DingTalk

Overview

Integrate with DingTalk to:

  • Be notified of Datadog alerts and events in DingTalk
  • Share messages and graphs with your DingTalk group

Installation

The DingTalk integration is installed with the Datadog DingTalk integration tile.

Setup

To integrate Datadog with a DingTalk group:

  1. In the DingTalk app, navigate to Messages, and then click on the group where you want to add a Datadog integration.
  2. In the top right corner, click the Group Settings icon (it looks like an ellipsis) and choose Group Robot.
  3. On the Group Robot menu, select Datadog and click Add.
  4. Enter a name for the robot and click Finished. This returns a webhook address.
  5. Copy the webhook address and then click Finished.
  6. On the DingTalk integration tile, enter the DingTalk group where you added the Datadog integration into the Group Name field and paste the webhook address into the Group Robot Webhook field. Group names can contain letters, digits, and underscores.
  7. Click Install Configuration (or Update Configuration).

After installing or updating the integration, you can use the @-notification feature with your DingTalk group name.

Data Collected

Metrics

The DingTalk integration does not provide any metrics.

Events

The DingTalk integration does not include any events.

Service Checks

The DingTalk integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers