Attempt to modify a 1Password item by user

Set up the 1password integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect when a 1Password user attempts to modify an item.

Strategy

This rule monitors 1Password audit logs to determine when the the enter-item-edit-mode item usage action occurs. This could indicate an attempt to modify an item.

Triage & response

  1. Investigate the {{@usr.email}} attempting to modify item {{@item_uuid}} within vault {{@vault_uuid}}.
  2. If this action was unintend by the user:
    • Rotate the user’s 1Password master password
    • Identify all the items that were modified and rotate the necessary authentication credentials
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers