Microsoft Azure Network Interface

Overview

Azure Network Interface enables an Azure Virtual Machine to communicate with internet, Azure, and on-premises resources.

Use the Datadog Azure integration to collect metrics from Azure Network Interface.

Setup

Installation

If you haven’t already, set up the Microsoft Azure integration first. There are no other installation steps.

Data Collected

Metrics

azure.network_networkinterfaces.bytes_received_rate
(count)
Number of bytes the Network Interface received.
Shown as byte
azure.network_networkinterfaces.bytes_sent_rate
(count)
Number of bytes the Network Interface sent.
Shown as byte
azure.network_networkinterfaces.packets_received_rate
(count)
Number of packets the Network Interface received.
Shown as packet
azure.network_networkinterfaces.packets_sent_rate
(count)
Number of packets the Network Interface sent.
Shown as packet
azure.network_networkinterfaces.count
(gauge)
The count of all Azure Network Interface resources.

Events

The Azure Network Interface integration does not include any events.

Service Checks

The Azure Network Interface integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers