このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Metadata

ID: csharp-best-practices/use-assembly-load

Language: C#

Severity: Notice

Category: Error Prone

Description

This rule is intended to catch when Assembly.LoadFromAssembly.LoadFile, or Assembly.LoadWithPartialName  are used. DataDog recommends using Assembly.Load which will include the full specification of the DLL that needs to be loaded. The other methods might end up with another one that could lead to unexpected behavior.

Non-Compliant Code Examples

static void Main(string[] args)
{
    Assembly.LoadFrom("");
    Assembly.LoadFile("");
    Assembly.LoadWithPartialName("");
}

Compliant Code Examples

static void Main(string[] args)
{
    Assembly.Load("");
}
https://static.datadoghq.com/static/images/logos/github_avatar.svg https://static.datadoghq.com/static/images/logos/vscode_avatar.svg jetbrains

Seamless integrations. Try Datadog Code Security

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers