Integration Backup and Restore Tool

Supported OS Linux Windows Mac OS

marketplace
Integration version1.0.1

Overview

Take your Datadog experience to the next level with the Integration Backup and Restore Tool (IBRT). This powerful tool helps you streamline your workflow by allowing you to easily create backups of your Datadog configuration, ensuring that you can quickly restore your setup after Agent upgrades or migrations.

Features

  • Creates a complete backup of your Datadog configuration, including:
    • Integrations
    • Dependencies
    • Configuration files (for example, integrations’ datadog.yaml and conf.yaml files)
  • Supports multiple backup locations, allowing you to store your backups in the locations that best suit your needs
  • Flexible backup scheduling:
    • Run on-demand backups as needed
    • Schedule periodic backups to run automatically, based on your specific requirements
  • Provides options during restoration:
    1. Agent migration or reinstallation: Installs all integrations and copies YAML files, including integration conf.yaml and datadog.yaml, for a seamless migration experience.
    2. Agent upgrade: Installs integrations as YAML configurations, and preserves dependencies during the upgrade process.

Supported backup locations

  • Local machine
  • Remote machine
  • Cloud services:
    • AWS S3 buckets
    • Azure Blob storage
    • Google Cloud Storage

Ease of use

Unlike traditional backup methods that require manual installation and configuration, IBRT provides a simple and convenient way to create backups. You can easily create a backup of your Datadog configuration by running an on-demand command at the Agent level, or by scheduling periodic backups to run automatically. Additionally, restoring your backup is just as easy, requiring only a single script to get your configuration up and running again.

Support

For support or feature requests, contact Crest Data through the following channels:


This application is made available through the Marketplace and is supported by a Datadog Technology Partner. Click Here to purchase this application.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers