Instances should have IP forwarding disabled

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Compute Engine instance cannot forward a packet unless the source IP address of the packet matches the IP address of the instance. Similarly, GCP won’t deliver a packet whose destination IP address is different than the IP address of the instance receiving the packet. However, both capabilities are required if you want to use instances to help route packets.

Disable the forwarding of data packets to prevent data loss or information disclosure.

Rationale

To enable source and destination IP check, disable the canIpForward option, which allows an instance to send and receive packets with non-matching destination or source IPs.

Impact

Deleting instances that act as routers or packet forwarders may break network connectivity.

Exception

Instances created by GKE should be excluded because they need to have IP forwarding enabled and cannot be changed. Instances created by GKE have names that start with gke-.

Remediation

You can only edit the canIpForward setting at instance creation time. Therefore, if canIpForward is set to false for an instance, you must delete the instance and create a new one.

From the console

  1. Go to the VM Instances page: https://pantheon.corp.google.com/compute/instances.
  2. Select the VM Instance you want to remediate.
  3. Click the Delete button.
  4. On the VM Instances page, click CREATE INSTANCE.
  5. Create a new instance with the desired configuration. By default, the instance is configured to not allow IP forwarding.

From the command line

  1. Delete the instance:
    gcloud compute instances delete INSTANCE_NAME
    
  2. Create a new instance to replace it, with IP forwarding set to Off
    gcloud compute instances create
    

Default Value

By default, instances are not configured to allow IP forwarding.

References

  1. https://cloud.google.com/vpc/docs/using-routes#canipforward

Additional Information:

You can only set the canIpForward field at instance creation time. After an instance is created, the field becomes read-only.

CIS Controls

Version 8 - 4.4: Implement and Manage a Firewall on Servers

  • Implement and manage a firewall on servers, where supported. Example implementations include a virtual firewall, operating system firewall, or a third-party firewall agent.

Version 8 - 4.5: Implement and Manage a Firewall on End-User Devices

  • Implement and manage a host-based firewall or port-filtering tool on end-user devices, with a default-deny rule that drops all traffic except those services and ports that are explicitly allowed.

Version 7 - 11.1 Maintain Standard Security Configurations for Network Devices

  • Maintain standard, documented security configuration standards for all authorized network devices.

Version 7 - 11.2 Document Traffic Configuration Rules

  • All configuration rules that allow traffic to flow through network devices should be documented in a configuration management system with a specific business reason for each rule, a specific individual’s name responsible for that business need, and an expected duration of the need.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers