Azure Usage and Quotas

Overview

Azure places preconfigured limits on resources for your subscription. To avoid unexpected provisioning failures, keep these limits in mind as you design and scale your Azure environment. Get metrics from Azure Usage and Quotas to:

  • Visualize utilization of computer, network, and storage resources against your quota.
  • Understand and prevent provisioning failures from hitting quota limits.

Setup

Installation

If you haven’t already, set up the Microsoft Azure integration first. There are no other installation steps that need to be performed.

Data Collected

Metrics

azure.usage.limit
(gauge)
Limit of your Azure Quota.
azure.usage.current_value
(gauge)
Current usage against your defined Azure quota.
azure.usage.percentage
(gauge)
Current percentage of quota used.
Shown as percent
azure.usage.remaining_api_calls
(gauge)
API calls remaining for a resource provider scoped to a region.

Events

The Azure Quota integration does not include any events.

Service Checks

The Azure Quota integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers