Amazon MSK (Agent)

Supported OS Linux Windows Mac OS

Integration version6.5.0

Overview

Amazon Managed Streaming for Apache Kafka (MSK) is a fully managed service that makes it easy to build and run applications that use Apache Kafka to process streaming data.

You can collect metrics from this integration in two ways-with the Datadog Agent or with a Crawler that collects metrics from CloudWatch.

Consider Data Streams Monitoring to enhance your MSK integration. This solution enables pipeline visualization and lag tracking, helping you identify and resolve bottlenecks.

Setup

The Agent check monitors Amazon Managed Streaming for Apache Kafka (Amazon MSK) through the Datadog Agent.

Follow the instructions below to install and configure this check for an Agent running on a host. For containerized environments, see the Autodiscovery Integration Templates for guidance on applying these instructions.

This OpenMetrics-based integration has a latest mode (use_openmetrics: true) and a legacy mode (use_openmetrics: false). To get all the most up-to-date features, Datadog recommends enabling the latest mode. For more information, see Latest and Legacy Versioning For OpenMetrics-based Integrations.

Installation

  1. Create a client machine if one does not already exist.
  2. Ensure the client machine has been granted the permission policy arn:aws:iam::aws:policy/AmazonMSKReadOnlyAccess or equivalent credentials are available.
  3. Enable open monitoring with Prometheus on the MSK side to enable the JmxExporter and the NodeExporter.
  4. Install the Datadog Agent on the client machine just created.

Configuration

  1. Edit the amazon_msk.d/conf.yaml file, in the conf.d/ folder at the root of your Agent’s configuration directory to start collecting your Amazon MSK performance data.

    Include custom tags that attach to every metric and service check provided by this integration.

    tags:
      - <KEY_1>:<VALUE_1>
      - <KEY_2>:<VALUE_2>
    

    See the sample amazon_msk.d/conf.yaml for all available configuration options for the latest mode. For the legacy mode of this integration, see the legacy example.

  2. Restart the Agent.

Validation

Run the Agent’s status subcommand and look for amazon_msk under the Checks section.

Data Collected

Metrics

aws.msk.go.gc.duration.seconds.count
(count)
GC invocation durations count. This is a count on OpenMetricsV2 and a gauge on OpenMetricsV1.
aws.msk.go.gc.duration.seconds.quantile
(gauge)
GC invocation duration quantile.
Shown as second
aws.msk.go.gc.duration.seconds.sum
(count)
GC invocation duration total. This is a count on OpenMetricsV2 and a gauge on OpenMetricsV1.
Shown as second
aws.msk.go.goroutines
(gauge)
Number of goroutines that currently exist.
Shown as thread
aws.msk.go.info
(gauge)
Information about the Go environment.
aws.msk.go.memstats.alloc.bytes
(gauge)
Number of bytes allocated and still in use.
Shown as byte
aws.msk.go.memstats.alloc.bytes.count
(count)
[OpenMetricsV2] Total number of bytes allocated, even if freed.
Shown as byte
aws.msk.go.memstats.alloc.bytes.total
(count)
[OpenMetricsV1] Total number of bytes allocated, even if freed.
Shown as byte
aws.msk.go.memstats.buck.hash.sys.bytes
(gauge)
Number of bytes used by the profiling bucket hash table.
Shown as byte
aws.msk.go.memstats.frees.count
(count)
[OpenMetricsV2] Total number of frees.
aws.msk.go.memstats.frees.total
(count)
Total number of frees.
aws.msk.go.memstats.gc.cpu.fraction
(gauge)
The fraction of this program's available CPU time used by the GC since the program started.
aws.msk.go.memstats.gc.sys.bytes
(gauge)
Number of bytes used for garbage collection system metadata.
Shown as byte
aws.msk.go.memstats.heap.alloc.bytes
(gauge)
Number of heap bytes allocated and still in use.
Shown as byte
aws.msk.go.memstats.heap.idle.bytes
(gauge)
Number of heap bytes waiting to be used.
Shown as byte
aws.msk.go.memstats.heap.inuse.bytes
(gauge)
Number of heap bytes that are in use.
Shown as byte
aws.msk.go.memstats.heap.objects
(gauge)
Number of allocated objects.
aws.msk.go.memstats.heap.released.bytes
(gauge)
Number of heap bytes released to OS.
Shown as byte
aws.msk.go.memstats.heap.sys.bytes
(gauge)
Number of heap bytes obtained from system.
Shown as byte
aws.msk.go.memstats.last.gc.time.seconds
(gauge)
Number of seconds since 1970 of last garbage collection.
Shown as second
aws.msk.go.memstats.lookups.count
(count)
[OpenMetricsV2] Total number of pointer lookups.
aws.msk.go.memstats.lookups.total
(count)
[OpenMetricsV1] Total number of pointer lookups.
aws.msk.go.memstats.mallocs.count
(count)
[OpenMetricsV2] Total number of mallocs.
aws.msk.go.memstats.mallocs.total
(count)
[OpenMetricsV1] Total number of mallocs.
aws.msk.go.memstats.mcache.inuse.bytes
(gauge)
Number of bytes in use by mcache structures.
Shown as byte
aws.msk.go.memstats.mcache.sys.bytes
(gauge)
Number of bytes used for mcache structures obtained from system.
Shown as byte
aws.msk.go.memstats.mspan.inuse.bytes
(gauge)
Number of bytes in use by mspan structures.
Shown as byte
aws.msk.go.memstats.mspan.sys.bytes
(gauge)
Number of bytes used for mspan structures obtained from system.
Shown as byte
aws.msk.go.memstats.next.gc.bytes
(gauge)
Number of heap bytes when next garbage collection will take place.
Shown as byte
aws.msk.go.memstats.other.sys.bytes
(gauge)
Number of bytes used for other system allocations.
Shown as byte
aws.msk.go.memstats.stack.inuse.bytes
(gauge)
Number of bytes in use by the stack allocator.
Shown as byte
aws.msk.go.memstats.stack.sys.bytes
(gauge)
Number of bytes obtained from system for stack allocator.
Shown as byte
aws.msk.go.memstats.sys.bytes
(gauge)
Number of bytes obtained from system.
Shown as byte
aws.msk.go.threads
(gauge)
Number of OS threads created.
Shown as thread
aws.msk.jmx.config.reload.failure.count
(count)
[OpenMetricsV2] Number of times configuration have failed to be reloaded.
aws.msk.jmx.config.reload.failure.total
(count)
[OpenMetricsV1] Number of times configuration have failed to be reloaded.
aws.msk.jmx.config.reload.success.count
(count)
[OpenMetricsV2] Number of times configuration have successfully been reloaded.
aws.msk.jmx.config.reload.success.total
(count)
[OpenMetricsV1] Number of times configuration have successfully been reloaded.
aws.msk.jmx.exporter.build.info
(gauge)
A metric with a constant '1' value labeled with the version of the JMX exporter.
aws.msk.jmx.scrape.duration.seconds
(gauge)
Time this JMX scrape took, in seconds.
Shown as second
aws.msk.jmx.scrape.error
(gauge)
Non-zero if this scrape failed.
aws.msk.kafka.cluster.Partition.Value
(gauge)
Attribute exposed for management (kafka.cluster<>Value)
aws.msk.kafka.consumer.group.ConsumerLagMetrics.Value
(gauge)
Attribute exposed for management (kafka.consumer.group<>Value)
aws.msk.kafka.controller.ControllerChannelManager.50thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>50thPercentile)
aws.msk.kafka.controller.ControllerChannelManager.75thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>75thPercentile)
aws.msk.kafka.controller.ControllerChannelManager.95thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>95thPercentile)
aws.msk.kafka.controller.ControllerChannelManager.98thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>98thPercentile)
aws.msk.kafka.controller.ControllerChannelManager.999thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>999thPercentile)
aws.msk.kafka.controller.ControllerChannelManager.99thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>99thPercentile)
aws.msk.kafka.controller.ControllerChannelManager.Count
(gauge)
Attribute exposed for management (kafka.controller<>Count)
aws.msk.kafka.controller.ControllerChannelManager.Count.count
(count)
Attribute exposed for management (kafka.controller<>Count) as monotonic count
aws.msk.kafka.controller.ControllerChannelManager.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.controller<>FifteenMinuteRate)
aws.msk.kafka.controller.ControllerChannelManager.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.controller<>FiveMinuteRate)
aws.msk.kafka.controller.ControllerChannelManager.Max
(gauge)
Attribute exposed for management (kafka.controller<>Max)
aws.msk.kafka.controller.ControllerChannelManager.Mean
(gauge)
Attribute exposed for management (kafka.controller<>Mean)
aws.msk.kafka.controller.ControllerChannelManager.MeanRate
(gauge)
Attribute exposed for management (kafka.controller<>MeanRate)
aws.msk.kafka.controller.ControllerChannelManager.Min
(gauge)
Attribute exposed for management (kafka.controller<>Min)
aws.msk.kafka.controller.ControllerChannelManager.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.controller<>OneMinuteRate)
aws.msk.kafka.controller.ControllerChannelManager.StdDev
(gauge)
Attribute exposed for management (kafka.controller<>StdDev)
aws.msk.kafka.controller.ControllerChannelManager.Value
(gauge)
Attribute exposed for management (kafka.controller<>Value)
aws.msk.kafka.controller.ControllerEventManager.50thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>50thPercentile)
aws.msk.kafka.controller.ControllerEventManager.75thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>75thPercentile)
aws.msk.kafka.controller.ControllerEventManager.95thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>95thPercentile)
aws.msk.kafka.controller.ControllerEventManager.98thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>98thPercentile)
aws.msk.kafka.controller.ControllerEventManager.999thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>999thPercentile)
aws.msk.kafka.controller.ControllerEventManager.99thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>99thPercentile)
aws.msk.kafka.controller.ControllerEventManager.Count
(gauge)
Attribute exposed for management (kafka.controller<>Count)
aws.msk.kafka.controller.ControllerEventManager.Count.count
(count)
Attribute exposed for management (kafka.controller<>Count) as monotonic count
aws.msk.kafka.controller.ControllerEventManager.Max
(gauge)
Attribute exposed for management (kafka.controller<>Max)
aws.msk.kafka.controller.ControllerEventManager.Mean
(gauge)
Attribute exposed for management (kafka.controller<>Mean)
aws.msk.kafka.controller.ControllerEventManager.Min
(gauge)
Attribute exposed for management (kafka.controller<>Min)
aws.msk.kafka.controller.ControllerEventManager.StdDev
(gauge)
Attribute exposed for management (kafka.controller<>StdDev)
aws.msk.kafka.controller.ControllerEventManager.Value
(gauge)
Attribute exposed for management (kafka.controller<>Value)
aws.msk.kafka.controller.ControllerStats.50thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>50thPercentile)
aws.msk.kafka.controller.ControllerStats.75thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>75thPercentile)
aws.msk.kafka.controller.ControllerStats.95thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>95thPercentile)
aws.msk.kafka.controller.ControllerStats.98thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>98thPercentile)
aws.msk.kafka.controller.ControllerStats.999thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>999thPercentile)
aws.msk.kafka.controller.ControllerStats.99thPercentile
(gauge)
Attribute exposed for management (kafka.controller<>99thPercentile)
aws.msk.kafka.controller.ControllerStats.Count
(gauge)
Attribute exposed for management (kafka.controller<>Count)
aws.msk.kafka.controller.ControllerStats.Count.count
(count)
Attribute exposed for management (kafka.controller<>Count) as monotonic count
aws.msk.kafka.controller.ControllerStats.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.controller<>FifteenMinuteRate)
aws.msk.kafka.controller.ControllerStats.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.controller<>FiveMinuteRate)
aws.msk.kafka.controller.ControllerStats.Max
(gauge)
Attribute exposed for management (kafka.controller<>Max)
aws.msk.kafka.controller.ControllerStats.Mean
(gauge)
Attribute exposed for management (kafka.controller<>Mean)
aws.msk.kafka.controller.ControllerStats.MeanRate
(gauge)
Attribute exposed for management (kafka.controller<>MeanRate)
aws.msk.kafka.controller.ControllerStats.Min
(gauge)
Attribute exposed for management (kafka.controller<>Min)
aws.msk.kafka.controller.ControllerStats.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.controller<>OneMinuteRate)
aws.msk.kafka.controller.ControllerStats.StdDev
(gauge)
Attribute exposed for management (kafka.controller<>StdDev)
aws.msk.kafka.controller.KafkaController.Value
(gauge)
Attribute exposed for management (kafka.controller<>Value)
aws.msk.kafka.coordinator.group.GroupMetadataManager.Value
(gauge)
Attribute exposed for management (kafka.coordinator.group<>Value)
aws.msk.kafka.coordinator.transaction.TransactionMarkerChannelManager.Value
(gauge)
Attribute exposed for management (kafka.coordinator.transaction<>Value)
aws.msk.kafka.log.Log.Value
(gauge)
Attribute exposed for management (kafka.log<>Value)
aws.msk.kafka.log.LogCleaner.Value
(gauge)
Attribute exposed for management (kafka.log<>Value)
aws.msk.kafka.log.LogCleanerManager.Value
(gauge)
Attribute exposed for management (kafka.log<>Value)
aws.msk.kafka.log.LogManager.Value
(gauge)
Attribute exposed for management (kafka.log<>Value)
aws.msk.kafka.network.Acceptor.Count
(gauge)
Attribute exposed for management (kafka.network<>Count)
aws.msk.kafka.network.Acceptor.Count.count
(count)
Attribute exposed for management (kafka.network<>Count) as monotonic count
aws.msk.kafka.network.Acceptor.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.network<>FifteenMinuteRate)
aws.msk.kafka.network.Acceptor.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.network<>FiveMinuteRate)
aws.msk.kafka.network.Acceptor.MeanRate
(gauge)
Attribute exposed for management (kafka.network<>MeanRate)
aws.msk.kafka.network.Acceptor.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.network<>OneMinuteRate)
aws.msk.kafka.network.Processor.Value
(gauge)
Attribute exposed for management (kafka.network<>Value)
aws.msk.kafka.network.RequestChannel.Value
(gauge)
Attribute exposed for management (kafka.network<>Value)
aws.msk.kafka.network.RequestMetrics.50thPercentile
(gauge)
Attribute exposed for management (kafka.network<>50thPercentile)
aws.msk.kafka.network.RequestMetrics.75thPercentile
(gauge)
Attribute exposed for management (kafka.network<>75thPercentile)
aws.msk.kafka.network.RequestMetrics.95thPercentile
(gauge)
Attribute exposed for management (kafka.network<>95thPercentile)
aws.msk.kafka.network.RequestMetrics.98thPercentile
(gauge)
Attribute exposed for management (kafka.network<>98thPercentile)
aws.msk.kafka.network.RequestMetrics.999thPercentile
(gauge)
Attribute exposed for management (kafka.network<>999thPercentile)
aws.msk.kafka.network.RequestMetrics.99thPercentile
(gauge)
Attribute exposed for management (kafka.network<>99thPercentile)
aws.msk.kafka.network.RequestMetrics.Count
(gauge)
Attribute exposed for management (kafka.network<>Count)
aws.msk.kafka.network.RequestMetrics.Count.count
(count)
Attribute exposed for management (kafka.network<>Count) as monotonic count
aws.msk.kafka.network.RequestMetrics.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.network<>FifteenMinuteRate)
aws.msk.kafka.network.RequestMetrics.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.network<>FiveMinuteRate)
aws.msk.kafka.network.RequestMetrics.Max
(gauge)
Attribute exposed for management (kafka.network<>Max)
aws.msk.kafka.network.RequestMetrics.Mean
(gauge)
Attribute exposed for management (kafka.network<>Mean)
aws.msk.kafka.network.RequestMetrics.MeanRate
(gauge)
Attribute exposed for management (kafka.network<>MeanRate)
aws.msk.kafka.network.RequestMetrics.Min
(gauge)
Attribute exposed for management (kafka.network<>Min)
aws.msk.kafka.network.RequestMetrics.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.network<>OneMinuteRate)
aws.msk.kafka.network.RequestMetrics.StdDev
(gauge)
Attribute exposed for management (kafka.network<>StdDev)
aws.msk.kafka.network.SocketServer.Value
(gauge)
Attribute exposed for management (kafka.network<>Value)
aws.msk.kafka.network.request.ErrorsPerSec
(gauge)

Shown as error
aws.msk.kafka.network.request.ErrorsPerSec.count
(count)
count version of aws.msk.kafka.network.request.ErrorsPerSec
Shown as error
aws.msk.kafka.network.request.LocalTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.LocalTimeMs.count
(count)
count version of aws.msk.kafka.network.request.LocalTimeMs
Shown as millisecond
aws.msk.kafka.network.request.MessageConversionsTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.MessageConversionsTimeMs.count
(count)
count version of aws.msk.kafka.network.request.MessageConversionsTimeMs
Shown as millisecond
aws.msk.kafka.network.request.RemoteTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.RemoteTimeMs.count
(count)
count version of aws.msk.kafka.network.request.RemoteTimeMs
Shown as millisecond
aws.msk.kafka.network.request.RequestBytes
(gauge)

Shown as byte
aws.msk.kafka.network.request.RequestBytes.count
(count)
count version of aws.msk.kafka.network.request.RequestBytes
Shown as byte
aws.msk.kafka.network.request.RequestQueueTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.RequestQueueTimeMs.count
(count)
count version of aws.msk.kafka.network.request.RequestQueueTimeMs
Shown as millisecond
aws.msk.kafka.network.request.RequestsPerSec
(gauge)

Shown as request
aws.msk.kafka.network.request.RequestsPerSec.count
(count)
count version of aws.msk.kafka.network.request.RequestsPerSec
Shown as request
aws.msk.kafka.network.request.ResponseQueueTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.ResponseQueueTimeMs.count
(count)
count version of aws.msk.kafka.network.request.ResponseQueueTimeMs
Shown as millisecond
aws.msk.kafka.network.request.ResponseSendTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.ResponseSendTimeMs.count
(count)
count version of aws.msk.kafka.network.request.ResponseSendTimeMs
Shown as millisecond
aws.msk.kafka.network.request.TemporaryMemoryBytes
(gauge)

Shown as byte
aws.msk.kafka.network.request.TemporaryMemoryBytes.count
(count)
count version of aws.msk.kafka.network.request.TemporaryMemoryBytes
Shown as byte
aws.msk.kafka.network.request.ThrottleTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.ThrottleTimeMs.count
(count)
count version of aws.msk.kafka.network.request.ThrottleTimeMs
Shown as millisecond
aws.msk.kafka.network.request.TotalTimeMs
(gauge)

Shown as millisecond
aws.msk.kafka.network.request.TotalTimeMs.count
(count)
count version of aws.msk.kafka.network.request.TotalTimeMs
Shown as millisecond
aws.msk.kafka.security.SimpleAclAuthorizer.Count
(gauge)
Attribute exposed for management (kafka.security<>Count)
aws.msk.kafka.security.SimpleAclAuthorizer.Count.count
(count)
Attribute exposed for management (kafka.security<>Count) as monotonic count
aws.msk.kafka.security.SimpleAclAuthorizer.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.security<>FifteenMinuteRate)
aws.msk.kafka.security.SimpleAclAuthorizer.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.security<>FiveMinuteRate)
aws.msk.kafka.security.SimpleAclAuthorizer.MeanRate
(gauge)
Attribute exposed for management (kafka.security<>MeanRate)
aws.msk.kafka.security.SimpleAclAuthorizer.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.security<>OneMinuteRate)
aws.msk.kafka.server.BrokerTopicMetrics.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.BrokerTopicMetrics.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.BrokerTopicMetrics.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.BrokerTopicMetrics.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.BrokerTopicMetrics.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.BrokerTopicMetrics.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.DelayedFetchMetrics.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.DelayedFetchMetrics.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.DelayedFetchMetrics.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.DelayedFetchMetrics.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.DelayedFetchMetrics.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.DelayedFetchMetrics.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.DelayedOperationPurgatory.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.Fetch.queue.size
(gauge)
Tracks the size of the delay queue (kafka.server<>queue-size)
aws.msk.kafka.server.FetchSessionCache.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.FetchSessionCache.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.FetchSessionCache.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.FetchSessionCache.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.FetchSessionCache.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.FetchSessionCache.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.FetchSessionCache.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.FetcherLagMetrics.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.FetcherStats.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.FetcherStats.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.FetcherStats.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.FetcherStats.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.FetcherStats.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.FetcherStats.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.KafkaRequestHandlerPool.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.KafkaRequestHandlerPool.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.KafkaRequestHandlerPool.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.KafkaRequestHandlerPool.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.KafkaRequestHandlerPool.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.KafkaRequestHandlerPool.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.KafkaServer.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.LeaderReplication.byte.rate
(gauge)
Tracking byte-rate for LeaderReplication (kafka.server<>byte-rate)
aws.msk.kafka.server.Produce.queue.size
(gauge)
Tracks the size of the delay queue (kafka.server<>queue-size)
aws.msk.kafka.server.ReplicaAlterLogDirsManager.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.ReplicaFetcherManager.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.ReplicaManager.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.ReplicaManager.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.ReplicaManager.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.ReplicaManager.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.ReplicaManager.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.ReplicaManager.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.ReplicaManager.Value
(gauge)
Attribute exposed for management (kafka.server<>Value)
aws.msk.kafka.server.ReplicaManager.Value.count
(count)
Attribute exposed for management (kafka.server<>Value) as monotonic count
aws.msk.kafka.server.Request.queue.size
(gauge)
Tracks the size of the delay queue (kafka.server<>queue-size)
aws.msk.kafka.server.SessionExpireListener.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.SessionExpireListener.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.SessionExpireListener.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FifteenMinuteRate)
aws.msk.kafka.server.SessionExpireListener.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>FiveMinuteRate)
aws.msk.kafka.server.SessionExpireListener.MeanRate
(gauge)
Attribute exposed for management (kafka.server<>MeanRate)
aws.msk.kafka.server.SessionExpireListener.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.server<>OneMinuteRate)
aws.msk.kafka.server.ZooKeeperClientMetrics.50thPercentile
(gauge)
Attribute exposed for management (kafka.server<>50thPercentile)
aws.msk.kafka.server.ZooKeeperClientMetrics.75thPercentile
(gauge)
Attribute exposed for management (kafka.server<>75thPercentile)
aws.msk.kafka.server.ZooKeeperClientMetrics.95thPercentile
(gauge)
Attribute exposed for management (kafka.server<>95thPercentile)
aws.msk.kafka.server.ZooKeeperClientMetrics.98thPercentile
(gauge)
Attribute exposed for management (kafka.server<>98thPercentile)
aws.msk.kafka.server.ZooKeeperClientMetrics.999thPercentile
(gauge)
Attribute exposed for management (kafka.server<>999thPercentile)
aws.msk.kafka.server.ZooKeeperClientMetrics.99thPercentile
(gauge)
Attribute exposed for management (kafka.server<>99thPercentile)
aws.msk.kafka.server.ZooKeeperClientMetrics.Count
(gauge)
Attribute exposed for management (kafka.server<>Count)
aws.msk.kafka.server.ZooKeeperClientMetrics.Count.count
(count)
Attribute exposed for management (kafka.server<>Count) as monotonic count
aws.msk.kafka.server.ZooKeeperClientMetrics.Max
(gauge)
Attribute exposed for management (kafka.server<>Max)
aws.msk.kafka.server.ZooKeeperClientMetrics.Mean
(gauge)
Attribute exposed for management (kafka.server<>Mean)
aws.msk.kafka.server.ZooKeeperClientMetrics.Min
(gauge)
Attribute exposed for management (kafka.server<>Min)
aws.msk.kafka.server.ZooKeeperClientMetrics.StdDev
(gauge)
Attribute exposed for management (kafka.server<>StdDev)
aws.msk.kafka.server.broker_topics.BytesInPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.BytesInPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.BytesInPerSec
Shown as byte
aws.msk.kafka.server.broker_topics.BytesOutPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.BytesOutPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.BytesOutPerSec
Shown as byte
aws.msk.kafka.server.broker_topics.BytesRejectedPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.BytesRejectedPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.BytesRejectedPerSec
Shown as byte
aws.msk.kafka.server.broker_topics.FailedFetchRequestsPerSec
(gauge)

Shown as request
aws.msk.kafka.server.broker_topics.FailedFetchRequestsPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.FailedFetchRequestsPerSec
Shown as request
aws.msk.kafka.server.broker_topics.FailedProduceRequestsPerSec
(gauge)

Shown as request
aws.msk.kafka.server.broker_topics.FailedProduceRequestsPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.FailedProduceRequestsPerSec
Shown as request
aws.msk.kafka.server.broker_topics.FetchMessageConversionsPerSec
(gauge)
aws.msk.kafka.server.broker_topics.FetchMessageConversionsPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.FetchMessageConversionsPerSec
aws.msk.kafka.server.broker_topics.MessagesInPerSec
(gauge)

Shown as message
aws.msk.kafka.server.broker_topics.MessagesInPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.MessagesInPerSec
Shown as message
aws.msk.kafka.server.broker_topics.ProduceMessageConversionsPerSec
(gauge)
aws.msk.kafka.server.broker_topics.ProduceMessageConversionsPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.ProduceMessageConversionsPerSec
aws.msk.kafka.server.broker_topics.ReplicationBytesInPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.ReplicationBytesInPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.ReplicationBytesInPerSec
Shown as byte
aws.msk.kafka.server.broker_topics.ReplicationBytesOutPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.ReplicationBytesOutPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.ReplicationBytesOutPerSec
Shown as byte
aws.msk.kafka.server.broker_topics.TotalFetchRequestsPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.TotalFetchRequestsPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.TotalFetchRequestsPerSec
Shown as byte
aws.msk.kafka.server.broker_topics.TotalProduceRequestsPerSec
(gauge)

Shown as byte
aws.msk.kafka.server.broker_topics.TotalProduceRequestsPerSec.count
(count)
count version of aws.msk.kafka.server.broker_topics.TotalProduceRequestsPerSec
Shown as byte
aws.msk.kafka.server.controller.channel.metrics.connection.close.rate
(gauge)
The number of connections closed per second (kafka.server<>connection-close-rate)
Shown as connection
aws.msk.kafka.server.controller.channel.metrics.connection.close.total
(gauge)
The total number of connections closed (kafka.server<>connection-close-total)
Shown as connection
aws.msk.kafka.server.controller.channel.metrics.connection.count
(gauge)
The current number of active connections. (kafka.server<>connection-count)
Shown as connection
aws.msk.kafka.server.controller.channel.metrics.connection.creation.rate
(gauge)
The number of new connections established per second (kafka.server<>connection-creation-rate)
aws.msk.kafka.server.controller.channel.metrics.connection.creation.total
(gauge)
The total number of new connections established (kafka.server<>connection-creation-total)
aws.msk.kafka.server.controller.channel.metrics.failed.authentication.rate
(gauge)
The number of connections with failed authentication per second (kafka.server<>failed-authentication-rate)
aws.msk.kafka.server.controller.channel.metrics.failed.authentication.total
(gauge)
The total number of connections with failed authentication (kafka.server<>failed-authentication-total)
aws.msk.kafka.server.controller.channel.metrics.failed.reauthentication.rate
(gauge)
The number of failed re-authentication of connections per second (kafka.server<>failed-reauthentication-rate)
aws.msk.kafka.server.controller.channel.metrics.failed.reauthentication.total
(gauge)
The total number of failed re-authentication of connections (kafka.server<>failed-reauthentication-total)
aws.msk.kafka.server.controller.channel.metrics.incoming.byte.rate
(gauge)
The number of bytes read off all sockets per second (kafka.server<>incoming-byte-rate)
Shown as byte
aws.msk.kafka.server.controller.channel.metrics.incoming.byte.total
(gauge)
The total number of bytes read off all sockets (kafka.server<>incoming-byte-total)
Shown as byte
aws.msk.kafka.server.controller.channel.metrics.io.ratio
(gauge)
The fraction of time the I/O thread spent doing I/O (kafka.server<>io-ratio)
aws.msk.kafka.server.controller.channel.metrics.io.time.ns.avg
(gauge)
The average length of time for I/O per select call in nanoseconds. (kafka.server<>io-time-ns-avg)
aws.msk.kafka.server.controller.channel.metrics.io.wait.ratio
(gauge)
The fraction of time the I/O thread spent waiting (kafka.server<>io-wait-ratio)
aws.msk.kafka.server.controller.channel.metrics.io.wait.time.ns.avg
(gauge)
The average length of time the I/O thread spent waiting for a socket ready for reads or writes in nanoseconds. (kafka.server<>io-wait-time-ns-avg)
aws.msk.kafka.server.controller.channel.metrics.io.waittime.total
(gauge)
The total time the I/O thread spent waiting (kafka.server<>io-waittime-total)
aws.msk.kafka.server.controller.channel.metrics.iotime.total
(gauge)
The total time the I/O thread spent doing I/O (kafka.server<>iotime-total)
aws.msk.kafka.server.controller.channel.metrics.network.io.rate
(gauge)
The number of network operations (reads or writes) on all connections per second (kafka.server<>network-io-rate)
aws.msk.kafka.server.controller.channel.metrics.network.io.total
(gauge)
The total number of network operations (reads or writes) on all connections (kafka.server<>network-io-total)
aws.msk.kafka.server.controller.channel.metrics.outgoing.byte.rate
(gauge)
The number of outgoing bytes sent to all servers per second (kafka.server<>outgoing-byte-rate)
Shown as byte
aws.msk.kafka.server.controller.channel.metrics.outgoing.byte.total
(gauge)
The total number of outgoing bytes sent to all servers (kafka.server<>outgoing-byte-total)
Shown as byte
aws.msk.kafka.server.controller.channel.metrics.reauthentication.latency.avg
(gauge)
The average latency observed due to re-authentication (kafka.server<>reauthentication-latency-avg)
aws.msk.kafka.server.controller.channel.metrics.reauthentication.latency.max
(gauge)
The max latency observed due to re-authentication (kafka.server<>reauthentication-latency-max)
aws.msk.kafka.server.controller.channel.metrics.request.rate
(gauge)
The number of requests sent per second (kafka.server<>request-rate)
aws.msk.kafka.server.controller.channel.metrics.request.size.avg
(gauge)
The average size of requests sent. (kafka.server<>request-size-avg)
aws.msk.kafka.server.controller.channel.metrics.request.size.max
(gauge)
The maximum size of any request sent. (kafka.server<>request-size-max)
aws.msk.kafka.server.controller.channel.metrics.request.total
(gauge)
The total number of requests sent (kafka.server<>request-total)
aws.msk.kafka.server.controller.channel.metrics.response.rate
(gauge)
The number of responses received per second (kafka.server<>response-rate)
aws.msk.kafka.server.controller.channel.metrics.response.total
(gauge)
The total number of responses received (kafka.server<>response-total)
aws.msk.kafka.server.controller.channel.metrics.select.rate
(gauge)
The number of times the I/O layer checked for new I/O to perform per second (kafka.server<>select-rate)
aws.msk.kafka.server.controller.channel.metrics.select.total
(gauge)
The total number of times the I/O layer checked for new I/O to perform (kafka.server<>select-total)
aws.msk.kafka.server.controller.channel.metrics.successful.authentication.no.reauth.total
(gauge)
The total number of connections with successful authentication where the client does not support re-authentication (kafka.server<>successful-authentication-no-reauth-total)
aws.msk.kafka.server.controller.channel.metrics.successful.authentication.rate
(gauge)
The number of connections with successful authentication per second (kafka.server<>successful-authentication-rate)
aws.msk.kafka.server.controller.channel.metrics.successful.authentication.total
(gauge)
The total number of connections with successful authentication (kafka.server<>successful-authentication-total)
aws.msk.kafka.server.controller.channel.metrics.successful.reauthentication.rate
(gauge)
The number of successful re-authentication of connections per second (kafka.server<>successful-reauthentication-rate)
aws.msk.kafka.server.controller.channel.metrics.successful.reauthentication.total
(gauge)
The total number of successful re-authentication of connections (kafka.server<>successful-reauthentication-total)
aws.msk.kafka.server.kafka.metrics.count.count
(gauge)
total number of registered metrics (kafka.server<>count)
aws.msk.kafka.server.replica.fetcher.metrics.connection.close.rate
(gauge)
The number of connections closed per second (kafka.server<>connection-close-rate)
aws.msk.kafka.server.replica.fetcher.metrics.connection.close.total
(gauge)
The total number of connections closed (kafka.server<>connection-close-total)
aws.msk.kafka.server.replica.fetcher.metrics.connection.count
(gauge)
The current number of active connections. (kafka.server<>connection-count)
aws.msk.kafka.server.replica.fetcher.metrics.connection.creation.rate
(gauge)
The number of new connections established per second (kafka.server<>connection-creation-rate)
aws.msk.kafka.server.replica.fetcher.metrics.connection.creation.total
(gauge)
The total number of new connections established (kafka.server<>connection-creation-total)
aws.msk.kafka.server.replica.fetcher.metrics.failed.authentication.rate
(gauge)
The number of connections with failed authentication per second (kafka.server<>failed-authentication-rate)
aws.msk.kafka.server.replica.fetcher.metrics.failed.authentication.total
(gauge)
The total number of connections with failed authentication (kafka.server<>failed-authentication-total)
aws.msk.kafka.server.replica.fetcher.metrics.incoming.byte.rate
(gauge)
The number of bytes read off all sockets per second (kafka.server<>incoming-byte-rate)
Shown as byte
aws.msk.kafka.server.replica.fetcher.metrics.incoming.byte.total
(gauge)
The total number of bytes read off all sockets (kafka.server<>incoming-byte-total)
Shown as byte
aws.msk.kafka.server.replica.fetcher.metrics.io.ratio
(gauge)
The fraction of time the I/O thread spent doing I/O (kafka.server<>io-ratio)
aws.msk.kafka.server.replica.fetcher.metrics.io.time.ns.avg
(gauge)
The average length of time for I/O per select call in nanoseconds. (kafka.server<>io-time-ns-avg)
aws.msk.kafka.server.replica.fetcher.metrics.io.wait.ratio
(gauge)
The fraction of time the I/O thread spent waiting (kafka.server<>io-wait-ratio)
aws.msk.kafka.server.replica.fetcher.metrics.io.wait.time.ns.avg
(gauge)
The average length of time the I/O thread spent waiting for a socket ready for reads or writes in nanoseconds. (kafka.server<>io-wait-time-ns-avg)
aws.msk.kafka.server.replica.fetcher.metrics.io.waittime.total
(gauge)
The total time the I/O thread spent waiting (kafka.server<>io-waittime-total)
aws.msk.kafka.server.replica.fetcher.metrics.iotime.total
(gauge)
The total time the I/O thread spent doing I/O (kafka.server<>iotime-total)
aws.msk.kafka.server.replica.fetcher.metrics.network.io.rate
(gauge)
The number of network operations (reads or writes) on all connections per second (kafka.server<>network-io-rate)
aws.msk.kafka.server.replica.fetcher.metrics.network.io.total
(gauge)
The total number of network operations (reads or writes) on all connections (kafka.server<>network-io-total)
aws.msk.kafka.server.replica.fetcher.metrics.outgoing.byte.rate
(gauge)
The number of outgoing bytes sent to all servers per second (kafka.server<>outgoing-byte-rate)
Shown as byte
aws.msk.kafka.server.replica.fetcher.metrics.outgoing.byte.total
(gauge)
The total number of outgoing bytes sent to all servers (kafka.server<>outgoing-byte-total)
Shown as byte
aws.msk.kafka.server.replica.fetcher.metrics.request.rate
(gauge)
The number of requests sent per second (kafka.server<>request-rate)
aws.msk.kafka.server.replica.fetcher.metrics.request.size.avg
(gauge)
The average size of requests sent. (kafka.server<>request-size-avg)
aws.msk.kafka.server.replica.fetcher.metrics.request.size.max
(gauge)
The maximum size of any request sent. (kafka.server<>request-size-max)
aws.msk.kafka.server.replica.fetcher.metrics.request.total
(gauge)
The total number of requests sent (kafka.server<>request-total)
aws.msk.kafka.server.replica.fetcher.metrics.response.rate
(gauge)
The number of responses received per second (kafka.server<>response-rate)
aws.msk.kafka.server.replica.fetcher.metrics.response.total
(gauge)
The total number of responses received (kafka.server<>response-total)
aws.msk.kafka.server.replica.fetcher.metrics.select.rate
(gauge)
The number of times the I/O layer checked for new I/O to perform per second (kafka.server<>select-rate)
aws.msk.kafka.server.replica.fetcher.metrics.select.total
(gauge)
The total number of times the I/O layer checked for new I/O to perform (kafka.server<>select-total)
aws.msk.kafka.server.replica.fetcher.metrics.successful.authentication.rate
(gauge)
The number of connections with successful authentication per second (kafka.server<>successful-authentication-rate)
aws.msk.kafka.server.replica.fetcher.metrics.successful.authentication.total
(gauge)
The total number of connections with successful authentication (kafka.server<>successful-authentication-total)
aws.msk.kafka.server.replica_manager.LeaderCount
(gauge)
aws.msk.kafka.server.replica_manager.LeaderCount.count
(count)
count version of aws.msk.kafka.server.replica_manager.LeaderCount
aws.msk.kafka.server.replica_manager.OfflineReplicaCount
(gauge)
aws.msk.kafka.server.replica_manager.OfflineReplicaCount.count
(count)
count version of aws.msk.kafka.server.replica_manager.OfflineReplicaCount
aws.msk.kafka.server.replica_manager.PartitionCount
(gauge)
aws.msk.kafka.server.replica_manager.PartitionCount.count
(count)
count version of aws.msk.kafka.server.replica_manager.PartitionCount
aws.msk.kafka.server.replica_manager.UnderMinIsrPartitionCount
(gauge)
aws.msk.kafka.server.replica_manager.UnderMinIsrPartitionCount.count
(count)
count version of aws.msk.kafka.server.replicamanager.UnderMinIsrPartitionCountcount version of aws.msk.kafka.server.replicamanager.UnderMinIsrPartitionCount
aws.msk.kafka.server.replica_manager.UnderReplicatedPartitions
(gauge)
aws.msk.kafka.server.replica_manager.UnderReplicatedPartitions.count
(count)
count version of aws.msk.kafka.server.replica_manager.UnderReplicatedPartitions
aws.msk.kafka.server.socket.server.metrics.MemoryPoolAvgDepletedPercent
(gauge)
(kafka.server<>MemoryPoolAvgDepletedPercent)
aws.msk.kafka.server.socket.server.metrics.MemoryPoolDepletedTimeTotal
(gauge)
(kafka.server<>MemoryPoolDepletedTimeTotal)
aws.msk.kafka.server.socket.server.metrics.connection.close.rate
(gauge)
The number of connections closed per second (kafka.server<>connection-close-rate)
aws.msk.kafka.server.socket.server.metrics.connection.close.total
(gauge)
The total number of connections closed (kafka.server<>connection-close-total)
aws.msk.kafka.server.socket.server.metrics.connection.count
(gauge)
The current number of active connections. (kafka.server<>connection-count)
aws.msk.kafka.server.socket.server.metrics.connection.creation.rate
(gauge)
The number of new connections established per second (kafka.server<>connection-creation-rate)
aws.msk.kafka.server.socket.server.metrics.connection.creation.total
(gauge)
The total number of new connections established (kafka.server<>connection-creation-total)
aws.msk.kafka.server.socket.server.metrics.expired.connections.killed.count
(gauge)
(kafka.server<>expired-connections-killed-count)
aws.msk.kafka.server.socket.server.metrics.failed.authentication.rate
(gauge)
The number of connections with failed authentication per second (kafka.server<>failed-authentication-rate)
aws.msk.kafka.server.socket.server.metrics.failed.authentication.total
(gauge)
The total number of connections with failed authentication (kafka.server<>failed-authentication-total)
aws.msk.kafka.server.socket.server.metrics.failed.reauthentication.rate
(gauge)
The number of failed re-authentication of connections per second (kafka.server<>failed-reauthentication-rate)
aws.msk.kafka.server.socket.server.metrics.failed.reauthentication.total
(gauge)
The total number of failed re-authentication of connections (kafka.server<>failed-reauthentication-total)
aws.msk.kafka.server.socket.server.metrics.incoming.byte.rate
(gauge)
The number of bytes read off all sockets per second (kafka.server<>incoming-byte-rate)
aws.msk.kafka.server.socket.server.metrics.incoming.byte.total
(gauge)
The total number of bytes read off all sockets (kafka.server<>incoming-byte-total)
aws.msk.kafka.server.socket.server.metrics.io.ratio
(gauge)
The fraction of time the I/O thread spent doing I/O (kafka.server<>io-ratio)
aws.msk.kafka.server.socket.server.metrics.io.time.ns.avg
(gauge)
The average length of time for I/O per select call in nanoseconds. (kafka.server<>io-time-ns-avg)
aws.msk.kafka.server.socket.server.metrics.io.wait.ratio
(gauge)
The fraction of time the I/O thread spent waiting (kafka.server<>io-wait-ratio)
aws.msk.kafka.server.socket.server.metrics.io.wait.time.ns.avg
(gauge)
The average length of time the I/O thread spent waiting for a socket ready for reads or writes in nanoseconds. (kafka.server<>io-wait-time-ns-avg)
aws.msk.kafka.server.socket.server.metrics.io.waittime.total
(gauge)
The total time the I/O thread spent waiting (kafka.server<>io-waittime-total)
aws.msk.kafka.server.socket.server.metrics.iotime.total
(gauge)
The total time the I/O thread spent doing I/O (kafka.server<>iotime-total)
aws.msk.kafka.server.socket.server.metrics.network.io.rate
(gauge)
The number of network operations (reads or writes) on all connections per second (kafka.server<>network-io-rate)
aws.msk.kafka.server.socket.server.metrics.network.io.total
(gauge)
The total number of network operations (reads or writes) on all connections (kafka.server<>network-io-total)
aws.msk.kafka.server.socket.server.metrics.outgoing.byte.rate
(gauge)
The number of outgoing bytes sent to all servers per second (kafka.server<>outgoing-byte-rate)
aws.msk.kafka.server.socket.server.metrics.outgoing.byte.total
(gauge)
The total number of outgoing bytes sent to all servers (kafka.server<>outgoing-byte-total)
aws.msk.kafka.server.socket.server.metrics.reauthentication.latency.avg
(gauge)
The average latency observed due to re-authentication (kafka.server<>reauthentication-latency-avg)
aws.msk.kafka.server.socket.server.metrics.reauthentication.latency.max
(gauge)
The max latency observed due to re-authentication (kafka.server<>reauthentication-latency-max)
aws.msk.kafka.server.socket.server.metrics.request.rate
(gauge)
The number of requests sent per second (kafka.server<>request-rate)
aws.msk.kafka.server.socket.server.metrics.request.size.avg
(gauge)
The average size of requests sent. (kafka.server<>request-size-avg)
aws.msk.kafka.server.socket.server.metrics.request.size.max
(gauge)
The maximum size of any request sent. (kafka.server<>request-size-max)
aws.msk.kafka.server.socket.server.metrics.request.total
(gauge)
The total number of requests sent (kafka.server<>request-total)
aws.msk.kafka.server.socket.server.metrics.response.rate
(gauge)
The number of responses received per second (kafka.server<>response-rate)
aws.msk.kafka.server.socket.server.metrics.response.total
(gauge)
The total number of responses received (kafka.server<>response-total)
aws.msk.kafka.server.socket.server.metrics.select.rate
(gauge)
The number of times the I/O layer checked for new I/O to perform per second (kafka.server<>select-rate)
aws.msk.kafka.server.socket.server.metrics.select.total
(gauge)
The total number of times the I/O layer checked for new I/O to perform (kafka.server<>select-total)
aws.msk.kafka.server.socket.server.metrics.successful.authentication.no.reauth.total
(gauge)
The total number of connections with successful authentication where the client does not support re-authentication (kafka.server<>successful-authentication-no-reauth-total)
aws.msk.kafka.server.socket.server.metrics.successful.authentication.rate
(gauge)
The number of connections with successful authentication per second (kafka.server<>successful-authentication-rate)
aws.msk.kafka.server.socket.server.metrics.successful.authentication.total
(gauge)
The total number of connections with successful authentication (kafka.server<>successful-authentication-total)
aws.msk.kafka.server.socket.server.metrics.successful.reauthentication.rate
(gauge)
The number of successful re-authentication of connections per second (kafka.server<>successful-reauthentication-rate)
aws.msk.kafka.server.socket.server.metrics.successful.reauthentication.total
(gauge)
The total number of successful re-authentication of connections (kafka.server<>successful-reauthentication-total)
aws.msk.kafka.server.txn.marker.channel.metrics.connection.close.rate
(gauge)
The number of connections closed per second (kafka.server<>connection-close-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.connection.close.total
(gauge)
The total number of connections closed (kafka.server<>connection-close-total)
aws.msk.kafka.server.txn.marker.channel.metrics.connection.count
(gauge)
The current number of active connections. (kafka.server<>connection-count)
aws.msk.kafka.server.txn.marker.channel.metrics.connection.creation.rate
(gauge)
The number of new connections established per second (kafka.server<>connection-creation-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.connection.creation.total
(gauge)
The total number of new connections established (kafka.server<>connection-creation-total)
aws.msk.kafka.server.txn.marker.channel.metrics.failed.authentication.rate
(gauge)
The number of connections with failed authentication per second (kafka.server<>failed-authentication-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.failed.authentication.total
(gauge)
The total number of connections with failed authentication (kafka.server<>failed-authentication-total)
aws.msk.kafka.server.txn.marker.channel.metrics.failed.reauthentication.rate
(gauge)
The number of failed re-authentication of connections per second (kafka.server<>failed-reauthentication-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.failed.reauthentication.total
(gauge)
The total number of failed re-authentication of connections (kafka.server<>failed-reauthentication-total)
aws.msk.kafka.server.txn.marker.channel.metrics.incoming.byte.rate
(gauge)
The number of bytes read off all sockets per second (kafka.server<>incoming-byte-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.incoming.byte.total
(gauge)
The total number of bytes read off all sockets (kafka.server<>incoming-byte-total)
aws.msk.kafka.server.txn.marker.channel.metrics.io.ratio
(gauge)
The fraction of time the I/O thread spent doing I/O (kafka.server<>io-ratio)
aws.msk.kafka.server.txn.marker.channel.metrics.io.time.ns.avg
(gauge)
The average length of time for I/O per select call in nanoseconds. (kafka.server<>io-time-ns-avg)
aws.msk.kafka.server.txn.marker.channel.metrics.io.wait.ratio
(gauge)
The fraction of time the I/O thread spent waiting (kafka.server<>io-wait-ratio)
aws.msk.kafka.server.txn.marker.channel.metrics.io.wait.time.ns.avg
(gauge)
The average length of time the I/O thread spent waiting for a socket ready for reads or writes in nanoseconds. (kafka.server<>io-wait-time-ns-avg)
aws.msk.kafka.server.txn.marker.channel.metrics.io.waittime.total
(gauge)
The total time the I/O thread spent waiting (kafka.server<>io-waittime-total)
aws.msk.kafka.server.txn.marker.channel.metrics.iotime.total
(gauge)
The total time the I/O thread spent doing I/O (kafka.server<>iotime-total)
aws.msk.kafka.server.txn.marker.channel.metrics.network.io.rate
(gauge)
The number of network operations (reads or writes) on all connections per second (kafka.server<>network-io-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.network.io.total
(gauge)
The total number of network operations (reads or writes) on all connections (kafka.server<>network-io-total)
aws.msk.kafka.server.txn.marker.channel.metrics.outgoing.byte.rate
(gauge)
The number of outgoing bytes sent to all servers per second (kafka.server<>outgoing-byte-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.outgoing.byte.total
(gauge)
The total number of outgoing bytes sent to all servers (kafka.server<>outgoing-byte-total)
aws.msk.kafka.server.txn.marker.channel.metrics.reauthentication.latency.avg
(gauge)
The average latency observed due to re-authentication (kafka.server<>reauthentication-latency-avg)
aws.msk.kafka.server.txn.marker.channel.metrics.reauthentication.latency.max
(gauge)
The max latency observed due to re-authentication (kafka.server<>reauthentication-latency-max)
aws.msk.kafka.server.txn.marker.channel.metrics.request.rate
(gauge)
The number of requests sent per second (kafka.server<>request-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.request.size.avg
(gauge)
The average size of requests sent. (kafka.server<>request-size-avg)
aws.msk.kafka.server.txn.marker.channel.metrics.request.size.max
(gauge)
The maximum size of any request sent. (kafka.server<>request-size-max)
aws.msk.kafka.server.txn.marker.channel.metrics.request.total
(gauge)
The total number of requests sent (kafka.server<>request-total)
aws.msk.kafka.server.txn.marker.channel.metrics.response.rate
(gauge)
The number of responses received per second (kafka.server<>response-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.response.total
(gauge)
The total number of responses received (kafka.server<>response-total)
aws.msk.kafka.server.txn.marker.channel.metrics.select.rate
(gauge)
The number of times the I/O layer checked for new I/O to perform per second (kafka.server<>select-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.select.total
(gauge)
The total number of times the I/O layer checked for new I/O to perform (kafka.server<>select-total)
aws.msk.kafka.server.txn.marker.channel.metrics.successful.authentication.no.reauth.total
(gauge)
The total number of connections with successful authentication where the client does not support re-authentication (kafka.server<>successful-authentication-no-reauth-total)
aws.msk.kafka.server.txn.marker.channel.metrics.successful.authentication.rate
(gauge)
The number of connections with successful authentication per second (kafka.server<>successful-authentication-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.successful.authentication.total
(gauge)
The total number of connections with successful authentication (kafka.server<>successful-authentication-total)
aws.msk.kafka.server.txn.marker.channel.metrics.successful.reauthentication.rate
(gauge)
The number of successful re-authentication of connections per second (kafka.server<>successful-reauthentication-rate)
aws.msk.kafka.server.txn.marker.channel.metrics.successful.reauthentication.total
(gauge)
The total number of successful re-authentication of connections (kafka.server<>successful-reauthentication-total)
aws.msk.kafka.utils.Throttler.Count
(gauge)
Attribute exposed for management (kafka.utils<>Count)
aws.msk.kafka.utils.Throttler.Count.count
(count)
Attribute exposed for management (kafka.utils<>Count) as monotonic count
aws.msk.kafka.utils.Throttler.FifteenMinuteRate
(gauge)
Attribute exposed for management (kafka.utils<>FifteenMinuteRate)
aws.msk.kafka.utils.Throttler.FiveMinuteRate
(gauge)
Attribute exposed for management (kafka.utils<>FiveMinuteRate)
aws.msk.kafka.utils.Throttler.MeanRate
(gauge)
Attribute exposed for management (kafka.utils<>MeanRate)
aws.msk.kafka.utils.Throttler.OneMinuteRate
(gauge)
Attribute exposed for management (kafka.utils<>OneMinuteRate)
aws.msk.node.cpu.seconds.count
(count)
[OpenMetricsV2] Seconds the cpus spent in each mode.
aws.msk.node.cpu.seconds.total
(count)
[OpenMetricsV1] Seconds the cpus spent in each mode.
aws.msk.node.exporter.build.info
(gauge)
A metric with a constant '1' value labeled by version, revision, branch, and goversion from which node_exporter was built.
aws.msk.node.filesystem.avail.bytes
(gauge)
Filesystem space available to non-root users in bytes.
Shown as byte
aws.msk.node.filesystem.device.error
(gauge)
Whether an error occurred while getting statistics for the given device.
aws.msk.node.filesystem.files
(gauge)
Filesystem total file nodes.
aws.msk.node.filesystem.files.free
(gauge)
Filesystem total free file nodes.
aws.msk.node.filesystem.free.bytes
(gauge)
Filesystem free space in bytes.
Shown as byte
aws.msk.node.filesystem.readonly
(gauge)
Filesystem read-only status.
aws.msk.node.filesystem.size.bytes
(gauge)
Filesystem size in bytes.
Shown as byte
aws.msk.node.scrape.collector.duration.seconds
(gauge)
node_exporter: Duration of a collector scrape.
Shown as second
aws.msk.node.scrape.collector.success
(gauge)
node_exporter: Whether a collector succeeded.
aws.msk.process.cpu.seconds.count
(count)
[OpenMetricsV2] Total user and system CPU time spent in seconds.
aws.msk.process.cpu.seconds.total
(count)
[OpenMetricsV1] Total user and system CPU time spent in seconds.
aws.msk.process.max.fds
(gauge)
Maximum number of open file descriptors.
aws.msk.process.open.fds
(gauge)
Number of open file descriptors.
aws.msk.process.resident.memory.bytes
(gauge)
Resident memory size in bytes.
Shown as byte
aws.msk.process.start.time.seconds
(gauge)
Start time of the process since unix epoch in seconds.
Shown as second
aws.msk.process.virtual.memory.bytes
(gauge)
Virtual memory size in bytes.
Shown as byte
aws.msk.process.virtual.memory.max.bytes
(gauge)
Maximum amount of virtual memory available in bytes.
Shown as byte
aws.msk.promhttp.metric.handler.requests.count
(count)
[OpenMetricsV2] Total number of scrapes by HTTP status code.
aws.msk.promhttp.metric.handler.requests.in.flight
(gauge)
Current number of scrapes being served.
aws.msk.promhttp.metric.handler.requests.total
(count)
[OpenMetricsV1] Total number of scrapes by HTTP status code.

Events

The Amazon MSK check does not include any events.

Service Checks

aws.msk.can_connect
Returns CRITICAL if the Agent is unable to discover nodes of the MSK cluster. Otherwise, returns OK.
Statuses: ok, critical

aws.msk.prometheus.health
Returns CRITICAL if the check cannot access a Metrics endpoint. Otherwise, returns OK.
Statuses: ok, critical

aws.msk.openmetrics.health
Returns CRITICAL if the Agent is unable to connect to the OpenMetrics endpoint, otherwise returns OK.
Statuses: ok, critical

Troubleshooting

Need help? Contact Datadog support.

Further Reading

Additional helpful documentation, links, and articles:

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers