Malicious IP connected to PostgreSQL database

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect database connections from IP addresses that are identified as malicious. Network access to database servers should be restricted.

Strategy

This rule monitors logs from PostgreSQL to detect when a connection originates from an IP identified as malicious. Datadog enriches all ingested logs with threat intelligence in real time.

A High signal is generated if the connection resulted in a successful login. A Low signal is generated if there was no login attempt or the login attempt failed.

Triage and response

  1. Determine if the user {{ @db.user }} is expected to authenticate from the IP {{ @network.client.ip }}.
  2. Restrict network access to the database. Remove any public access.
  3. If the login was successful review database logs for suspicious actions taken by the user {{ @db.user }}.
  4. Rotate credentials for the affected account.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers