Google Cloud Filestore

Overview

Google Cloud Filestore is a managed file storage service for applications that require a filesystem interface and a shared filesystem for data.

Use the Datadog Google Cloud Platform integration to collect metrics from Google Cloud Filestore.

Setup

Installation

If you haven’t already, set up the Google Cloud Platform integration first. There are no other installation steps.

Log collection

Google Cloud Filestore logs are collected with Google Cloud Logging and sent to a Dataflow job through a Cloud Pub/Sub topic. If you haven’t already, set up logging with the Datadog Dataflow template.

Once this is done, export your Google Cloud Filestore logs from Google Cloud Logging to the Pub/Sub topic:

  1. Go to the Google Cloud Logging page and filter the Google Cloud Filestore logs.
  2. Click Create Export and name the sink.
  3. Choose “Cloud Pub/Sub” as the destination and select the Pub/Sub topic that was created for that purpose. Note: The Pub/Sub topic can be located in a different project.
  4. Click Create and wait for the confirmation message to show up.

Data Collected

Metrics

gcp.file.nfs.server.average_read_latency
(gauge)
Average latency for all disk read operations (Note: This metric is only populated for High Scale instances).
Shown as millisecond
gcp.file.nfs.server.average_write_latency
(gauge)
Average latency for all disk write operations (Note: This metric is only populated for High Scale instances).
Shown as millisecond
gcp.file.nfs.server.domain_reachable
(gauge)
True if at least one of the ADs DCs is reachable.
gcp.file.nfs.server.free_bytes
(gauge)
Total free disk bytes.
Shown as byte
gcp.file.nfs.server.free_bytes_percent
(gauge)
Total free disk bytes percentage.
Shown as percent
gcp.file.nfs.server.free_raw_capacity_percent
(gauge)
The free raw capacity as a percentage of the total space. Values are numbers between 0.0 and 100.0.
Shown as percent
gcp.file.nfs.server.instance_available
(gauge)
True if e2e NFS prober using sec=krb5 is able to probe instance.
gcp.file.nfs.server.locks
(gauge)
Number of locks.
Shown as lock
gcp.file.nfs.server.metadata_ops_count
(count)
Count of disk metadata operations (Note: This metric is only populated for High Scale instances).
Shown as operation
gcp.file.nfs.server.procedure_call_count
(count)
NFS server procedure call count.
gcp.file.nfs.server.read_bytes_count
(count)
Bytes read from disk.
Shown as byte
gcp.file.nfs.server.read_milliseconds_count
(count)
Count of milliseconds spent on disk read operations.
Shown as millisecond
gcp.file.nfs.server.read_ops_count
(count)
Count of disk read operations. Sampled every 60 seconds.
Shown as operation
gcp.file.nfs.server.snapshots_used_bytes
(gauge)
The number of bytes used by the snapshots.
Shown as byte
gcp.file.nfs.server.used_bytes
(gauge)
Total used disk bytes.
Shown as byte
gcp.file.nfs.server.used_bytes_percent
(gauge)
Total used disk bytes percentage.
Shown as percent
gcp.file.nfs.server.write_bytes_count
(count)
Bytes written to disk.
Shown as byte
gcp.file.nfs.server.write_milliseconds_count
(count)
Count of milliseconds spent on disk write operations.
Shown as millisecond
gcp.file.nfs.server.write_ops_count
(count)
Count of disk write operations.
Shown as operation

Events

The Google Cloud Filestore integration does not include any events.

Service Checks

The Google Cloud Filestore integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers