Ensure the Default Umask is Set Correctly For Interactive Users

このページは日本語には対応しておりません。随時翻訳に取り組んでいます。
翻訳に関してご質問やご意見ございましたら、お気軽にご連絡ください

Description

Remove the UMASK environment variable from all interactive users initialization files.

Rationale

The umask controls the default access mode assigned to newly created files. A umask of 077 limits new files to mode 700 or less permissive. Although umask can be represented as a four-digit number, the first digit representing special access modes is typically ignored or required to be 0. This requirement applies to the globally configured system defaults and the local interactive user defaults for each account on the system.

PREVIEWING: rodrigo.roca/enable-critical-path-and-exec-time-all-providers