VNS3

Supported OS Linux Windows Mac OS

Overview

Get system and network state information from your Cohesive Networks VNS3 controller.

  • Peering links Status Check:

    peering

  • Overlay Clients Status Check:

    clients

  • IPSec tunnels Status Check:

    ipsec

  • Overlay Link Status Check:

    links

  • Remote Support Status Check:

    remote_support

  • Interface Status Check:

    interface_status

Setup

Configuration

Deploy and configure the Cohesive Networks Datadog plugin according to the Datadog Agent Plugin Details documentation.

Data Collected

Metrics

vns3.ipsec
(gauge)
IPSec tunnel connection state
vns3.overlay.clients
(gauge)
Overlay client connection state
vns3.peering
(gauge)
VNS3 peer reachability state
vns3.interfaces
(gauge)
Interface up/down state
vns3.overlay.links
(gauge)
LNK connection state
vns3.sys_admin.remote_support
(gauge)
Remote Support enabled state

Netflow, log reporting, and SNMP polling are also supported.

Events

The VNS3 integration does not include any events.

Service Checks

The VNS3 integration does not include any service checks.

Troubleshooting

Need help? Contact Datadog support or Cohesive Networks support.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers