Hadoop Distributed File System (HDFS) Integration Error

If you are encountering errors when integrating with HDFS, first try upgrading pip and Snakebite by following these steps:

  1. Run: /opt/datadog-agent/embedded/bin/pip install –upgrade pip
  2. Run: /opt/datadog-agent/embedded/bin/pip install –upgrade snakebite
  3. Restart the Agent.

If these steps do not resolve your error, contact Datadog Support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers