Neutrona

Supported OS Linux Windows Mac OS

Integration version1.0.0

Overview

This check monitors Neutrona cloud connectivity services to:

  • Azure (ExpressRoute)

Setup

The Neutrona check is not included in the Datadog Agent package, so you need to install it.

Installation

For Agent v7.21+ / v6.21+, follow the instructions below to install the Neutrona check on your host. See Use Community Integrations to install with the Docker Agent or earlier versions of the Agent.

  1. Run the following command to install the Agent integration:

    datadog-agent integration install -t datadog-neutrona==<INTEGRATION_VERSION>
    
  2. Configure your integration similar to core integrations.

Configuration

  1. Edit the neutrona.d/conf.yaml file in the conf.d/ folder at the root of your Agent’s configuration directory to start collecting your Neutrona metrics. See the sample neutrona.d/conf.yaml for all available configuration options.

  2. Restart the Agent

Validation

Run the Agent’s status subcommand and look for neutrona under the Checks section.

Data Collected

Metrics

neutrona.azure.expressroute.egress_bps
(gauge)
Bits per second transmitted towards Azure over the ExpressRoute peering
neutrona.azure.expressroute.egress_interface_errors
(gauge)
Presence or absence of egress errors in the ExpressRoute NNI (Network-to-Network Interface)
neutrona.azure.expressroute.ingress_bps
(gauge)
Bits per second received from Azure over the ExpressRoute peering
neutrona.azure.expressroute.ingress_interface_errors
(gauge)
Presence or absence of ingress errors in the ExpressRoute NNI (Network-to-Network Interface)
neutrona.azure.expressroute.output_optical_power
(gauge)
Output optical power measured at the ExpressRoute NNI (Network-to-Network Interface)
neutrona.azure.expressroute.receiver_optical_power
(gauge)
Input optical power measured at the ExpressRoute NNI (Network-to-Network Interface)
neutrona.azure.expressroute.Two_Way_Delay
(gauge)
Round trip delay
Shown as microsecond
neutrona.azure.expressroute.Two_Way_DV
(gauge)
Jitter (delay variation)
Shown as microsecond
neutrona.azure.expressroute.Packet_Loss_Ratio
(gauge)
Packet loss ratio
Shown as percent

Service Checks

Neutrona does not include any service checks at this time.

Events

Neutrona does not include any events at this time.

Troubleshooting

Need help? Contact Datadog support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers