Brute force attack on an Auth0 user

Set up the auth0 integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect a brute force attack on a user.

Strategy

To determine a successful attempt: Detect when the same user fails to login five times and then successfully logs in. This generates a MEDIUM severity signal.

To determine an unsuccessful attempt: Detect when the same user fails to login five times. This generates an INFO severity signal.

Triage and response

  1. Inspect the logs to see if this was a valid login attempt.
  2. See if 2FA was authenticated
  3. If the user was compromised, rotate user credentials.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers