Authentication using Client Certificates should be disabled

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Client certificates should be disabled, which require certificate rotation, for authentication. Kubernetes does not have a way to revoke certificates at present and you should use another authentication method like OAuth.

Note: Basic authentication(static password) has been removed as of v1.19 in Kubernetes.

Remediation

  1. Go to the Kubernetes Engine
  2. Click CREATE CLUSTER
  3. Configure the cluster as required and the click on Availability, networking, security, and additional features section
  4. Ensure that the Issue a client certificate checkbox is not ticked
  5. Click CREATE.

References

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers