An EKS Cluster's kubelet configuration file ownership should be assigned to root

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Ensure that if the kubelet refers to a configuration file with the --config argument. You should set its file ownership to maintain integrity and the file should be owned by root:root.

Remediation

Run the following command to fix the kubelet configuration file’s permissions:

chown root:root /etc/kubernetes/kubelet/kubelet-config.json

Note: The path above is the default location in EKS.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers