespace.evict_tenths_pct
(gauge)
[Legacy] The maximum 1/10th percentage of objects to be deleted during each iteration of eviction.
aerospike.namespace.evict_ttl
(gauge)
[Legacy] The current eviction depth or the highest ttl of records that have been evicted.
aerospike.namespace.evict_void_time
(gauge)
[Legacy] The current eviction depth, expressed as a void time in seconds since 1 January 2010 UTC.
Shown as second
aerospike.namespace.evicted_objects
(gauge)
[Legacy] The number of objects evicted from this namespace on this node since the server started. Deprecated since 3.9
aerospike.namespace.expired_objects
(gauge)
[Legacy] The number of objects expired from this namespace on this node since the server started. Deprecated since 3.9
aerospike.namespace.fail_generation
(gauge)
[Legacy] The number of read/write transactions failed on generation check.
aerospike.namespace.fail_key_busy
(gauge)
[Legacy] The number of read/write transactions failed on 'hot keys'.
aerospike.namespace.fail_record_too_big
(gauge)
[Legacy] The number of read/write transactions failed due to record too big (above the write-block-size limit).
aerospike.namespace.fail_xdr_forbidden
(gauge)
[Legacy] The number of read/write transactions failed due to configuration restriction.
aerospike.namespace.free_pct_disk
(gauge)
[Legacy] The percentage of disk capacity free for this namespace. Deprecated since 3.9
Shown as percent
aerospike.namespace.free_pct_memory
(gauge)
[Legacy] The percentage of memory capacity free for this namespace. Deprecated since 3.9
Shown as percent
aerospike.namespace.from_proxy_batch_sub_read_error
(gauge)
[Legacy] The number of batch-index read sub-transactions proxied from another node that failed with an error.
Shown as transaction
aerospike.namespace.from_proxy_batch_sub_read_filtered_out
(gauge)
[Legacy] The number of batch-index read sub transactions proxied from another node that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.from_proxy_batch_sub_read_not_found
(gauge)
[Legacy] The number of batch-index read sub transactions proxied from another node that resulted in not found.
Shown as transaction
aerospike.namespace.from_proxy_batch_sub_read_success
(gauge)
[Legacy] The number of records successfully read by batch-index sub transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_batch_sub_read_timeout
(gauge)
[Legacy] The number of batch-index read sub transactions proxied from another node that timed out.
Shown as transaction
aerospike.namespace.from_proxy_batch_sub_tsvc_error
(gauge)
[Legacy] The number of batch-index read sub transactions proxied from another node that failed with an error in the transaction service, before attempting to handle the transaction.
Shown as transaction
aerospike.namespace.from_proxy_batch_sub_tsvc_timeout
(gauge)
[Legacy] The number of batch-index read sub transactions proxied from another node that timed out in the transaction service, before attempting to handle the transaction.
Shown as transaction
aerospike.namespace.from_proxy_delete_error
(gauge)
[Legacy] The number of errors for delete transactions proxied from another node. This includes xdrfromproxydeleteerror.
Shown as error
aerospike.namespace.from_proxy_delete_filtered_out
(gauge)
[Legacy] The number of delete transactions proxied from another node that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.from_proxy_delete_not_found
(gauge)
[Legacy] The number of delete transactions proxied from another node that resulted in not found. This includes xdrfromproxydeletenot_found.
Shown as transaction
aerospike.namespace.from_proxy_delete_success
(gauge)
[Legacy] The number of successful delete transactions proxied from another node. This includes xdrfromproxydeletesuccess.
Shown as transaction
aerospike.namespace.from_proxy_delete_timeout
(gauge)
[Legacy] The number of timeouts for delete transactions proxied from another node. This includes xdrfromproxydeletetimeout.
Shown as transaction
aerospike.namespace.from_proxy_lang_delete_success
(gauge)
[Legacy] The number of successful udf delete transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_lang_error
(gauge)
[Legacy] The number of language (Lua) errors for udf transactions proxied from another node.
Shown as error
aerospike.namespace.from_proxy_lang_read_success
(gauge)
[Legacy] The number of successful udf read transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_lang_write_success
(gauge)
[Legacy] The number of successful udf write transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_read_error
(gauge)
[Legacy] The number of errors for read transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_read_filtered_out
(gauge)
[Legacy] The number of read transactions proxied from another node that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.from_proxy_read_not_found
(gauge)
[Legacy] The number of read transactions proxied from another node that resulted in not found.
Shown as transaction
aerospike.namespace.from_proxy_read_success
(gauge)
[Legacy] The number of successful read transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_read_timeout
(gauge)
[Legacy] The number of timeouts for read transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_tsvc_error
(gauge)
[Legacy] The number of transactions proxied from another node that failed in the transaction service, before attempting to handle the transaction.
Shown as transaction
aerospike.namespace.from_proxy_tsvc_timeout
(gauge)
[Legacy] The number of transactions proxied from another node that timed out while in the transaction service, before attempting to handle the transaction.
Shown as transaction
aerospike.namespace.from_proxy_udf_complete
(gauge)
[Legacy] The number of successful udf transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_udf_error
(gauge)
[Legacy] The number of errors for udf transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_udf_filtered_out
(gauge)
[Legacy] The number of udf transactions proxied from another node that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.from_proxy_udf_timeout
(gauge)
[Legacy] The number of timeouts for udf transactions proxied from another node.
Shown as transaction
aerospike.namespace.from_proxy_write_error
(gauge)
[Legacy] The number of errors for write transactions proxied from another node. This includes xdrfromproxywriteerror.
Shown as transaction
aerospike.namespace.from_proxy_write_filtered_out
(gauge)
[Legacy] The number of write transactions proxied from another node that did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.from_proxy_write_success
(gauge)
[Legacy] The number of successful write transactions proxied from another node. This includes xdrfromproxywritesuccess.
Shown as transaction
aerospike.namespace.from_proxy_write_timeout
(gauge)
[Legacy] The number of timeouts for write transactions proxied from another node. This includes xdrfromproxywritetimeout.
Shown as transaction
aerospike.namespace.geo2dsphere_within.earth_radius_meters
(gauge)
[Legacy] Earth's radius in meters, since the workspace here is the complete earth.
aerospike.namespace.geo2dsphere_within.level_mod
(gauge)
[Legacy] This determines if only cells where (level - min-level) is a multiple of level-mod will be used (default 1).
aerospike.namespace.geo2dsphere_within.max_cells
(gauge)
[Legacy] The maximum desired number of cells in the approximation. The maximum number of cells allowed is 256.
aerospike.namespace.geo2dsphere_within.max_level
(gauge)
[Legacy] The maximum depth to go for a single cell
aerospike.namespace.geo2dsphere_within.min_level
(gauge)
[Legacy] The minimum depth to go for a single cell
aerospike.namespace.geo2dsphere_within.strict
(gauge)
[Legacy] An additional sanity check from Aerospike to validate whether the points returned by S2 falls under the user's query region. When set to false, Aerospike does not do this additional check and send the results as it is.
aerospike.namespace.geo_region_query_cells
(gauge)
[Legacy]
aerospike.namespace.geo_region_query_falsepos
(gauge)
[Legacy]
aerospike.namespace.geo_region_query_points
(gauge)
[Legacy]
aerospike.namespace.geo_region_query_reqs
(gauge)
[Legacy]
aerospike.namespace.high_water_disk_pct
(gauge)
[Legacy] Data will be evicted if the disk utilization is greater than this specified percentage.
aerospike.namespace.high_water_memory_pct
(gauge)
[Legacy] Data will be evicted if the memory utilization is greater than this specified percentage.
aerospike.namespace.hwm_breached
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v3.9+] If true Aerospike has breached 'high-water-[disk/memory]-pct' for this namespace. Deprecated since 3.9
aerospike.namespace.index_flash_alloc_pct
(gauge)
[OpenMetricsV2 and Aerospike v5.6+] Applies only to Enterprise Edition configured with index-type flash. Percentage of the mount(s) allocated for the primary index used by this namespace on this node.
aerospike.namespace.index_flash_used_bytes
(gauge)
[Legacy] The total bytes in-use on the mount(s) for the primary index used by this namespace on this node. Applies only to Enterprise Version configured with index-type flash.
Shown as byte
aerospike.namespace.index_flash_used_pct
(gauge)
[Legacy] The percentage of the mount(s) in-use for the primary index used by this namespace on this node. Applies only to Enterprise Version configured with index-type flash.
aerospike.namespace.index_pmem_used_bytes
(gauge)
[Legacy] The total bytes in-use on the mount(s) for the primary index used by this namespace on this node. Applies only to Enterprise Version configured with index-type pmem.
Shown as byte
aerospike.namespace.index_pmem_used_pct
(gauge)
[Legacy] The percentage of the mount(s) in-use for the primary index used by this namespace on this node. Applies only to Enterprise Version configured with index-type pmem.
aerospike.namespace.index_stage_size
(gauge)
[Legacy] The configuration used to size the primary index arena(s).
aerospike.namespace.index_used_bytes_memory
(gauge)
[Legacy] The amount of memory occupied by the index for this namespace. Deprecated since 3.9
Shown as byte
aerospike.namespace.latency.batch_index
(gauge)
[Legacy] The batch latency tagged by bucket (1 to 2^16).
Shown as transaction
aerospike.namespace.latency.batch_index_ops_sec
(gauge)
[Legacy] The batch read operations per sec.
Shown as transaction
aerospike.namespace.latency.batch_index_over_1ms
(gauge)
[Legacy] The batch read latency over 1ms.
Shown as transaction
aerospike.namespace.latency.batch_index_over_64ms
(gauge)
[Legacy] The batch read latency over 64ms.
Shown as transaction
aerospike.namespace.latency.batch_index_over_8ms
(gauge)
[Legacy] The batch read latency over 8ms.
Shown as transaction
aerospike.namespace.latency.read
(gauge)
[Legacy] The read latency tagged by bucket (1 to 2^16).
Shown as transaction
aerospike.namespace.latency.read_ops_sec
(gauge)
[Legacy] The read operations per sec.
Shown as transaction
aerospike.namespace.latency.read_over_1ms
(gauge)
[Legacy] The read latency over 1ms.
Shown as transaction
aerospike.namespace.latency.read_over_64ms
(gauge)
[Legacy] The read latency over 64ms.
Shown as transaction
aerospike.namespace.latency.read_over_8ms
(gauge)
[Legacy] The read latency over 8ms.
Shown as transaction
aerospike.namespace.latency.udf
(gauge)
[Legacy] The udf latency tagged by bucket (1 to 2^16).
Shown as transaction
aerospike.namespace.latency.write
(gauge)
[Legacy] The write latency tagged by bucket (1 to 2^16).
Shown as transaction
aerospike.namespace.latency.write_ops_sec
(gauge)
[Legacy] The write operations per sec.
Shown as transaction
aerospike.namespace.latency.write_over_1ms
(gauge)
[Legacy] The write latency over 1ms.
Shown as transaction
aerospike.namespace.latency.write_over_64ms
(gauge)
[Legacy] The write latency over 64ms.
Shown as transaction
aerospike.namespace.latency.write_over_8ms
(gauge)
[Legacy] The write latency over 8ms.
Shown as transaction
aerospike.namespace.ldc_gc_rate
(gauge)
[Legacy]
aerospike.namespace.ldt_delete_success
(gauge)
[Legacy] The number of successful LDT delete operations.
aerospike.namespace.ldt_deletes
(gauge)
[Legacy] The number of LDT delete operations.
aerospike.namespace.ldt_errors
(gauge)
[Legacy] The number of LDT errors.
aerospike.namespace.ldt_read_success
(gauge)
[Legacy] The number of successful LDT read operations.
aerospike.namespace.ldt_reads
(gauge)
[Legacy] The number of LDT read operations.
aerospike.namespace.ldt_updates
(gauge)
[Legacy] The number of LDT update operations.
aerospike.namespace.ldt_write_success
(gauge)
[Legacy] The number of successful LDT write operations
aerospike.namespace.ldt_writes
(gauge)
[Legacy] The number of LDT write operations.
aerospike.namespace.master_objects
(gauge)
[Legacy] The number of records on this node which are active masters.
aerospike.namespace.master_sub_objects
(gauge)
[Legacy] The number of LDT sub-records on this node which are active masters.
aerospike.namespace.master_tombstones
(gauge)
[Legacy] The number of tombstones on this node which are active masters.
aerospike.namespace.max_evicted_ttl
(gauge)
[Legacy] The highest record TTL that Aerospike has evicted from this namespace.
aerospike.namespace.max_void_time
(gauge)
[Legacy] The maximum record TTL ever inserted into this namespace
aerospike.namespace.memory_free_pct
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v3.9+]The percentage of memory capacity free for this namespace.
Shown as percent
aerospike.namespace.memory_size
(gauge)
[Legacy] The maximum amount of memory for the namespace.
aerospike.namespace.memory_used_bytes
(gauge)
[Legacy and OpenMetrics V2 and Aerospike v3.9+] The total bytes of memory used by this namespace on this node.
Shown as byte
aerospike.namespace.memory_used_data_bytes
(gauge)
[Legacy] The amount of memory occupied by data.
Shown as byte
aerospike.namespace.memory_used_index_bytes
(gauge)
[Legacy] The amount of memory occupied by the index for this namespace.
Shown as byte
aerospike.namespace.memory_used_sindex_bytes
(gauge)
[Legacy] The amount of memory occupied by secondary indexes for this namespace on this node.
Shown as byte
aerospike.namespace.migrate_order
(gauge)
[Legacy] The number between 1 and 10 which determines the order namespaces are to be processed when migrating.
aerospike.namespace.migrate_record_receives
(gauge)
[Legacy] The number of record insert request received by immigration. Deprecated since 3.9
aerospike.namespace.migrate_record_retransmits
(gauge)
[Legacy] The number of times emigration has retransmitted records. Deprecated since 3.9
aerospike.namespace.migrate_records_skipped
(gauge)
[Legacy] The number of times emigration did not ship a record because the remote node was already up-to-date. Deprecated since 3.9
aerospike.namespace.migrate_records_transmitted
(gauge)
[Legacy] The number of records emigration has read and sent. Deprecated since 3.9
aerospike.namespace.migrate_retransmit_ms
(gauge)
[Legacy] How long to wait for success, in milliseconds, before retrying a migration related transaction.
Shown as millisecond
aerospike.namespace.migrate_rx_instance_count
(gauge)
[Legacy] The number of instance objects managing immigrations
aerospike.namespace.migrate_rx_instances
(gauge)
[Legacy] The number of instance objects managing immigrations.
aerospike.namespace.migrate_rx_partitions_active
(gauge)
[Legacy] The number of partitions currently immigrating to this node.
aerospike.namespace.migrate_rx_partitions_initial
(gauge)
[Legacy] The total number of migrations this node will receive during the current migration cycle for this namespace.
aerospike.namespace.migrate_rx_partitions_remaining
(gauge)
[Legacy] The number of migrations this node has not yet received during the current migration cycle for this namespace.
aerospike.namespace.migrate_signals_active
(gauge)
[Legacy] For finished partition migrations on this node, the number of outstanding clean-up signals, sent to participating member nodes, waiting for clean-up acknowledgment.
aerospike.namespace.migrate_signals_remaining
(gauge)
[Legacy] For unfinished partition migrations on this node, the number of clean-up signals to send to participating member nodes, as migration completes
aerospike.namespace.migrate_sleep
(gauge)
[Legacy] The number of microseconds to sleep after each record migration.
Shown as microsecond
aerospike.namespace.migrate_tx_instance_count
(gauge)
[Legacy] The number of instance objects managing emigrations.
aerospike.namespace.migrate_tx_instances
(gauge)
[Legacy] The number of instance objects managing emigrations.
aerospike.namespace.migrate_tx_partitions_active
(gauge)
[Legacy] The number of partitions currently emigrating from this node.
aerospike.namespace.migrate_tx_partitions_imbalance
(gauge)
[Legacy] The number of partition migrations failures which could lead to partitions being imbalanced.
aerospike.namespace.migrate_tx_partitions_initial
(gauge)
[Legacy] The total number of migrations this node will send during the current migration cycle for this namespace.
aerospike.namespace.migrate_tx_partitions_lead_remaining
(gauge)
[Legacy] The number of initially scheduled emigrations which are not delayed by the migrate-fill-delay configuration.
aerospike.namespace.migrate_tx_partitions_remaining
(gauge)
[Legacy] The number of migrations this node not yet sent during the current migration cycle for this namespace.
aerospike.namespace.nodes_quiesced
(gauge)
[Legacy] The number of nodes observed to be quiesced as of the most recent reclustering event.
Shown as node
aerospike.namespace.non_expirable_objects
(gauge)
[Legacy] The number of records in this namespace with non-expirable TTLs (TTLs of value 0).
aerospike.namespace.non_replica_objects
(gauge)
[Legacy] The number of records on this node which are neither master nor replicas
Shown as record
aerospike.namespace.non_replica_tombstones
(gauge)
[Legacy] The number of tombstones on this node which are neither master nor replicas. This number is non-zero only during migration.
aerospike.namespace.ns_cluster_size
(gauge)
[Legacy] The namespace cluster size
aerospike.namespace.ns_forward_xdr_writes
(gauge)
[Legacy] This parameter provides fine grained control at namespace level to forward writes that originated from another XDR to the specified destination datacenters (in xdr section).
aerospike.namespace.nsup_cycle_duration
(gauge)
[Legacy] The length of the last nsup cycle.
Shown as millisecond
aerospike.namespace.nsup_cycle_sleep_pct
(gauge)
[Legacy] The percent time spent sleeping in the last nsup cycle. Deprecated since 3.9
Shown as percent
aerospike.namespace.nsup_hist_period
(gauge)
[Legacy] The interval (secs) at which the object size histograms, as well as the time-to-live (ttl) histogram, are updated.
aerospike.namespace.nsup_period
(gauge)
[Legacy] The interval at which the main expiration/eviction thread (called nsup, the namespace supervisor) wakes up to process the namespace.
aerospike.namespace.nsup_threads
(gauge)
[Legacy] The number of dedicated expiration/eviction threads for nsup to use when processing the namespace.
Shown as thread
aerospike.namespace.obj_size_hist_max
(gauge)
[Legacy]
aerospike.namespace.objects
(gauge)
[Legacy] The number of records in this namespace for this node. Does not include tombstones.
Shown as record
aerospike.namespace.ops_sub_tsvc_error
(gauge)
[Legacy] The number of ops scan/query sub-transactions that failed with an error in the transaction service.
Shown as transaction
aerospike.namespace.ops_sub_tsvc_timeout
(gauge)
[Legacy] The number of ops scan/query sub-transactions that timed out in the transaction service.
Shown as transaction
aerospike.namespace.ops_sub_write_error
(gauge)
[Legacy] The number of ops scan/query write sub-transactions that failed with an error. Does not include timeouts.
Shown as transaction
aerospike.namespace.ops_sub_write_filtered_out
(gauge)
[Legacy] The number of ops scan/query write sub-transactions for which the write did not happen because the record was filtered out via a predicate expression.
Shown as transaction
aerospike.namespace.ops_sub_write_success
(gauge)
[Legacy] The number of successful ops scan/query write sub-transactions.
Shown as transaction
aerospike.namespace.ops_sub_write_timeout
(gauge)
[Legacy] The number of ops scan/query write sub-transactions that timed out.
Shown as transaction
aerospike.namespace.partition_tree_sprigs
(gauge)
[Legacy] The number of tree sprigs per partition to use.
aerospike.namespace.pending_quiesce
(gauge)
[Legacy] This reports 'true' when the quiesce info command has been received by a node.
aerospike.namespace.pmem_available_pct
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v4.8+] The minimum contiguous pmem storage file space across all such files in a namespace.
Shown as percent
aerospike.namespace.pmem_compression_ratio
(gauge)
[Legacy] The average compressed size to uncompressed size ratio for pmem storage
aerospike.namespace.pmem_free_pct
(gauge)
[Legacy] The percentage of pmem storage capacity free for this namespace.
Shown as percent
aerospike.namespace.pmem_total_bytes
(gauge)
[Legacy] The total bytes of pmem storage file space allocated to this namespace on this node.
Shown as byte
aerospike.namespace.pmem_used_bytes
(gauge)
[Legacy] The total bytes of pmem storage file space used by this namespace on this node.
Shown as byte
aerospike.namespace.prefer_uniform_balance
(gauge)
[Legacy] If true, this namespace will make an effort to distribute partitions evenly to all nodes.
aerospike.namespace.prole_objects
(gauge)
[Legacy] The number of records on this node which are proles (replicas) on this node. Does not include tombstones.
Shown as record
aerospike.namespace.prole_sub_objects
(gauge)
[Legacy] The number of LDT sub records on this node which are proles (replicas) on this node.
Shown as record
aerospike.namespace.prole_tombstones
(gauge)
[Legacy] The number of tombstones on this node which are proles (replicas) on this node.
aerospike.namespace.query_abort
(gauge)
[Legacy] The number of user aborted queries seen by this node. Deprecated since 3.9
aerospike.namespace.query_agg
(gauge)
[Legacy] The number of aggregations run on this node seen by this node.
aerospike.namespace.query_agg_abort
(gauge)
[Legacy] The number of query aggregations aborted by the user seen by this node.
aerospike.namespace.query_agg_avg_rec_count
(gauge)
[Legacy] The average number of records returned by the aggregations underlying query.
aerospike.namespace.query_agg_error
(gauge)
[Legacy] The number of query aggregations errors due to an internal error.
aerospike.namespace.query_agg_success
(gauge)
[Legacy] The number of query aggregations completed on this node.
aerospike.namespace.query_avg_rec_count
(gauge)
[Legacy] The average number of records returned by the all queries against this secondary index (combinesqueryaggavgreccount and querylookupavgreccount).
aerospike.namespace.query_fail
(gauge)
[Legacy] The number of queries which failed due to an internal error. Those are failures not part of query lookup (see querylookuperror) query aggregation (see queryaggerror) or query background udf (see queryudfbg_failure).
aerospike.namespace.query_long_queue_full
(gauge)
[Legacy] The number of long running queries queue full errors.
aerospike.namespace.query_long_reqs
(gauge)
[Legacy] The number of long running queries currently in process.
aerospike.namespace.query_lookup_abort
(gauge)
[Legacy] The number of user aborted secondary index queries.
aerospike.namespace.query_lookup_avg_rec_count
(gauge)
[Legacy] The average number of records returned by all secondary index query look-ups.
aerospike.namespace.query_lookup_err
(gauge)
[Legacy] The number of secondary index query look-up errors.
aerospike.namespace.query_lookup_error
(gauge)
[Legacy] The number of secondary index query look-up errors.
aerospike.namespace.query_lookup_success
(gauge)
[Legacy] The number of secondary index look-ups which succeeded.
aerospike.namespace.query_lookups
(gauge)
[Legacy] The number of secondary index lookups attempted on this node.
aerospike.namespace.query_ops_bg_failure
(gauge)
[Legacy] The number of ops background queries that failed on this node.
Shown as query
aerospike.namespace.query_ops_bg_success
(gauge)
[Legacy] The number of ops background queries that completed on this node.
Shown as query
aerospike.namespace.query_proto_compression_ratio
(gauge)
[Legacy] The average compressed size to uncompressed size ratio for protocol message data in query responses to the client.
aerospike.namespace.query_proto_uncompressed_pct
(gauge)
[Legacy] The percentage of query responses to the client with uncompressed protocol message data.
Shown as percent
aerospike.namespace.query_reqs
(gauge)
[Legacy] The number of query requests ever attempted on this node. Combines queryagg and querylookups. Even very early failures would be counted here as opposed to queryshortrunning and querylongrunning which would increment a bit later.
aerospike.namespace.query_short_queue_full
(gauge)
[Legacy] The number of short running queries queue full errors.
aerospike.namespace.query_short_reqs
(gauge)
[Legacy] The number of short running queries currently in process.
aerospike.namespace.query_udf_bg_failure
(gauge)
[Legacy] The number of udf background queries that failed on this node.
aerospike.namespace.query_udf_bg_success
(gauge)
[Legacy] The number of udf background queries that completed on this node.
aerospike.namespace.rack_id
(gauge)
[Legacy] If this namespace should be rack-aware, which rack should this node be a part of.
Shown as microsecond
aerospike.namespace.re_repl_error
(gauge)
[Legacy] The number of re-replication errors which were not timeout.
Shown as error
aerospike.namespace.re_repl_success
(gauge)
[Legacy] The number of successful re-replications.
aerospike.namespace.re_repl_timeout
(gauge)
[Legacy] The number of re-replications that ended in timeout
aerospike.namespace.read_consistency_level_override
(gauge)
[Legacy] When set to a non-default value, overrides the client-specified per-transaction read consistency level for this namespace.
aerospike.namespace.record_proto_compression_ratio
(gauge)
[Legacy] The average compressed size to uncompressed size ratio for protocol message data in single-record transaction client responses.
aerospike.namespace.record_proto_uncompressed_pct
(gauge)
[Legacy] The percentage of single-record transaction client responses with uncompressed protocol message data.
Shown as percent
aerospike.namespace.repl_factor
(gauge)
[Legacy] The effective replication factor for the namespace
aerospike.namespace.replication_factor
(gauge)
[Legacy] The number of copies of a record (including the master copy) maintained in the entire cluster.
aerospike.namespace.retransmit_all_batch_sub_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during batch sub transactions that were being duplicate resolved.
aerospike.namespace.retransmit_all_delete_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during delete transactions that were being duplicate resolved.
aerospike.namespace.retransmit_all_delete_repl_write
(gauge)
[Legacy] The number of retransmits that occurred during delete transactions that were being replica written.
aerospike.namespace.retransmit_all_read_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during read transactions that were being duplicate resolved
aerospike.namespace.retransmit_all_udf_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during client initiated udf transactions that were being duplicate resolved.
aerospike.namespace.retransmit_all_udf_repl_write
(gauge)
[Legacy] The number of retransmits that occurred during client initiated udf transactions that were being replica written.
aerospike.namespace.retransmit_all_write_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during write transactions that were being duplicate resolved.
aerospike.namespace.retransmit_all_write_repl_write
(gauge)
[Legacy] The number of retransmits that occurred during write transactions that were being replica written.
aerospike.namespace.retransmit_nsup_repl_write
(gauge)
[Legacy] The number of retransmits that occurred during nsup initiated delete transactions that were being replica written.
aerospike.namespace.retransmit_ops_sub_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during write sub-transactions of ops scan/query jobs that were being duplicate resolved.
aerospike.namespace.retransmit_ops_sub_repl_write
(gauge)
[Legacy] The number of retransmits that occurred during write sub-transactions of ops scan/query jobs that were being replica written.
aerospike.namespace.retransmit_udf_sub_dup_res
(gauge)
[Legacy] The number of retransmits that occurred during udf sub transactions of scan/query background udf jobs that were being duplicate resolved.
aerospike.namespace.retransmit_udf_sub_repl_write
(gauge)
[Legacy] The number of retransmits that occurred during udf sub transactions of scan/query background udf jobs that were being replica written.
aerospike.namespace.scan_aggr_abort
(gauge)
[Legacy] The number of scan aggregations that were aborted.
aerospike.namespace.scan_aggr_complete
(gauge)
[Legacy] The number of aggregation scans that completed successfully
aerospike.namespace.scan_aggr_error
(gauge)
[Legacy] The number of scans aborted.
aerospike.namespace.scan_aggr_error.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] The number of scans aborted.
aerospike.namespace.scan_basic_abort
(gauge)
[Legacy] The number of basic scans that were aborted.
aerospike.namespace.scan_basic_complete
(gauge)
[Legacy] The number of basic scans that completed.
aerospike.namespace.scan_basic_error
(gauge)
[Legacy] The number of basic scans that failed.
aerospike.namespace.scan_basic_error.count
(count)
[OpenMetricsV2 and Aerospike 3.9] The number of basic scans that failed.
aerospike.namespace.scan_ops_bg_abort
(gauge)
[Legacy] The number of ops background scans that were aborted.
aerospike.namespace.scan_ops_bg_complete
(gauge)
[Legacy] The number of ops background scans that completed.
Shown as scan
aerospike.namespace.scan_ops_bg_error
(gauge)
[Legacy] The number of ops background scans that failed.
Shown as scan
aerospike.namespace.scan_ops_bg_error.count
(count)
[OpenMetricsV2 and Aerospike v4.7] The number of ops background scans that failed.
Shown as scan
aerospike.namespace.scan_proto_compression_ratio
(gauge)
[Legacy] The average compressed size to uncompressed size ratio for protocol message data in basic scan or aggregation scan client responses
aerospike.namespace.scan_proto_uncompressed_pct
(gauge)
[Legacy] The percentage of basic scan or aggregation scan client responses with uncompressed protocol message data.
Shown as percent
aerospike.namespace.scan_udf_bg_abort
(gauge)
[Legacy] The number of scan background udf that were aborted.
aerospike.namespace.scan_udf_bg_complete
(gauge)
[Legacy] The number of scan background udf that completed.
aerospike.namespace.scan_udf_bg_error
(gauge)
[Legacy] The number of scan background udf that failed.
aerospike.namespace.scan_udf_bg_error.count
(count)
[OpenMetricsV2 and Aerospike 3.9+] The number of scan background udf that failed.
aerospike.namespace.set_deleted_objects
(gauge)
[Legacy] The number of records deleted by a set. Deprecated since 3.9
aerospike.namespace.set_evicted_objects
(gauge)
[Legacy] The number of objects evicted by a set. Deprecated since 3.9
aerospike.namespace.sets_enable_xdr
(gauge)
[Legacy] When set to true, specifies whether XDR should ship all sets in a namespace or not.
aerospike.namespace.sindex.num_partitions
(gauge)
[Legacy]
aerospike.namespace.sindex_used_bytes_memory
(gauge)
[Legacy] The amount of memory occupied by secondary indexes for this namespace on this node. Deprecated since 3.9
Shown as byte
aerospike.namespace.single_bin
(gauge)
[Legacy] When set to true, it will disallow multiple bin (columns) for a record.
aerospike.namespace.single_scan_threads
(gauge)
[Legacy] The maximum number of threads allowed for a single scan. Value range: 1-128.
Shown as thread
aerospike.namespace.smd_evict_void_time
(gauge)
[Legacy] The cluster-wide specified eviction depth, expressed as a void time in seconds since 1 January 2010 UTC.
Shown as second
aerospike.namespace.stop_writes
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v3.9+] If true this namespace is currently not allowing writes.
aerospike.namespace.stop_writes_pct
(gauge)
[Legacy] When set to true, disallows writes when memory utilization (tracked under memoryusedbytes) is above this specified percentage
aerospike.namespace.storage_engine_device_defrag_q
(gauge)
[OpenMetricsV2 and Aerospike 4.3+] storage engine device defrag q
aerospike.namespace.storage_engine_device_write_q
(gauge)
[OpenMetricsV2 and Aerospike 4.3+] storage engine device write q
aerospike.namespace.storage_engine_file_defrag_q
(gauge)
[OpenMetricsV2 and Aerospike 4.3+] storage engine file defrag q
aerospike.namespace.storage_engine_file_write_q
(gauge)
[OpenMetricsV2 and Aerospike 4.3+] storage engine file write q
aerospike.namespace.strong_consistency
(gauge)
[Legacy] When set to true, allows linearized reads to be enabled.
aerospike.namespace.strong_consistency_allow_expunge
(gauge)
[Legacy] When set to true, allows non-durable deletes to be used with strong-consistency.
aerospike.namespace.sub_objects
(gauge)
[Legacy]
aerospike.namespace.tomb_raider_eligible_age
(gauge)
[Legacy] The number of seconds to retain a tombstone, even though it's discovered to be safe to remove.
Shown as second
aerospike.namespace.tomb_raider_period
(gauge)
[Legacy] The minimum amount of time, in seconds, between tomb-raider runs.
Shown as second
aerospike.namespace.tomb_raider_sleep
(gauge)
[Legacy] The number of microseconds to sleep in between large block reads on disk or pmem storage files.
Shown as microsecond
aerospike.namespace.tombstones
(gauge)
[Legacy] The total number tombstones in this namespace on this node.
aerospike.namespace.total_bytes_disk
(gauge)
[Legacy] The total bytes of disk space allocated to this namespace on this node. Deprecated since 3.9
Shown as byte
aerospike.namespace.total_bytes_memory
(gauge)
[Legacy] The total bytes of memory allocated to this namespace on this node. Deprecated since 3.9
Shown as byte
aerospike.namespace.tps.read
(gauge)
[Legacy] The throughput performance of reads. [Removed in 5.1.0]
aerospike.namespace.tps.write
(gauge)
[Legacy] The throughput performance of writes. [Removed in 5.1.0]
aerospike.namespace.transaction_pending_limit
(gauge)
[Legacy] The maximum pending transactions that can be queued up to work on the same key.
Shown as transaction
aerospike.namespace.truncate_lut
(gauge)
[Legacy] The 'most covering' truncate_lut for this namespace.
aerospike.namespace.truncate_threads
(gauge)
[Legacy] The number of dedicated threads to use for truncations in the namespace.
Shown as thread
aerospike.namespace.truncated_records
(gauge)
[Legacy] The total number of records deleted by truncation for this namespace (includes set truncations).
Shown as record
aerospike.namespace.udf_sub_lang_delete_success
(gauge)
[Legacy] The number of successful udf delete sub-transactions (for scan/query background udf jobs).
aerospike.namespace.udf_sub_lang_error
(gauge)
[Legacy] The number of udf sub-transactions errors (for scan/query background udf jobs).
aerospike.namespace.udf_sub_lang_read_success
(gauge)
[Legacy] The number of successful udf read sub-transactions (for scan/query background udf jobs).
aerospike.namespace.udf_sub_lang_write_success
(gauge)
[Legacy] The number of successful udf write sub-transactions (for scan/query background udf jobs).
aerospike.namespace.udf_sub_tsvc_error
(gauge)
[Legacy] The number of udf sub transactions that failed with an error in the transaction service before attempting to handle the transaction (for scan/query background udf jobs).
aerospike.namespace.udf_sub_tsvc_timeout
(gauge)
[Legacy] The number of udf sub transactions that timed out in the transaction service before attempting to handle the transaction (for scan/query background udf jobs).
aerospike.namespace.udf_sub_udf_complete
(gauge)
[Legacy] The number of completed udf sub-transactions (for scan/query background udf jobs).
aerospike.namespace.udf_sub_udf_error
(gauge)
[Legacy] The number of failed udf sub-transactions (for scan/query background udf jobs).
aerospike.namespace.udf_sub_udf_filtered_out
(gauge)
[Legacy] The number of udf sub-transactions that did not happen because the record was filtered out via a predicate expression.
aerospike.namespace.udf_sub_udf_timeout
(gauge)
[Legacy] The number of udf sub-transactions that timed out (for scan/query background udf jobs).
aerospike.namespace.unavailable_partitions
(gauge)
[Legacy and OpenMetricsV2 and Aerospike v4.0+] The number of unavailable partitions for this namespace (when using strong-consistency).
aerospike.namespace.used_bytes_disk
(gauge)
[Legacy] The total bytes of disk space used by this namespace on this node. Deprecated since 3.9
Shown as byte
aerospike.namespace.used_bytes_memory
(gauge)
[Legacy] The total bytes of memory used by this namespace on this node. Deprecated since 3.9
Shown as byte
aerospike.namespace.write_commit_level_override
(gauge)
[Legacy] When set to a non-default value, overrides the client-specified per-transaction write commit level for this namespace.
Shown as microsecond
aerospike.namespace.xdr_client_delete_error
(gauge)
[Legacy] The number of delete requests initiated by XDR that failed on the namespace on this node.
Shown as request
aerospike.namespace.xdr_client_delete_not_found
(gauge)
[Legacy] The number of delete requests initiated by XDR that failed on the namespace on this node due to the record not being found.
Shown as request
aerospike.namespace.xdr_client_delete_success
(gauge)
[Legacy] The number of delete requests initiated by XDR that succeeded on the namespace on this node.
Shown as request
aerospike.namespace.xdr_client_delete_timeout
(gauge)
[Legacy] The number of delete requests initiated by XDR that timed out on the namespace on this node.
Shown as request
aerospike.namespace.xdr_client_write_error
(gauge)
[Legacy] The number of write requests initiated by XDR that failed on the namespace on this node.
Shown as request
aerospike.namespace.xdr_client_write_success
(gauge)
[Legacy] The number of write requests initiated by XDR that succeeded on the namespace on this node.
Shown as request
aerospike.namespace.xdr_client_write_timeout
(gauge)
[Legacy] The number of write requests initiated by XDR that timed out on the namespace on this node.
Shown as request
aerospike.namespace.xdr_from_proxy_delete_error
(gauge)
[Legacy] The number of errors for XDR delete transactions proxied from another node.
Shown as error
aerospike.namespace.xdr_from_proxy_delete_not_found
(gauge)
[Legacy] The number of XDR delete transactions proxied from another node that resulted in not found.
Shown as transaction
aerospike.namespace.xdr_from_proxy_delete_success
(gauge)
[Legacy] The number of successful XDR delete transactions proxied from another node.
Shown as transaction
aerospike.namespace.xdr_from_proxy_delete_timeout
(gauge)
[Legacy] The number of timeouts for XDR delete transactions proxied from another node.
Shown as transaction
aerospike.namespace.xdr_from_proxy_write_error
(gauge)
[Legacy] The number of errors for XDR write transactions proxied from another node.
Shown as transaction
aerospike.namespace.xdr_from_proxy_write_success
(gauge)
[Legacy] The number of successful XDR write transactions proxied from another node.
Shown as transaction
aerospike.namespace.xdr_from_proxy_write_timeout
(gauge)
[Legacy] The number of timeouts for XDR write transactions proxied from another node.
Shown as transaction
aerospike.namespace.xdr_read_success
(gauge)
[Legacy] The number of read requests initiated by XDR that succeeded on the namespace on this node.
Shown as request
aerospike.namespace.xdr_write_error
(gauge)
[Legacy] The number of write requests initiated by XDR that failed on the namespace on this node. Deprecated.
Shown as request
aerospike.namespace.xdr_write_success
(gauge)
[Legacy] The number of write requests initiated by XDR that succeeded on the namespace on this node. Deprecated.
Shown as request
aerospike.namespace.xdr_write_timeout
(gauge)
[Legacy] The number of write requests initiated by XDR that timed out on the namespace on this node
Shown as request
aerospike.namespace.xmem_id
(gauge)
[Legacy] The extended memory id of the namespace
aerospike.node_stats.batch_index_error.count
(count)
[OpenMetricsV2 and Aerospike v3.9+] batch index error
aerospike.node_stats.client_connections
(gauge)
[OpenMetricsV2] client connections
aerospike.node_stats.client_connections_opened.count
(count)
[OpenMetricsV2 and Aerospike v5.6+] client connections opened
aerospike.node_stats.cluster_size
(gauge)
[OpenMetricsV2] cluster size
aerospike.node_stats.fabric_connections_opened.count
(count)
[OpenMetricsV2 and Aerospike v5.6+] fabric connections opened
aerospike.node_stats.heap_efficiency_pct
(gauge)
[OpenMetricsV2 and Aerospike v3.10.1+] heap efficiency pct
aerospike.node_stats.heartbeat_connections_opened.count
(count)
[OpenMetricsV2 and Aerospike v5.6+] heartbeat connections opened
aerospike.node_stats.rw_in_progress
(gauge)
[OpenMetricsV2 and Aerospike v3.9+] rw in progress
aerospike.node_stats.system_free_mem_pct
(gauge)
[OpenMetricsV2] system free mem pct
aerospike.noship_recs_expired
(gauge)
[Legacy] The number of records not shipped because the record expired before XDR was able to ship it. Deprecated since 3.9
aerospike.noship_recs_hotkey
(gauge)
[Legacy] The number of record's digests that are skipped due to an already existing entry in the reader's thread cache (meaning a version of this record was just shipped). Should be interpreted in conjunction withnoshiprecshotkey_timeout. Deprecated since 3.9
aerospike.noship_recs_notmaster
(gauge)
[Legacy] The number of records in the digest log that were not shipped because the local node is not the master node for these records. Deprecated since 3.9
aerospike.noship_recs_uninitialized_destination
(gauge)
[Legacy] The number of records in the digest log not shipped because the destination cluster has not been initialized. Deprecated since 3.9
aerospike.noship_recs_unknown_namespace
(gauge)
[Legacy] The number of records in the digest log not shipped because they belong to an unknown namespace (should never happen). Deprecated since 3.9
aerospike.objects
(gauge)
[Legacy] The total number of replicated objects on this node. Includes master and replica objects.
Shown as record
aerospike.ongoing_write_reqs
(gauge)
[Legacy] The number of records currently in write transactions. Deprecated since 3.9
aerospike.partition_absent
(gauge)
[Legacy] The number of partitions for which this node is not either master or replica. Deprecated since 3.9
aerospike.partition_actual
(gauge)
[Legacy] The number of partitions for which this node is acting as master. Deprecated since 3.9
aerospike.partition_desync
(gauge)
[Legacy] The number of partitions that are not yet synced with the rest of the cluster. Deprecated since 3.9
aerospike.partition_object_count
(gauge)
[Legacy] The total number of objects. Deprecated since 3.9
aerospike.partition_ref_count
(gauge)
[Legacy] The number of partitions that are currently being read. Deprecated since 3.9
aerospike.partition_replica
(gauge)
[Legacy] The number of partitions for which this node is acting as replica. Deprecated since 3.9
aerospike.process_cpu_pct
(gauge)
[Legacy] The percentage of CPU usage by the asd process.
Shown as percent
aerospike.proxy_action
(gauge)
[Legacy] The number of proxy requests received from other nodes. Deprecated since 3.9
aerospike.proxy_in_progress
(gauge)
[Legacy] The number of proxies in progress.
aerospike.proxy_initiate
(gauge)
[Legacy] The number of scan requests initiated. Deprecated since 3.9
aerospike.proxy_retry
(gauge)
[Legacy] The number of retried proxy requests to other nodes. Deprecated since 3.9
aerospike.proxy_retry_new_dest
(gauge)
[Legacy] The number of proxy retries this node delivered to a new destination. Deprecated since 3.9
aerospike.proxy_retry_q_full
(gauge)
[Legacy] The number of proxy retries failed because fabric queue was full. Deprecated since 3.9
aerospike.proxy_retry_same_dest
(gauge)
[Legacy] The number of proxy retries this node delivered to the same destination. Deprecated since 3.9
aerospike.proxy_unproxy
(gauge)
[Legacy] The number of re-executions (from scratch) because of unavailability of proxy node. Deprecated since 3.9
aerospike.query_abort
(gauge)
[Legacy] The number of user aborted queries seen by this node. Deprecated since 3.9
aerospike.query_agg
(gauge)
[Legacy] The number of aggregations run on this node seen by this node. Deprecated since 3.9
aerospike.query_agg_abort
(gauge)
[Legacy] The number of aggregations aborted by the user seen by this node. Deprecated since 3.9
aerospike.query_agg_avg_rec_count
(gauge)
[Legacy] The average number of records returned by aggregations seen by this node. Deprecated since 3.9
aerospike.query_agg_err
(gauge)
[Legacy] The number of aggregations fail due to an internal error seen by this node. Deprecated since 3.9
aerospike.query_agg_success
(gauge)
[Legacy] The number of aggregations which succeeded on this node without error seen by this node. Deprecated since 3.9
aerospike.query_avg_rec_count
(gauge)
[Legacy] The average number of records returned of all queries which executed on this node. Deprecated since 3.9
aerospike.query_fail
(gauge)
[Legacy] The number of queries which failed due to an internal error seen by this node. Deprecated since 3.9
aerospike.query_long_queue_full
(gauge)
[Legacy] The number of long running queries queue full errors. Deprecated since 3.9
aerospike.query_long_queue_size
(gauge)
[Legacy]
aerospike.query_long_reqs
(gauge)
[Legacy] The number of long running queries currently in process. Deprecated since 3.9.
aerospike.query_long_running
(gauge)
[Legacy] The number of long running queries ever attempted in the system (query selected record more than query_threshold).
aerospike.query_lookup_abort
(gauge)
[Legacy] The number of user aborted look-ups seen by this node. Deprecated since 3.9
aerospike.query_lookup_avg_rec_count
(gauge)
[Legacy] The average number of records returned by all look-ups seen by this node. Deprecated since 3.9
aerospike.query_lookup_err
(gauge)
[Legacy] The number of look-ups fail due to an error seen by this node. Deprecated since 3.9
aerospike.query_lookup_success
(gauge)
[Legacy] The number of look-ups which succeeded on this node. Deprecated since 3.9
aerospike.query_lookups
(gauge)
[Legacy] The number of look-ups performed by this node. Deprecated since 3.9
aerospike.query_reqs
(gauge)
[Legacy] The number of query requests received by this node. Deprecated since 3.9
aerospike.query_short_queue_full
(gauge)
[Legacy] The number of short running queries queue full errors. Deprecated since 3.9
aerospike.query_short_queue_size
(gauge)
[Legacy]
aerospike.query_short_reqs
(gauge)
[Legacy] The number of short running queries currently in process. Deprecated since 3.9
aerospike.query_short_running
(gauge)
[Legacy] The number of short running queries ever attempted in the system (query selected record less than query_threshold).
aerospike.query_success
(gauge)
[Legacy] The number of queries succeeded on this node. Deprecated since 3.9
aerospike.query_tracked
(gauge)
[Legacy] The number of queries which ran more than query untracked_time
aerospike.queue
(gauge)
[Legacy] The number of pending requests waiting to execute. Deprecated since 3.9
aerospike.read_dup_prole
(gauge)
[Legacy] The number of requests sent for duplicate resolution. Deprecated since 3.9
aerospike.read_threads_avg_processing_time_pct
(gauge)
[Legacy]
Shown as percent
aerospike.read_threads_avg_waiting_time_pct
(gauge)
[Legacy]
Shown as percent
aerospike.reaped_fds
(gauge)
[Legacy] The number of idle client connections closed.
aerospike.reclaimed_recs_dlog
(gauge)
[Legacy]
aerospike.record_locks
(gauge)
[Legacy] The number of record index locks currently active in the node. Deprecated since 3.9
aerospike.record_refs
(gauge)
[Legacy] The number of index records currently referenced. Deprecates since 3.9
aerospike.remaining_migrations
(gauge)
[Legacy]
aerospike.rw_err_ack_badnode
(gauge)
[Legacy] The number of acknowledgments from unexpected nodes. Deprecated since 3.9
aerospike.rw_err_ack_internal
(gauge)
[Legacy] The number of prole write acknowledgments failed due to internal errors. Deprecated since 3.9
aerospike.rw_err_ack_nomatch
(gauge)
[Legacy] The number of prole write acknowledgments started but went amiss/have mismatched information. Deprecated since 3.9
aerospike.rw_err_dup_cluster_key
(gauge)
[Legacy] The number of errors encountered during duplicate resolution because of cluster key mismatch. Deprecated since 3.9
aerospike.rw_err_dup_internal
(gauge)
[Legacy] The number of errors encountered during duplicate resolutions. Deprecated since 3.9
aerospike.rw_err_dup_send
(gauge)
[Legacy] The number of errors encountered during duplicate resolutions because of failure to send fabric messages. Deprecated since 3.9
aerospike.rw_err_write_cluster_key
(gauge)
[Legacy] The number of replica write failures due to cluster key mismatch. Deprecated since 3.9
aerospike.rw_err_write_internal
(gauge)
[Legacy] The number of write requests failed because of internal errors (code errors). Deprecated since 3.9
aerospike.rw_err_write_send
(gauge)
[Legacy] The number of prole write acknowledgments fail because of failure in sending fabric message. Deprecated since 3.9
aerospike.rw_in_progress
(gauge)
[Legacy] The number of rw transactions in progress
aerospike.scans_active
(gauge)
[Legacy] The number of scans currently active.
aerospike.set.device_data_bytes
(gauge)
[Legacy] The device storage used by data (master and proles) excluding primary index.
Shown as byte
aerospike.set.disable_eviction
(gauge)
[Legacy] Whether or not this set is protected from evictions
aerospike.set.enable_index
(gauge)
[Legacy] Whether or not this set has its own index
aerospike.set.index_populating
(gauge)
[Legacy]
aerospike.set.memory_data_bytes
(gauge)
[Legacy] The memory used by this set for the data part (does not include index part). Value will be 0 if data is not stored in memory.
Shown as byte
aerospike.set.objects
(gauge)
[Legacy] The total number of objects (master and all replicas) in this set on this node.
Shown as record
aerospike.set.sindexes
(gauge)
[Legacy]
aerospike.set.stop_writes_count
(gauge)
[Legacy] The total count this set has hit stop_writes
aerospike.set.tombstones
(gauge)
[Legacy] The total number of tombstones (master and all replicas) in this set on this node.
aerospike.set.truncate_lut
(gauge)
[Legacy] The "most covering" truncate_lut for this set.
aerospike.sindex.delete_error
(gauge)
[Legacy] The number of errors while processing a delete transaction for this secondary index.
aerospike.sindex.delete_success
(gauge)
[Legacy] The number of successful delete transactions processed for this secondary index.
aerospike.sindex.entries
(gauge)
[Legacy] The number of secondary index entries for this secondary index. This is the number of records that have been indexed by this secondary index.
aerospike.sindex.histogram
(gauge)
[Legacy] Indicates whether histograms are enabled for this Sindex or not.
aerospike.sindex.ibtr_memory_used
(gauge)
[Legacy] The amount of memory the secondary index is consuming for the keys
Shown as byte
aerospike.sindex.keys
(gauge)
[Legacy] The number of secondary keys for this secondary index.
aerospike.sindex.load_pct
(gauge)
[Legacy] The progress in percentage of the creation of secondary index.
Shown as percent
aerospike.sindex.loadtime
(gauge)
[Legacy] The time it took for the secondary index to be fully created.
Shown as second
aerospike.sindex.nbtr_memory_used
(gauge)
[Legacy] The amount of memory the secondary index is consuming for the entries
Shown as byte
aerospike.sindex.query_agg
(gauge)
[Legacy] The number of query aggregations attempted for this secondary index on this node.
aerospike.sindex.query_agg_avg_rec_count
(gauge)
[Legacy] The average number of records returned by the aggregations underlying queries against this secondary index.
aerospike.sindex.query_agg_avg_record_size
(gauge)
[Legacy] The average size of the records returned by the aggregations underlying queries against this secondary index.
aerospike.sindex.query_avg_rec_count
(gauge)
[Legacy] The average number of records returned by the all queries against this secondary index (combines queryaggavgreccount and querylookupavgreccount).
aerospike.sindex.query_avg_record_size
(gauge)
[Legacy] The average size of the records returned by all the queries against this secondary index (combines queryaggavgrecordsize and querylookupavgrecordsize)
aerospike.sindex.query_lookup_avg_rec_count
(gauge)
[Legacy] The average number of records returned by the lookup queries against this secondary index.
aerospike.sindex.query_lookup_avg_record_size
(gauge)
[Legacy] The average size of the records returned by the lookup queries against this secondary index.
aerospike.sindex.query_lookups
(gauge)
[Legacy] The number of lookup queries ever attempted for this secondary index on this node.
aerospike.sindex.query_reqs
(gauge)
[Legacy] The number of query requests ever attempted for this secondary index on this node (combines querylookups and queryagg).
aerospike.sindex.si_accounted_memory
(gauge)
[Legacy] The amount of memory the secondary index is consuming. This is the sum of ibtrmemoryused and nbtrmemoryused.
Shown as byte
aerospike.sindex.stat_delete_errs
(gauge)
[Legacy] The number of errors while processing a delete transaction for this secondary index. Deprecated since 3.9
aerospike.sindex.stat_delete_reqs
(gauge)
[Legacy] The number of attempts to process delete transactions for this secondary index. Deprecated since 3.9
aerospike.sindex.stat_delete_success
(gauge)
[Legacy] The number of successful delete transactions processed for this secondary index. Deprecated since 3.9
aerospike.sindex.stat_gc_recs
(gauge)
[Legacy] The number of records that have been garbage collected out of the secondary index memory.
aerospike.sindex.stat_gc_time
(gauge)
[Legacy] The amount of time spent processing garbage collection for the secondary index.
aerospike.sindex.stat_write_errs
(gauge)
[Legacy] The number of errors while processing a write transaction for this secondary index. Deprecated since 3.9
aerospike.sindex.stat_write_reqs
(gauge)
[Legacy] The number of attempts to process write transactions for this secondary index. Deprecated since 3.9
aerospike.sindex.stat_write_success
(gauge)
[Legacy] The number of successful write transactions processed for this secondary index. Deprecated since 3.9
aerospike.sindex.write_error
(gauge)
[Legacy] The number of errors while processing a write transaction for this secondary index
aerospike.sindex.write_success
(gauge)
[Legacy] The number of successful write transactions processed for this secondary index
aerospike.sindex_gc_activity_dur
(gauge)
[Legacy] The sum of sindex GC thread activity. Deprecated since 3.14
Shown as millisecond
aerospike.sindex_gc_garbage_cleaned
(gauge)
[Legacy] The sum of secondary index garbage entries cleaned by sindex GC.
aerospike.sindex_gc_garbage_found
(gauge)
[Legacy] The sum of secondary index garbage entries found by sindex GC.
aerospike.sindex_gc_inactivity_dur
(gauge)
[Legacy] The sum of sindex GC thread inactivity. Deprecated since 3.14
Shown as millisecond
aerospike.sindex_gc_list_creation_time
(gauge)
[Legacy] The sum of time spent in finding secondary index garbage entries by sindex GC. Deprecated since 3.14
Shown as millisecond
aerospike.sindex_gc_list_deletion_time
(gauge)
[Legacy] The sum of time spent in cleaning sindex garbage entries by sindex GC
Shown as millisecond
aerospike.sindex_gc_locktimedout
(gauge)
[Legacy] The number of times sindex gc iteration timed out waiting for partition lock.
aerospike.sindex_gc_objects_validated
(gauge)
[Legacy] The number of secondary index entries processed by sindex GC.
aerospike.sindex_gc_retries
(gauge)
[Legacy] The number of retries when sindex GC cannot get sprigs lock.
aerospike.sindex_ucgarbage_found
(gauge)
[Legacy] The number of un-cleanable garbage entries in the sindexes encountered through queries.
aerospike.sindex_used_bytes_memory
(gauge)
[Legacy] The amount of memory occupied by secondary indexes on this node. Deprecated since 3.9
Shown as byte
aerospike.stat_cluster_key_err_ack_dup_trans_reenqueue
(gauge)
[Legacy] The number of duplicate trans re-enqueued because of cluster key mismatch. Deprecated since 3.9
aerospike.stat_cluster_key_err_ack_rw_trans_reenqueue
(gauge)
[Legacy] The number of Read/Write trans re-enqueued because of cluster key mismatch. Deprecated
aerospike.stat_cluster_key_partition_transaction_queue_count
(gauge)
[Legacy] The number of partition transactions queued. Deprecated
aerospike.stat_cluster_key_prole_retry
(gauge)
[Legacy] The number of times a prole write was retried as a result of a cluster key mismatch. Deprecated
aerospike.stat_cluster_key_regular_processed
(gauge)
[Legacy] The number of successful transactions that passed the cluster key test. Deprecated
aerospike.stat_cluster_key_trans_to_proxy_retry
(gauge)
[Legacy] The number of times a proxy was redirected. Deprecated
aerospike.stat_cluster_key_transaction_reenqueue
(gauge)
[Legacy]
aerospike.stat_delete_success
(gauge)
[Legacy] The number of successful record deletes. Deprecated since 3.9
aerospike.stat_deleted_set_objects
(gauge)
[Legacy] The number of deleted set objects as result of a 'set-delete' command. Deprecated since 3.9
aerospike.stat_duplicate_operation
(gauge)
[Legacy] The number of read/write transactions which require duplicate resolution. Deprecated since 3.9
aerospike.stat_evicted_objects
(gauge)
[Legacy] The number of objects evicted. Deprecated since 3.9
aerospike.stat_evicted_objects_time
(gauge)
[Legacy] The average expiry time (TTL) of the objects evicted in the last iteration. Deprecated since 3.9
aerospike.stat_evicted_set_objects
(gauge)
[Legacy] The number of objects evicted from a Set due to set limits defined in Aerospike configuration. Deprecated
aerospike.stat_expired_objects
(gauge)
[Legacy] The number of objects expired. Deprecated since 3.9
aerospike.stat_ldt_proxy
(gauge)
[Legacy] The number of proxies for LDT records. Deprecated since 3.9
aerospike.stat_nsup_deletes_not_shipped
(gauge)
[Legacy] The number of deletes resulting from eviction/expiration etc. that are not shipped. Deprecated since 3.9
aerospike.stat_proxy_errs
(gauge)
[Legacy] The number of proxy requests returning errors. Deprecated since 3.9
aerospike.stat_proxy_reqs
(gauge)
[Legacy] The number of proxy requests attempted. Deprecated since 3.9
aerospike.stat_proxy_reqs_xdr
(gauge)
[Legacy] The number of XDR operations that resulted in proxies. Deprecated since 3.9
aerospike.stat_proxy_success
(gauge)
[Legacy] The number of proxy requests served successfully. Deprecated since 3.9
aerospike.stat_read_errs_notfound
(gauge)
[Legacy] The number of read requests resulting in error : 'key not found'. Deprecated since 3.9
aerospike.stat_read_errs_other
(gauge)
[Legacy] The number of read requests resulting in other errors. Deprecated since 3.9
aerospike.stat_read_reqs
(gauge)
[Legacy] The number of total read requests attempted. Deprecated since 3.9
aerospike.stat_read_reqs_xdr
(gauge)
[Legacy] The number of XDR read requests attempted. Deprecated since 3.9
aerospike.stat_read_success
(gauge)
[Legacy] The number of read requests successful. Deprecated since 3.9
aerospike.stat_recs_inflight
(gauge)
[Legacy]
aerospike.stat_recs_linkdown_processed
(gauge)
[Legacy]
aerospike.stat_recs_logged
(gauge)
[Legacy] The number of records logged into digest log. Deprecated since 3.9
aerospike.stat_recs_logged_master
(gauge)
[Legacy]
aerospike.stat_recs_outstanding
(gauge)
[Legacy] The number of outstanding records not yet processed by the main thread. Deprecated since 3.9
aerospike.stat_recs_relogged
(gauge)
[Legacy] The number of records relogged by this node into the digest log due to temporary issues when attempting to ship. Deprecated since 3.9
aerospike.stat_recs_relogged_incoming
(gauge)
[Legacy] The number of records relogged into this node's digest log by another node. Deprecated since 3.9
aerospike.stat_recs_relogged_outgoing
(gauge)
[Legacy] The number of records relogged to another node's digest log. Deprecated since 3.9
aerospike.stat_recs_replprocessed
(gauge)
[Legacy] The number of records processed for a node in the cluster that is not the local node. Deprecated since 3.9
aerospike.stat_recs_shipped
(gauge)
[Legacy] The number of records shipped to remote Aerospike clusters. Includes errors. Deprecated since 3.9
aerospike.stat_recs_shipped_binlevel
(gauge)
[Legacy] The number of records that took advantage of bin level shipping. Deprecated since 3.9
aerospike.stat_recs_shipped_ok
(gauge)
[Legacy] The number of records successfully shipped to remote Aerospike clusters. Deprecated since 3.9
aerospike.stat_rw_timeout
(gauge)
[Legacy] The number of read and write requests failed because of timeout on the server. Deprecated since 3.9
aerospike.stat_slow_trans_queue_batch_pop
(gauge)
[Legacy] The number of times we moved a batch of trans from slow queue to fast queue. Deprecated
aerospike.stat_slow_trans_queue_pop
(gauge)
[Legacy] The number of trans that were moved from slow queue to fast queue. Deprecated
aerospike.stat_slow_trans_queue_push
(gauge)
[Legacy] The number of trans that we pushed onto the slow queue. Deprecated
aerospike.stat_write_errs
(gauge)
[Legacy] The number of write requests resulting in errors. Deprecated since 3.9
aerospike.stat_write_errs_notfound
(gauge)
[Legacy] The number of errors returning key not found on a write request. Deprecated since 3.9
aerospike.stat_write_errs_other
(gauge)
[Legacy] The number of non 'not found' errors on a write requests. Deprecated since 3.9
aerospike.stat_write_reqs
(gauge)
[Legacy] The number of total writes requests attempted. Deprecated since 3.9
aerospike.stat_write_reqs_xdr
(gauge)
[Legacy] The number of write requests from XDR. Deprecated since 3.9
aerospike.stat_write_success
(gauge)
[Legacy] The number of write requests successful. Deprecated since 3.9
aerospike.stat_xdr_pipe_miss
(gauge)
[Legacy] The number of log records that couldn't be written to the named pipe by the server. Generally happens when XDR end of pipe is closed. Deprecated since 3.8.1
aerospike.stat_xdr_pipe_writes
(gauge)
[Legacy] The number of log records that were written to the named pipe by the server. Deprecated since 3.8.1
aerospike.stat_zero_bin_records
(gauge)
[Legacy] The number of write_requests that failed because of zero bin records. Deprecated since 3.9
aerospike.storage_defrag_corrupt_record
(gauge)
[Legacy] The number of times the defrag thread encountered invalid records. Deprecated since 3.9
aerospike.sub_records
(gauge)
[Legacy] The number of sub objects. Replace with sub_objects stat in 3.9.
aerospike.system_free_mem_pct
(gauge)
[Legacy] Percentage of free system memory.
Shown as percent
aerospike.system_kernel_cpu_pct
(gauge)
[Legacy] The percentage of CPU usage by processes running in kernel mode.
Shown as percent
aerospike.system_swapping
(gauge)
[Legacy] Indicate that the system is currently swapping RAM to disk
aerospike.system_total_cpu_pct
(gauge)
[Legacy] The percentage of CPU usage by all running processes.
Shown as percent
aerospike.system_user_cpu_pct
(gauge)
[Legacy] The percentage of CPU usage by processes running in user mode.
Shown as percent
aerospike.time_since_rebalance
(gauge)
[Legacy] The number of seconds since the last reclustering event, either triggered via the recluster info command or by a cluster disruption (such as a node being add/removed or a network disruption).
Shown as second
aerospike.tombstones
(gauge)
[Legacy] The total number tombstones on this node.
aerospike.total_bytes_disk
(gauge)
[Legacy] The total bytes of disk space allocated on this node. Deprecated since 3.9
Shown as byte
aerospike.total_bytes_memory
(gauge)
[Legacy] The total bytes of memory allocated on this node. Deprecated since 3.9
Shown as byte
aerospike.total_recs_dlog
(gauge)
[Legacy]
aerospike.transaction_queue_used
(gauge)
[Legacy]
aerospike.transaction_queue_used_pct
(gauge)
[Legacy]
Shown as percent
aerospike.transactions
(gauge)
[Legacy] The total number of transactions executed by this node -- includes all reads/writes/info commands. Deprecated since 3.9
aerospike.tree_count
(gauge)
[Legacy] The number of index trees currently active in the node. Deprecated since 3.9
aerospike.tree_gc_queue
(gauge)
[Legacy] The number of trees queued up ready to be completely removed (partitions drop)
aerospike.tscan_aborted
(gauge)
[Legacy] The number of scans that were aborted. Deprecated as of 3.6.0.
aerospike.tscan_initiate
(gauge)
[Legacy] The number of new scan requests initiated. Deprecated as of 3.6.0.
aerospike.tscan_pending
(gauge)
[Legacy] The number of scan requests pending. Deprecated as of 3.6.0.
aerospike.tscan_succeeded
(gauge)
[Legacy] The number of scan requests that have successfully finished. Deprecated as of 3.6.0.
aerospike.tsvc_queue
(gauge)
[Legacy] The number of pending requests waiting to execute in the transaction queue
aerospike.udf_bg_scans_failed
(gauge)
[Legacy] The number of scan background udf jobs that failed. Deprecated since 3.9
aerospike.udf_bg_scans_succeeded
(gauge)
[Legacy] The number of scan background udf jobs that completed. Deprecated since 3.9
aerospike.udf_delete_err_others
(gauge)
[Legacy] The number of errors encountered during UDF delete. Deprecated since 3.9
aerospike.udf_delete_reqs
(gauge)
[Legacy] The number of UDF delete requests attempted. Deprecated since 3.9
aerospike.udf_delete_success
(gauge)
[Legacy] The number of successful UDF delete operations. Deprecated since 3.9
aerospike.udf_lua_errs
(gauge)
[Legacy] The number of overall Lua errors. Deprecated since 3.9
aerospike.udf_query_rec_reqs
(gauge)
[Legacy] The number of record UDF calls in a query background udf job. Deprecated since 3.9
aerospike.udf_read_errs_other
(gauge)
[Legacy] The number of unsuccessful UDF read operations. Deprecated since 3.9
aerospike.udf_read_reqs
(gauge)
[Legacy] The number of UDF read requests attempted. Deprecated since 3.9
aerospike.udf_read_success
(gauge)
[Legacy] The number of successful UDF read operations. Deprecated since 3.9
aerospike.udf_replica_writes
(gauge)
[Legacy] The number of UDF replica writes. Deprecated since 3.9
aerospike.udf_scan_rec_reqs
(gauge)
[Legacy] The number of record UDF calls in a scan background udf job. Deprecated since 3.9
aerospike.udf_write_err_others
(gauge)
[Legacy] The number of unsuccessful UDF write operations. Deprecated since 3.9
aerospike.udf_write_reqs
(gauge)
[Legacy] The number of UDF write requests attempted. Deprecated since 3.9
aerospike.udf_write_success
(gauge)
[Legacy] The number of successful UDF write operations. Deprecated since 3.9
aerospike.uptime
(gauge)
[Legacy] The time since last server restart.
Shown as second
aerospike.used_bytes_disk
(gauge)
[Legacy] The total bytes of disk space used on this node. Deprecated
Shown as byte
aerospike.used_bytes_memory
(gauge)
[Legacy] The total bytes of memory used on this node. Deprecated since 3.9
Shown as byte
aerospike.used_recs_dlog
(gauge)
[Legacy]
aerospike.waiting_transactions
(gauge)
[Legacy] The number of read/write transactions currently queued. Deprecated since 3.9
aerospike.write_master
(gauge)
[Legacy] The number of master writes performed by this node. Deprecated since 3.9
aerospike.write_prole
(gauge)
[Legacy] The number of prole (replica) writes performed by this node. Deprecated since 3.9
aerospike.xdr.abandoned.count
(count)
[OpenMetricsV2 and Aerospike 5.0+] Number of records abandoned because of permanent failure at the destination.
aerospike.xdr.lag
(gauge)
[OpenMetricsV2 and Aerospike v5.0+] Lag in seconds between the destination and the source datacenters
aerospike.xdr.lap_us
(gauge)
[OpenMetricsV2 and Aerospike v5.0+] Time in microseconds taken to process records across partitions in one lap (processing cycle).
aerospike.xdr.latency_ms
(gauge)
[OpenMetricsV2 and Aerospike v5.0+] Average network latency for the successfully shipped latency.
aerospike.xdr.recoveries.count
(count)
[OpenMetricsV2 and Aerospike v5.0+] Number of partitions that are recovered by reducing the primary index of that partition.
aerospike.xdr.recoveries_pending
(gauge)
[OpenMetricsV2 and Aerospike v5.0+] Number of recoveries currently pending.
aerospike.xdr.retry_conn_reset.count
(count)
[OpenMetricsV2 and Aerospike v5.0+] Number of records whose shipment is retried due to a reset of the connection to the remote datacenter.
aerospike.xdr.retry_dest.count
(count)
[OpenMetricsV2 and Aerospike v5.0+] Number of records retried due to a temporary error returned by destination node.
aerospike.xdr.retry_no_node.count
(count)
[OpenMetricsV2 and Aerospike v5.0+] Number of records retried because XDR cannot determine which destination node is the master.
aerospike.xdr.success.count
(count)
[OpenMetricsV2 and Aerospike v5.0+] Number of records successfully shipped to remote datacenters.
aerospike.xdr_active_failed_node_sessions
(gauge)
[Legacy] The failed node session keeps track of node at the local cluster that have left the cluster and need other nodes to ship on their behalf until they join back.
aerospike.xdr_active_link_down_sessions
(gauge)
[Legacy] The link down session keeps track of destination clusters that are not reachable for a given time window.
aerospike.xdr_deletes_canceled
(gauge)
[Legacy] The number of delete operations that were not shipped because the record reappeared on the local server. Deprecated since 3.9
aerospike.xdr_deletes_shipped
(gauge)
[Legacy] The number of delete operations that were successfully shipped. Deprecated since 3.9
aerospike.xdr_global_lastshiptime
(gauge)
[Legacy] The minimum last ship time in millisecond (epoch) for XDR for across the cluster.
Shown as millisecond
aerospike.xdr_hotkey_fetch
(gauge)
[Legacy] The number of record's digest that are actually shipped because their cache entries expired and were dirty. Should be interpreted in conjunction with xdrhotkeyskip
aerospike.xdr_hotkey_skip
(gauge)
[Legacy] The number of record's digests that are skipped due to an already existing entry in the reader's thread cache (meaning a version of this record was just shipped). Should be interpreted in conjunction with xdrhotkeyfetch
aerospike.xdr_min_lastshipinfo
(gauge)
[Legacy] The minimum last ship time in millisecond (epoch) for XDR for across the cluster. Deprecated since 3.10
aerospike.xdr_queue_overflow_error
(gauge)
[Legacy] The number of XDR queue overflow errors. Typically happens when there are no physical space available on the storage holding the digest log or if the writes are happening at such a rate that elements are not written fast enough to the digest log.
aerospike.xdr_read_active_avg_pct
(gauge)
[Legacy] How busy the XDR read threads are by calculating the average time in percent of total time that the XDR read threads spend actually processing something vs. waiting for a new digest log entry to arrive on their queues from the dlogreader / failed node shippers / window shippers.
Shown as percent
aerospike.xdr_read_error
(gauge)
[Legacy] The number of read requests initiated by XDR that failed.
aerospike.xdr_read_idle_avg_pct
(gauge)
[Legacy] A sister statistic to xdrreadactiveavgpct and represents the average time in percent of total time that the XDR read threads waits for a new digest log entry to arrive on their queues from the dlogreader / failed node shippers / window shippers.
Shown as percent
aerospike.xdr_read_latency_avg
(gauge)
[Legacy] The moving average latency for XDR to read a record.
Shown as millisecond
aerospike.xdr_read_not_found
(gauge)
[Legacy] The number of read requests initiated by XDR that were not found.
aerospike.xdr_read_reqq_used
(gauge)
[Legacy] The number of digest log entries are currently in the XDR read threads queues.
aerospike.xdr_read_reqq_used_pct
(gauge)
[Legacy] A sister statistic to xdrreadreqq_used to represent how full in percent the XDR read request queues are.
Shown as percent
aerospike.xdr_read_respq_used
(gauge)
[Legacy] The number of entries are being used in the XDR read response queues.
aerospike.xdr_read_success
(gauge)
[Legacy] The number of read requests initiated by XDR that succeeded.
aerospike.xdr_read_txnq_used
(gauge)
[Legacy] The number of XDR read transactions that are in flight in the local transaction queue.
aerospike.xdr_read_txnq_used_pct
(gauge)
[Legacy] The percent used of the XDR read transactions that are in flight (out of a maximum allowed of 10000) in the transaction queue (which is also used for regular client transactions).
Shown as percent
aerospike.xdr_relogged_incoming
(gauge)
[Legacy] The number of records relogged into this node's digest log by another node.
aerospike.xdr_relogged_outgoing
(gauge)
[Legacy] The number of records relogged to another node's digest log.
aerospike.xdr_ship_bytes
(gauge)
[Legacy] The estimated number of bytes XDR has shipped to remote clusters.
aerospike.xdr_ship_compression_avg_pct
(gauge)
[Legacy] This determines how beneficial compression is (higher is better)
Shown as percent
aerospike.xdr_ship_delete_success
(gauge)
[Legacy] The number of delete operations that were successfully shipped.
aerospike.xdr_ship_destination_error
(gauge)
[Legacy] The number of errors from the remote cluster(s) while shipping records.
aerospike.xdr_ship_destination_permanent_error
(gauge)
[Legacy] The number of permanent errors from the remote cluster(s) while shipping records.
Shown as error
aerospike.xdr_ship_full_record
(gauge)
[Legacy] The number of records that did not take advantage of bin level shipping
aerospike.xdr_ship_inflight_objects
(gauge)
[Legacy] The number of objects that are inflight (which have been shipped but for which a response from the remote DC has not yet been received).
aerospike.xdr_ship_latency_avg
(gauge)
[Legacy] The moving average latency to ship a record to remote Aerospike clusters.
Shown as millisecond
aerospike.xdr_ship_outstanding_objects
(gauge)
[Legacy] The number of outstanding records not yet processed.
aerospike.xdr_ship_source_error
(gauge)
[Legacy] The number of client layer errors while shipping records.
aerospike.xdr_ship_success
(gauge)
[Legacy] The number of records successfully shipped to remote Aerospike clusters. Across all datacenters meaning one record successfully shipped to 3 different datacenters will increment this counter by 3
aerospike.xdr_throughput
(gauge)
[Legacy] The records per second throughput XDR is currently able to ship across all datacenters configured.
Shown as record
aerospike.xdr_timelag
(gauge)
[Legacy] The difference between the current time and the timestamp of the record which was last attempted to be shipped
Shown as second
aerospike.xdr_uninitialized_destination_error
(gauge)
[Legacy] The number of records in the digest log not shipped because the destination cluster has not been initialized for a DC that is configured for a namespace.
aerospike.xdr_unknown_namespace_error
(gauge)
[Legacy] The number of records in the digest log not shipped because they belong to an unknown namespace on the source cluster.
aerospike.xdr_uptime
(gauge)
[Legacy] The time the XDR process has been running. Deprecated in 3.11.1.1
Shown as second

Service Checks

aerospike.can_connect aerospike.cluster_up

Events

Aerospike does not include any events.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers