NeoLoad

Supported OS Linux Windows Mac OS

Overview

Tricentis NeoLoad simplifies and scales performance testing for APIs and microservices, as well as end-to-end application testing through protocol and browser-based capabilities.

With the NeoLoad integration, you can track NeoLoad test performance metrics to:

  • Correlate application performance with load testing metrics in NeoLoad.
  • Analyze and visualize NeoLoad metrics in Datadog like throughput, errors, and performance using the out-of-the-box dashboard or Metrics Explorer.

Setup

Configuration

For detailed instructions on NeoLoad configuration, follow the NeoLoad documentation. Since NeoLoad version 9.1, you can choose which metrics to send in the Push Counters configuration of the Datadog Connector in NeoLoad.

Install the NeoLoad integration in Datadog to add the default NeoLoad dashboard to your dashboard list.

Data Collected

Metrics

NeoLoad.Controller.User.Load
(count)
Number of Virtual Users running during a NeoLoad test
Shown as user
NeoLoad.Controller.Throughput
(count)
Throughput during a NeoLoad test
Shown as megabyte
NeoLoad.Request.PerSecond
(rate)
Number of HTTP requests sent per second during a NeoLoad test
Shown as request
NeoLoad.Transaction.PerSecond
(rate)
Number of Transactions completed per second during a NeoLoad test
Shown as transaction
NeoLoad.Request.Errors
(count)
Number of errors during a NeoLoad test
Shown as error

Events

All NeoLoad performance tests events are sent to your Datadog Events Explorer. NeoLoad sends events to the Datadog API when a performance test starts and ends. Set the option in the Push Counters configuration of the Datadog Connector in NeoLoad. Available since NeoLoad 9.1.

Troubleshooting

Need help? Contact Datadog support or Tricentis NeoLoad support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers