Azure Firewall Threat Intelligence Alert

azure

Classification:

threat-intel

Set up the azure integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect when an Azure firewall threat intelligence alert is received.

Strategy

Monitor Azure Network Diagnostic logs and detect when @evt.name is equal to AzureFirewallThreatIntelLog.

Triage and response

  1. Inspect the threat intelligence log.
  2. Investigate the activity from this IP address.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers