このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Supported devices

The vendor profiles section below lists the network monitoring devices that Datadog supports with out-of-the-box profiles. Datadog can also monitor devices not included in this list using a generic profile, which collects basic metrics if applicable for those devices.

Generic profile

The generic profile collects metrics for all devices not supported by a vendor profile. Metrics include TCP, UDP, IP, and interface metrics such as bandwidth utilization, and volume sent/received.

Vendor profiles

The following vendor devices are supported with dedicated profiles. If a vendor or device type is supported, but the specific model isn’t, you can:

  • Create new profiles to start monitoring new device models.

  • Contact Datadog support to put in a request to support your specific model.

    Note: You can continue using NDM, as Datadog collects generic baseline metrics from all devices. If there are unsupported metrics from a vendor MIB, you can send a feature request to Datadog support with the following details:

    Run an snmpwalk from the requested device and send the following output:

    snmpwalk -O bentU -v 2c -c <COMMUNITY_STRING> <IP_ADDRESS>:<PORT> 1.3.6
    
  • Extend your profiles to support additional sysobjectid values.

    For example, if you want to monitor another type of Cisco CSR, you can modify the ISR profile directly to list another sysobjectid like this:

    snmpwalk -v 2c -c [community string] [ip address] 1.3.6.1.2.1.1.2
    

    Note: If you do not know the sysobjectid of your device, run an snmpwalk on a host that can reach your device. Use the output to list the profile to match against.

VendorConfig files
3com3com.yaml
3com-huawei.yaml.yaml
TP-Linktp-link.yaml
A10a10.yaml
Alcatel-lucentalcatel-lucent.yaml
Anueanue.yaml
Apc_apc.yaml
apc_ups.yaml _apc-metadata.yaml
Aristaarista.yaml
_arista.yaml
Arubaaruba-switch.yaml
_aruba-base.yaml
aruba-access-point.yaml
aruba.yaml
Audiocodesaudiocodes-mediant-sbc.yaml
Avayaavaya.yaml
Avocentavocent-acs.yaml
Avtechavtech.yaml
Barracudabarracuda.yaml
Bluecatbluecat-server.yaml
Brocadebrocade.yaml
Brotherbrother.yaml
Chatsworthchatsworth_pdu.yaml
Checkpointcheckpoint.yaml
checkpoint-firewall.yaml
Chrysalischrysalis.yaml
Cisco
Cisco ACI
Cisco ASA
Cisco ASR
Cisco Catalyst
Cisco ICM
Cisco ISE
Cisco ISR
Cisco Nexus
Cisco SB
Cisco UCS
Cisco WLC
cisco-3850.yaml
cisco-asa.yaml
cisco-asa-5525.yaml
cisco-asr.yaml
cisco-catalyst-wlc.yaml
cisco-catalyst.yaml
cisco-csr1000v.yaml
cisco_icm.yaml
cisco-ise.yaml
cisco-isr.yaml
cisco_isr_4431.yaml
cisco-nexus.yaml
cisco-sb.yaml
cisco-ucs.yaml
_cisco-metadata.yaml
_cisco-wlc.yaml
cisco-legacy-wlc.yaml
cisco_uc_virtual_machine.yaml
_cisco-voice.yaml
Citrixcitrix.yaml
Cradlepointcradlepoint.yaml
Cyberpowercyberpower-pdu.yaml
Delldell-poweredge.yaml
_dell.yaml
idrac.yaml
isilon.yaml
Dialogicdialogic-media-gateway.yaml
Dlinkdlink.yaml
Eatoneaton-epdu.yaml
Exagridexagrid.yaml
Extreme Networksextreme-switching.yaml
F5f5-big-ip.yaml
Fireeyefireeye.yaml
Fortinetfortinet.yaml
fortinet-fortigate.yaml
Gigamongigamon.yaml
HPhp-ilo4.yaml
_hp.yaml
hpe-proliant.yaml
Huawei_huawei.yaml
iXsystemsixsystems-truenas.yaml
IBMibm.yaml
Infinerainfinera-coriant-groove.yaml
Infobloxinfoblox-ipam.yaml
Juniper Networks_juniper.yaml
juniper-ex.yaml
_juniper-junos-generic.yaml
juniper-mx.yaml
Linksyslinksys.yaml
McAfeemcafee-web-gateway.yaml
Merakimeraki-cloud-controller.yaml
meraki.yaml
Mikrotikmikrotik-router.yaml
Nasuninasuni-filer.yaml
NECnec-univerge.yaml
NetAppnetapp.yaml
Netgearnetgear.yaml
NVIDIAnvidia.yaml
Omronomron-cj-ethernet-ip.yaml
Opengear_opengear.yaml
Palo Alto Networkspalo-alto.yaml
_palo-alto.yaml
Peplinkpeplink.yaml
pfSensepf-sense.yaml
Raritanraritan-dominion.yaml
Riverbedriverbed.yaml
Ruckusruckus.yaml
Server Ironserver-iron-switch.yaml
Servertechservertech.yaml
Silverpeaksilverpeak-edgeconnect.yaml
Sineticasinetica-eagle-i.yaml
Sophossophos-xgs-firewall.yaml
Synologysynology-disk-station.yaml
Tripplitetripplite.yaml
Ubiquiti_ubiquiti.yaml
Velocloudvelocloud-edge.yaml
Vertiv_vertiv.yaml
VMwarevmware-esx.yaml
Watchguardwatchguard.yaml
Western Digitalwestern-digital-mycloud-ex2-ultra.yaml
Zebrazebra-printer.yaml
Zyxelzyxel-switch.yaml

Further Reading

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers