LastPass vault content export attempt

Set up the lastpass integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect when a LastPass user attempts to modify a vault item.

Strategy

This rule monitors LastPass account logs to determine when a vault item is modified. This could indicate an attempt to modify an item.

Triage and response

  1. Investigate the user: {{@usr.name}} who triggered the event {{@evt.name}} involving vault item {{@VID}} within the vault.
  2. If this action was unintended by the user:
    • Rotate the user’s LastPass master password
    • Identify all the items that were modified and rotate the necessary authentication credentials
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers