Slack manual export downloaded

Set up the slack integration.

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Goal

Detect when a Slack manual export has been downloaded.

Strategy

This rule monitors Slack audit logs for when a manual export has been downloaded. With Slack, you can export data from your workspace or Enterprise Grid organization, this includes messages and links to files in public channels, private channels, and direct messages.

Triage and response

  1. Determine if the change taken by {{@usr.email}} is authorized.
  2. If the change was not authorized or was unexpected, begin your organization’s incident response process and investigate.
PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers