Network Firewall policies should have at least one associated rule group

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

This control verifies if a Network Firewall policy includes at least one stateful or stateless rule group.

A firewall policy dictates how traffic is monitored and managed within an Amazon Virtual Private Cloud (Amazon VPC). Configuring stateful and stateless rule groups enables packet filtering, regulates traffic flow, and establishes default traffic handling rules.

Remediation

For guidance on configuring firewall logging, refer to the Firewall policy settings in AWS Network Firewall section of the AWS Network Firewall Developer Guide.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers