The kubelet configuration file should be owned by root

Set up the kubernetes integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Ensure that if the kubelet refers to a configuration file with the --config argument, that file is owned by root:root. The kubelet reads various parameters, including security settings, from a config file specified by the --config argument.

Remediation

  1. Run the following command based on the file located in the --config parameter:
chown root:root /etc/kubernetes/kubelet.conf
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers