SAP HANA

Supported OS Linux

marketplace
Integration version1.0.0

Overview

The SAP HANA integration monitors SAP HANA in-memory database systems. A system can host several database schemas and can be deployed on multiple nodes.

Using a remote agentless connection and preconfigured monitoring templates, this integration can go live in just a few minutes.

Monitoring is powered by Redpeaks (formerly known as Agentil Software - Pro.Monitor). It is configured out of the box to cover the most relevant KPIs of your database, including backups, transactions, service resources, table growth, and replication.

This integration collects and analyzes data from systems in real time and produces metrics and actionable events. You can finely tune the alerts by configuring Redpeaks and create Datadog monitors directly on the metrics.

Unlike with agent-based solutions, this platform’s monitoring configuration is all in a single location, eliminating the need to modify or install anything on the monitored systems.

Redpeaks integrates with SAP deployments of all types and sizes, whether you’re managing a single system or hundreds. It supports on-premise setups, private clouds, hybrid environments, and SAP RISE, offering flexibility to meet your unique needs.

Monitored modules

  • HANA nodes
  • Alerts
  • Backups
  • Service CPU
  • Service memory
  • Service disk
  • Blocked transactions
  • Connections
  • Threads
  • Replication status
  • Replication statistics
  • Table size (records, merge size, disk size)
  • SDI
  • Custom SQL requests
  • On demand monitors

Support

For support or feature requests, contact Redpeaks by email at support@redpeaks.io.

Further Reading

Additional helpful documentation, links, and articles:

If you are looking for a trustworthy partner for specific integrations with SAP or other platforms, you are in the right place - just get in touch with us.


This product is engineered and developed in Geneva, Switzerland.


This application is made available through the Marketplace and is supported by a Datadog Technology Partner. Click Here to purchase this application.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers