The kubelet configuration file should have permissions of 600 or more restrictive

Set up the kubernetes integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Ensure that if the kubelet refers to a configuration file with the --config argument, that file has permissions of 600 or more restrictive. The kubelet reads various parameters, including security settings, from the config file. The file should be writable by only the administrators on the system.

Remediation

  1. Run the following command based on the file located in the --config parameter:
chmod 600 /var/lib/kubelet/config.yaml
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers