The AKS kubeconfig file should have permissions set to 644 or more restrictive

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

If kubelet is configured by a kubeconfig file, ensure that the kubeconfig file has permissions of 644 or more restrictive. The kubelet kubeconfig file contains authentication credentials used by the kubelet service in the worker node to connect to the main Kubernetes API. You should restrict its file permissions to maintain the integrity of the file. The file should only be writable by the administrators on the system.

Remediation

Run the following command to fix the kubelet configuration file’s permissions:

chmod 644 /var/lib/kubelet/kubeconfig

Note: The path above is the default location in AKS.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers