An EKS Cluster's kubelet configuration file should have permissions set to 644 or more restrictive

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

If the kubelet refers to a configuration file with the --config argument, ensure that the file has permissions set to 644 or to a more restrictive setting. If a file is specified, you should restrict its file permissions to maintain the integrity of the file. The file should be writable only by the administrators on the system.

Remediation

Run the following command to fix the kubelet configuration file’s permissions:

chmod 644 /etc/kubernetes/kubelet/kubelet-config.json

Note: The path above is the default location in EKS.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers