Jamf Protect alerts

Classification:

attack

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect when a Jamf Protect alert has been raised.

Strategy

Alerts are how Jamf Protect analytics, threat prevention database matches, and removable storage control events are reported.

Triage and response

  1. Investigate the threat event to determine if it is malicious or benign.
  2. If the alert is benign, consider including the user, host, or IP address in a suppression list. See Best practices for creating detection rules with Datadog Cloud SIEM.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers