このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

gcp_compute_firewall

allowed

Type: UNORDERED_LIST_STRUCT
Provider name: allowed
Description: The list of ALLOW rules specified by this firewall. Each rule specifies a protocol and port-range tuple that describes a permitted connection.

  • ip_protocol
    Type: STRING
    Provider name: IPProtocol
    Description: The IP protocol to which this rule applies. The protocol type is required when creating a firewall rule. This value can either be one of the following well known protocol strings (tcp, udp, icmp, esp, ah, ipip, sctp) or the IP protocol number.
  • ports
    Type: UNORDERED_LIST_STRING
    Provider name: ports
    Description: An optional list of ports to which this rule applies. This field is only applicable for the UDP or TCP protocol. Each entry must be either an integer or a range. If not specified, this rule applies to connections through any port. Example inputs include: [“22”], [“80”,“443”], and [“12345-12349”].

ancestors

Type: UNORDERED_LIST_STRING

creation_timestamp

Type: TIMESTAMP
Provider name: creationTimestamp
Description: [Output Only] Creation timestamp in RFC3339 text format.

denied

Type: UNORDERED_LIST_STRUCT
Provider name: denied
Description: The list of DENY rules specified by this firewall. Each rule specifies a protocol and port-range tuple that describes a denied connection.

  • ip_protocol
    Type: STRING
    Provider name: IPProtocol
    Description: The IP protocol to which this rule applies. The protocol type is required when creating a firewall rule. This value can either be one of the following well known protocol strings (tcp, udp, icmp, esp, ah, ipip, sctp) or the IP protocol number.
  • ports
    Type: UNORDERED_LIST_STRING
    Provider name: ports
    Description: An optional list of ports to which this rule applies. This field is only applicable for the UDP or TCP protocol. Each entry must be either an integer or a range. If not specified, this rule applies to connections through any port. Example inputs include: [“22”], [“80”,“443”], and [“12345-12349”].

description

Type: STRING
Provider name: description
Description: An optional description of this resource. Provide this field when you create the resource.

destination_ranges

Type: UNORDERED_LIST_STRING
Provider name: destinationRanges
Description: If destination ranges are specified, the firewall rule applies only to traffic that has destination IP address in these ranges. These ranges must be expressed in CIDR format. Both IPv4 and IPv6 are supported.

direction

Type: STRING
Provider name: direction
Description: Direction of traffic to which this firewall applies, either INGRESS or EGRESS. The default is INGRESS. For EGRESS traffic, you cannot specify the sourceTags fields.
Possible values:

  • EGRESS - Indicates that firewall should apply to outgoing traffic.
  • INGRESS - Indicates that firewall should apply to incoming traffic.

disabled

Type: BOOLEAN
Provider name: disabled
Description: Denotes whether the firewall rule is disabled. When set to true, the firewall rule is not enforced and the network behaves as if it did not exist. If this is unspecified, the firewall rule will be enabled.

id

Type: STRING
Provider name: id
Description: [Output Only] The unique identifier for the resource. This identifier is defined by the server.

kind

Type: STRING
Provider name: kind
Description: [Output Only] Type of the resource. Always compute#firewall for firewall rules.

labels

Type: UNORDERED_LIST_STRING

log_config

Type: STRUCT
Provider name: logConfig
Description: This field denotes the logging options for a particular firewall rule. If logging is enabled, logs will be exported to Cloud Logging.

  • enable
    Type: BOOLEAN
    Provider name: enable
    Description: This field denotes whether to enable logging for a particular firewall rule.
  • metadata
    Type: STRING
    Provider name: metadata
    Description: This field can only be specified for a particular firewall rule if logging is enabled for that rule. This field denotes whether to include or exclude metadata for firewall logs.
    Possible values:
    • EXCLUDE_ALL_METADATA
    • INCLUDE_ALL_METADATA

name

Type: STRING
Provider name: name
Description: Name of the resource; provided by the client when the resource is created. The name must be 1-63 characters long, and comply with RFC1035. Specifically, the name must be 1-63 characters long and match the regular expression [a-z]([-a-z0-9]*[a-z0-9])?. The first character must be a lowercase letter, and all following characters (except for the last character) must be a dash, lowercase letter, or digit. The last character must be a lowercase letter or digit.

network

Type: STRING
Provider name: network
Description: URL of the network resource for this firewall rule. If not specified when creating a firewall rule, the default network is used: global/networks/default If you choose to specify this field, you can specify the network as a full or partial URL. For example, the following are all valid URLs: - https://www.googleapis.com/compute/v1/projects/myproject/global/networks/my-network - projects/myproject/global/networks/my-network - global/networks/default

organization_id

Type: STRING

parent

Type: STRING

priority

Type: INT32
Provider name: priority
Description: Priority for this rule. This is an integer between 0 and 65535, both inclusive. The default value is 1000. Relative priorities determine which rule takes effect if multiple rules apply. Lower values indicate higher priority. For example, a rule with priority 0 has higher precedence than a rule with priority 1. DENY rules take precedence over ALLOW rules if they have equal priority. Note that VPC networks have implied rules with a priority of 65535. To avoid conflicts with the implied rules, use a priority number less than 65535.

project_id

Type: STRING

project_number

Type: STRING

resource_name

Type: STRING

Type: STRING
Provider name: selfLink
Description: [Output Only] Server-defined URL for the resource.

source_ranges

Type: UNORDERED_LIST_STRING
Provider name: sourceRanges
Description: If source ranges are specified, the firewall rule applies only to traffic that has a source IP address in these ranges. These ranges must be expressed in CIDR format. One or both of sourceRanges and sourceTags may be set. If both fields are set, the rule applies to traffic that has a source IP address within sourceRanges OR a source IP from a resource with a matching tag listed in the sourceTags field. The connection does not need to match both fields for the rule to apply. Both IPv4 and IPv6 are supported.

source_service_accounts

Type: UNORDERED_LIST_STRING
Provider name: sourceServiceAccounts
Description: If source service accounts are specified, the firewall rules apply only to traffic originating from an instance with a service account in this list. Source service accounts cannot be used to control traffic to an instance’s external IP address because service accounts are associated with an instance, not an IP address. sourceRanges can be set at the same time as sourceServiceAccounts. If both are set, the firewall applies to traffic that has a source IP address within the sourceRanges OR a source IP that belongs to an instance with service account listed in sourceServiceAccount. The connection does not need to match both fields for the firewall to apply. sourceServiceAccounts cannot be used at the same time as sourceTags or targetTags.

source_tags

Type: UNORDERED_LIST_STRING
Provider name: sourceTags
Description: If source tags are specified, the firewall rule applies only to traffic with source IPs that match the primary network interfaces of VM instances that have the tag and are in the same VPC network. Source tags cannot be used to control traffic to an instance’s external IP address, it only applies to traffic between instances in the same virtual network. Because tags are associated with instances, not IP addresses. One or both of sourceRanges and sourceTags may be set. If both fields are set, the firewall applies to traffic that has a source IP address within sourceRanges OR a source IP from a resource with a matching tag listed in the sourceTags field. The connection does not need to match both fields for the firewall to apply.

tags

Type: UNORDERED_LIST_STRING

target_service_accounts

Type: UNORDERED_LIST_STRING
Provider name: targetServiceAccounts
Description: A list of service accounts indicating sets of instances located in the network that may make network connections as specified in allowed[]. targetServiceAccounts cannot be used at the same time as targetTags or sourceTags. If neither targetServiceAccounts nor targetTags are specified, the firewall rule applies to all instances on the specified network.

target_tags

Type: UNORDERED_LIST_STRING
Provider name: targetTags
Description: A list of tags that controls which instances the firewall rule applies to. If targetTags are specified, then the firewall rule applies only to instances in the VPC network that have one of those tags. If no targetTags are specified, the firewall rule applies to all instances on the specified network.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers