Kube-proxy configuration file should have permissions of 600 or more restrictive

Set up the kubernetes integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

If kube-proxy is running, ensure that the file permissions of the kubeconfig file is set to 600. The kube-proxy’s kubeconfig file controls various parameters for the the service in the worker node. You should set its file permissions to maintain the integrity of the file.

Remediation

Run the below command (based on the file location on your system) on the each worker node:

chmod 600 <proxy kubeconfig file>
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers