Nutanix

Supported OS Linux Windows Mac OS

marketplace
Integration version2.1.1

Overview

The Nutanix Integration monitors storage, CPU usage, read/write IOPS, and other metrics within Nutanix Clusters, to ensure that your environment is running at optimal performance at all times. The integration comes with 4 Dashboards which allows you to view your Nutanix Clusters from an overview, as well as getting granular and pin-pointing potential performance degradations. The Nutanix Integration also comes with monitors for key metrics such as storage utilization and deduplication savings, which are integral to the overall performance of the Nutanix environment.

Monitors

  1. Nutanix Cluster Storage Utilization
  2. Nutanix Cluster CPU Utilization
  3. Nutanix Cluster Deduplication Savings Ratio
  4. Nutanix Cluster Compression Savings Ratio

Dashboards

  1. RapDev Nutanix Overview
  2. RapDev Nutanix Clusters
  3. RapDev Nutanix Hosts and Disks
  4. RapDev Nutanix VMs

Support

For support or feature requests, contact RapDev.io through the following channels:


Made with ❤️ in Boston

This isn’t the integration you’re looking for? Missing a critical feature for your organization? Drop us a note, and we’ll build it!!


This application is made available through the Marketplace and is supported by a Datadog Technology Partner. Click Here to purchase this application.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers