AKS Cluster should have public access limited

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

When public access is enabled in an AKS cluster, it should be limited to a specific set of CIDRs. For security, public access should be limited to only the bare minimum set of IPs.

Remediation

  1. To limit public access, see the Azure AKS documentation on Modifying cluster endpoint access.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers